| Agency: | Port Orange |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 29, 2026 |
| Due Date: | Jun 5, 2026 |
| Solicitation No: | ITB 26-06 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
ITB 26-06
|
| Bid Title: |
ITB 26-06 CAMBRIDGE PUMP STATION UPGRADES
|
| Category: | Construction Bids |
| Status: | Open |
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
15075 CONNECTIONS BETWEEN DISSIMILAR MATERIALS
15105 CHECK VALVE
15110 KNIFE GATE VALVE
15160 JACK AND BORE
00010-2
| Sod replacement, | |
|---|---|
| driveway, roadway and right-of-way repair, including concrete, asphalt, dirt, and gravel | |
| replacement in kind will be required at all disturbed areas. |
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
SECTION 01000
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 SCOPE AND INTENT
A. This project consists of the installation of approximately 250 feet of 54-inch DIP storm main and
250 feet of 72-inch steel casing by jack and bore under the FEC Railway running North to South.
Additionally, 445 feet of 72-inch PCCP storm main will be installed by open cut connecting the
proposed pump station to the outfall location east of the FEC railway. Sod replacement,
driveway, roadway and right-of-way repair, including concrete, asphalt, dirt, and gravel
replacement in kind will be required at all disturbed areas.
B. Work Included:
1. The Contractor shall furnish all supervision, labor, materials, power, light, heat, fuel, water,
tools, appliances, equipment, supplies, and means of construction necessary for the proper
performance and completion of the work. Contractor shall obtain and pay for all required
permits, if identified. Contractor shall perform and complete the work in the manner best
estimated to promote rapid construction consistent with safety of life and property and to the
satisfaction of the Owner, and in strict accordance with the Contract Documents. The
Contractor shall clean up the work and maintain it during and after construction, until
accepted, and shall do all work and pay all costs incidental thereto. Contractor shall repair or
restore all structures and property that may be damaged or disturbed during performance of
the work.
2. The cost of incidental work described in these General Requirements, for which there are no
specific Contract Items, shall be considered as part of the general cost of doing the work and
shall be included in the prices for the various Contract Items. No additional payment will be
made therefor.
3. The Contractor shall provide and maintain such modern materials, tools, and equipment as
may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable
manner all the work required by this Contract. Only equipment of established reputation and
proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy
of his workmanship, materials and equipment, prior acceptance of the Engineer
notwithstanding.
C. Public Utility Installations and Structures:
1. Public utility installations and structures shall be understood to include all poles, tracks, pipes,
wires, conduits, vaults, manholes and all other appurtenances and facilities pertaining thereto
whether owned or controlled by the Owner, other governmental bodies or privately owned by
individuals, firms or corporations, used to serve the public with transportation, traffic control,
gas, electricity, telephone, sewerage, drainage, water or other public or private property
which may be affected by the work shall be deemed included hereunder.
2. The Contract Documents contain data relative to existing public utility installations and
structures above and below the ground surface. This data is not guaranteed as to their
completeness or accuracy and it is the responsibility of the Contractor to make investigations
to fully understand the character, condition and extent of all such installations and structures
as may be encountered and as may affect the construction operations.
3. The Contractor shall protect all public utility installations and structures from damage during
the Work. Access across any buried public utility installation or structure shall be made only
in such locations and by means accepted by the Engineer. The Contractor shall so arrange
01000 - 1
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
his operations as to avoid any damage to these facilities. All required protective devices and
construction shall be provided by the Contractor at no additional expense to Owner or
Engineer. All existing public utilities damaged by the Contractor which are shown on the
Drawings or have been located in the field by the utility shall be repaired by the Contractor, at
his expense, as directed by the Engineer. No separate payment shall be made for such
protection or repairs to public utility installations or structures.
4. P ublic utility installations or structures owned or controlled by the Owner or other
governmental body which are shown on the Drawings to be removed, relocated, replaced or
rebuilt by the Contractor shall be considered as a part of the general cost of doing the Work
and shall be included in the prices bid for the various Contract items. No separate payment
shall be made therefor.
5. Where public utility installations of structures owned or controlled by the Owner or other
governmental body are encountered during the course of the Work, and are not indicated on
the Drawings or in the Specifications, and when, in the opinion of the Engineer, removal,
relocation, replacement or rebuilding is necessary to complete the Work under this Contract,
such work shall be accomplished by the utility having jurisdiction, or such work may be
ordered, in writing by the Engineer, for the Contractor to accomplish. If such work is
accomplished by the utility having jurisdiction it will be carried out expeditiously and the
Contractor shall give full cooperation to permit the utility to complete the removal, relocation,
replacement or rebuilding as required. If such work is accomplished by the Contractor, it will
be paid for as extra work as provided in the Agreement.
6. The Contractor shall, at all times in performance of the Work, employ accepted methods and
exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage or
destruction of public utility installations and structures; and shall, at all times in the
performance of the Work, avoid unnecessary interference with, or interruption of, public utility
services, and shall cooperate fully with the owners thereof to that end.
7. The Contractor shall give written notice to Owner, other governmental utility departments and
other owners of public utilities of the location of his proposed construction operations, at least
forty-eight (48) hours in advance of breaking ground in any area or on any unit of the Work. In
accordance with Florida Statute 556, the Contractor shall also call Florida State One Call of
Florida, Inc., (also called Sunshine State One Call Center) at least 48 hours prior to
excavating in any public rights-of-way. Their telephone number is (800) 432-4770.
8. The maintenance, repair, removal, relocation or rebuilding of public utility installations and
structures, when accomplished by the Contractor as herein provided, shall be done by
methods approved by the owners of such utilities.
9. The Contractor shall make provisions to avoid impacting existing facilities operation or
maintenance activities. If an impact is anticipated, the Contractor shall propose a means to
maintain existing activities, subject to approval by the Owner. The Owner will not be
responsible for any costs associated with such proposed modification.
1.02 DRAWINGS AND PROJECT MANUAL
A. Drawings: When obtaining data and information from the Drawings, figures shall be used in
preference to scaled dimensions, and large-scale drawings in preference to small scale
drawings.
B. Copies Furnished to Contractor: After the Contract has been executed, the Contractor will be
furnished up to five (5) complete sets of plans and five (5) copies of the Project Manual (Contract
Requirements and Specifications) and all addenda.
C. Supplementary Drawings:
01000 - 2
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
1. When, in the opinion of the Engineer, it becomes necessary to explain more fully the work to
be done or to illustrate the Work further or to show any changes which may be required,
drawings known as Supplementary Drawings, with specifications pertaining thereto, will be
prepared by the Engineer and the Contractor will be furnished up to five (5) sheets and one
(1) reproducible copy of any revised specifications.
2. The Supplementary Drawings shall be binding upon the Contractor with the same force as
the Drawings. Where such Supplementary Drawings require either less or more than the
estimated quantities of work, credit to the Owner or compensation therefor to the Contractor
shall be subject to the terms of the Agreement.
D. Contractor to Check Drawings and Data:
1. The Contractor shall verify all dimensions, quantities and details shown on the Drawings,
Supplementary Drawings, schedules, Specifications or other data received from the
Engineer, and shall notify him of all errors, omissions, conflicts, and discrepancies found
therein. Failure to discover or correct errors, conflicts or discrepancies shall not relieve the
Contractor of full responsibility for unsatisfactory work, faulty construction or improper
operation resulting therefrom nor from rectifying such conditions at no additional expense to
Owner or Engineer. Contractor will not be allowed to take advantage of any errors or
omissions, as full instructions will be furnished by the Engineer, should such errors or
omissions be discovered.
2. All schedules are given for the convenience of the Owner and the Contractor and are not
guaranteed to be complete. The Contractor shall assume all responsibility for the making of
estimates of the size, kind, and quality of materials and equipment included in work to be
done under the Contract and additional work claimed by Contractor.
E. Specifications: The Technical Specifications consist of three parts: General, Products and
Execution. The General Section contains General Requirements which govern the work.
Products and Execution modify and supplement these by detailed requirements for the work and
shall always govern whenever there appears to be a conflict.
F. Intent:
1. All work called for in the Specifications applicable to this Contract, but not shown on the
Drawings in their present form, or vice versa, shall be of like effect as if shown or mentioned
in both. Work not specified in either the Drawings or in the Specifications, but involved in
carrying out their intent or in the complete and proper execution of the Work, is required and
shall be performed by the Contractor as though it were specifically delineated or described.
2. The apparent silence of the Specifications as to any detail, or the apparent omission from
them of a detailed description concerning any work to be done and materials to be furnished,
shall be regarded as meaning that only the best general practice is to prevail and that only
material and workmanship of the best quality is to be used, and interpretation of these
Specifications shall be made upon that basis.
1.03 MATERIALS AND EQUIPMENT
A. Manufacturer:
1. The names of proposed manufacturers, material suppliers, and dealers who are to furnish
materials, fixtures, equipment, appliances or other fittings shall be submitted to the Engineer
for acceptance, prior to construction, to afford proper investigation and checking. No
manufacturer will be accepted for any materials to be furnished under this Contract unless he
shall be of good reputation and have a plant of ample capacity. Contractor shall, upon the
request of the Engineer, be required to submit evidence that he has manufactured a similar
product to the one specified and that it has been previously used for a like purpose for a
01000 - 3
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
sufficient length of time to demonstrate its satisfactory performance.
2. All transactions with the manufacturers or subcontractors shall be through the Contractor,
unless the Contractor shall request, in writing to the Engineer, that the manufacturer or
subcontractor deal directly with the Engineer. Any such transactions shall not in any way
release the Contractor from his full responsibility under this Contract and will not impose any
liability on the Owner or Engineer.
3. Any two or more pieces of material or equipment of the same kind, type or classification, and
being used for identical types of service, shall be made by the same manufacturer.
B. Delivery:
1. The Contractor shall deliver materials to the site in ample quantities to ensure the most
speedy and uninterrupted progress of the work so as to complete the work within the allotted
time. However, the Contractor shall not store materials on-site for more than ninety (90) days
before installation or store equipment for more than thirty (30) days before installation. This
will not supersede more stringent requirements noted elsewhere in the Contract Documents.
2. The Contractor shall also coordinate deliveries in order to avoid delay in, or impede, the
progress of the work of any related Contractor.
3. All materials and equipment shall be properly stored on site in accordance with these
specifications and the manufacturer's recommendations. Items stored improperly will be
refused for installation.
C. Tools and Accessories:
1. The Contractor shall, unless otherwise stated in the Contract Documents, furnish with each
type, kind or size of equipment, one complete new and unused set of suitably marked high
grade special tools and appliances which may be needed to adjust, operate, maintain or
repair the equipment. Such tools and appliances shall be furnished in accepted painted steel
cases, properly labeled and equipped with good grade cylinder locks and duplicate keys.
2. Each piece of equipment shall be provided with a substantial nameplate, securely fastened in
place and clearly inscribed with the manufacturer's name, year of manufacture, serial
number, weight and principal rate data.
D. Service of Manufacturer's Engineer:
1. The Contract prices for equipment shall include the cost of furnishing a competent and
experienced engineer or superintendent who shall represent the manufacturer and shall
assist the Contractor, when required, to install, adjust, test and place in operation, the
equipment in conformity with the Contract Documents.
2. Prior to the equipment being placed in permanent operation by the Owner, such engineer or
superintendent shall make all adjustments and tests required by the Engineer to prove that
such equipment is in proper and satisfactory operating condition, and shall instruct such
personnel as may be designated by the Owner in the proper operation and maintenance of
such equipment.
1.04 INSPECTION AND TESTING
A. General:
1. For tests specified to be made by the Contractor, the testing personnel shall make the
necessary inspections and tests and the reports thereof shall be in such form as will facilitate
checking to determine compliance with the Contract Documents. Two (2) originally executed
01000 - 4
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
and five copies of the reports shall be submitted and authoritative certification thereof shall be
furnished to the Engineer as a prerequisite for the acceptance of any material or equipment.
2. If, in the making of any test of any material or equipment, it is ascertained by the Engineer
that the material or equipment does not comply with the Contract Documents, the Contractor
will be notified thereof and he will be directed to refrain from delivering said material or
equipment, or to remove it promptly from the site or from the work and replace it with
acceptable material, without cost to the Owner or Engineer.
3. Tests of electrical and mechanical equipment and appliances shall be conducted in
accordance with recognized test codes of the ANSI, ASME, or the IEEE, except as may
otherwise be stated herein.
4. The Contractor shall be fully responsible for the proper operation of equipment during tests
and instruction periods and shall neither have nor make any claim for damage which may
occur to equipment prior to the time when the Owner executes final acceptance of the work.
B. Costs:
1. The cost of preliminary shop and field tests of equipment and certain other tests specifically
called for in the Contract Documents shall be borne by the Contractor and such costs shall be
deemed to be included in the Contract price.
2. Materials and equipment submitted by the Contractor as the equivalent to those specifically
named in the Contract may be tested by the Owner for compliance. The Contractor is
responsible for providing sufficient information to allow Engineer to determine that the item of
material or equipment proposed is equivalent to that specifically named and an acceptable
substitute therefor. If in the sole discretion of the Engineer, tests of the proposed substitute
items are necessary for Engineer's review, the substitute items will be tested by the
Contractor at no additional cost to the Owner.
C. Inspection of Materials:
1. The Contractor shall give notice in writing to the Engineer, sufficiently in advance of his
intention to commence the manufacture or preparation of materials especially manufactured
or prepared for use in or as part of the permanent construction. Such notice shall contain a
request for inspection, the date of commencement and the expected date of completion of
the manufacture or preparation of materials. Upon receipt of such notice, the Engineer will
arrange to have a representative present at such times during the manufacture as may be
necessary to inspect the materials or Engineer will notify the Contractor that the inspection
will be made at a point other than the point of manufacture.
2. The Contractor must comply with these provisions before shipping any material. Such
inspection shall not release the Contractor from the responsibility for furnishing materials
meeting the requirements of the Contract Documents.
D. Certificate of Manufacture:
1. The Contractor shall furnish to Engineer authoritative evidence in the form of Certificate of
Manufacture that the materials to be used in the work have been manufactured and tested in
conformity with the Contract Documents.
2. These certificates shall be notarized and shall include copies of the results of physical tests
and chemical analyses, where necessary, that have been made directly on the product to be
provided by the manufacturer. Two (2) original and five (5) copies are to be provided to the
Engineer.
E. Shop Tests:
01000 - 5
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
1. Testing for pressure, duty, capacity, rating, efficiency, performance, function or special
requirements which are specified shall be tested in the shop of the manufacturer in a manner
which shall conclusively prove that its characteristics comply fully with the requirements of the
Contract Documents.
2. No such equipment or materials shall be shipped to the Work site until the Engineer notifies
the Contractor, in writing, that the results of such tests are acceptable.
3. Two (2) signed original and five (5) copies of the manufacturer's actual test data and
interpreted results thereof, accompanied by two (2) signed original and five (5) copies of a
certificate of authenticity sworn to by a responsible official of the manufacturing company
and/or independent laboratory, shall be forwarded to the Engineer for acceptance.
4. The cost of shop tests and of furnishing manufacturer's preliminary and shop test data of
operating equipment shall be borne by the Contractor.
F. Final Inspection: During such final inspections, the Work shall be clean and functional. In no
case will the final estimate be prepared until the Contractor has complied with all requirements
set forth and the Engineer and Owner have made their final inspection of the entire Work and
are satisfied that the entire Work is properly and satisfactorily constructed in accordance with the
requirements of the Contract Documents.
1.05 TEMPORARY STRUCTURES
A. Temporary Fences: If, during the course of the Work, it is necessary to remove or disturb any
fence or part thereof, the Contractor shall provide a suitable temporary fence at no additional
cost to Owner or Engineer.
B. Responsibility for Temporary Structures: In executing the Contract, the Contractor assumes full
responsibility for the sufficiency and safety of all temporary structures or work and for any
damage which may result from their failure or their improper construction, maintenance or
operation and will indemnify and hold harmless the Owner and Engineer from all claims, suits or
actions and damages or costs of every description arising by reason of failure to comply with the
above provisions.
1.06 ACCIDENT PREVENTION
A. Precautions shall be exercised at all times for the protection of person and property. The safety
provisions of applicable laws, building and construction codes shall be observed.
B. The Contractor shall comply with the U.S. Department of Labor Safety and Health Regulations
for construction promulgated under the Occupational Safety and Health Act of 1970 (PL 91-596),
and under Hours and Safety Standards Act Section 107 of the contract Work. Hours and Safety
Standards Act (PL 91-54), except where state and local safety standards exceed the federal
requirements and except where state safety standards have been approved by the Secretary of
Labor in accordance with provisions of the Occupational Safety and Health Act, shall be
complied with.
C. First Aid: The Contractor shall keep upon the site, at each location where work is in progress, a
completely equipped first aid kit and shall provide ready access thereto at all times when men
are employed on the Work.
1.07 LINES AND GRADES
A. Grade:
1. All work under this Contract shall be constructed in accordance with the lines and grades
shown on the Drawings, or as provided by the Engineer. The full responsibility for keeping
alignment and grade shall rest upon the Contractor.
01000 - 6
City of Port Orange
Cambridge Canal Basin - Stormwater Pond Repair
2. The Owner will provide available information regarding bench marks and base line controlling
points on the drawings. Reference marks for lines and grades as the work progresses will be
located by Contractor to cause as little inconvenience to the prosecution of the Work as
possible. The Contractor shall so place excavation and other materials as to cause no
inconvenience in the use of the reference marks provided. The Contractor shall remove any
obstructions placed contrary to this provision.
B. Surveys:
1. The Contractor shall furnish and maintain, at no additional expense to Owner or Engineer,
stakes, temporary benchmarks and other such materials.
2. The Contractor shall check such reference marks by such means as he may deemed
necessary and, before using them, shall provide written notification to Engineer's regarding
presumed inaccuracies.
3. The Contractor shall, at no additional expense to Owner or Engineer, establish all working or
construction lines and grades as required from the reference marks made available by the
Owner, and shall be solely responsible for the accuracy thereof.
C. Safeguarding Marks:
1. The Contractor shall safeguard all points, stakes, grade marks, monuments and bench marks
made or established on the Work, bear the cost of reestablishing them if disturbed, and bear
the entire expense of rectifying work improperly installed due to not maintaining or protecting
or to removing without authorization such established points, stakes and marks.
2. The Contractor shall safeguard all existing property corners, monuments and marks adjacent
to but not related to the Work, whether known or discovered, and shall bear the cost of
reestablishing them in identical manner if disturbed or destroyed.
1.08 ADJACENT STRUCTURES AND LANDSCAPING
A. Responsibility:
1. In addition to all work within the Temporary Construction Easement, the Contractor shall be
entirely responsible and liable for all damage or injury as a result of Contractor's operations to
all other adjacent public and private property, structures of any kind and appurtenances
thereto met with during the progress of the Work.
2. The cost of protection, replacement in their original locations and conditions or payment of
damages for injuries to such adjacent public and private property and structures affected by
the work, whether or not shown on the Drawings, and the removal, relocation and
reconstruction of such items called for on the Drawings or specified shall be included in the
various Contract Items and no separate payments will be made therefore.
3. Contractor is expressly advised that the protection of buildings, structures, tanks, pipelines,
etc. and related work adjacent and in the vicinity of his operations, wherever they may be, is
solely their responsibility.
4. Conditional inspection of buildings or structures in the immediate vicinity of the project which
may reasonably be expected to be affected by the Work shall be performed by and be the
responsibility of the Contractor.
5. Contractor shall, before starting operations, make an examination of the adjacent structures,
buildings, facilities, etc., and record by notes, measurements, photographs, etc., conditions
which might be aggravated by open excavation and construction. Repairs or replacement of
all conditions disturbed by the construction shall be made to the satisfaction of the Owner and
01000 - 7
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
26-C-00042 26-C-00042 Forest Hills Park Pump Station Replacement View Details Posted: Wednesday, July
City of Tampa
Bid Due: 8/04/2026
Project ID: CC-7100-26/HSM (A) Title: Wastewater Pump Station R & R Addenda: 0
Seminole County
Bid Due: 8/05/2026
Project ID: Title: Irrigation Pump Station Removal & Replacement Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 8/06/2026
26-C-00042 26-C-00042 Forest Hills Park Pump Station Replacement View Details Posted: Wednesday, July
City of Tampa
Bid Due: 8/04/2026