CITY OF GRANTS PASS
WATER RESTORATION PLANT, SECONDARY CLARIFIER RECOATING
PROJECT NO. SE6447
INVITATION TO BID
SEALED BID PROPOSALS for furnishing all labor, materials, equipment and services required for
the construction of the SECONDARY CLARIFIER RECOATING PROJECT at the Water
Restoration Plant in the City of Grants Pass are now being accepted. Bids will be accepted by the
City Recorder at the City of Grants Pass Administration Office at 101 N.W. “A” Street, Room 205,
Grants Pass, Oregon, Attn: City Recorder, until 3:00 P.M., Thursday, April 23, 2026, at which
time they will be publicly opened and read in the City of Grants Pass City Manager’s
Conference Room, and after which they will not be received or accepted.
THE PROPOSED WORK INCLUDES APPROXIMATELY THE FOLLOWING:
THE PROJECT CONSISTS OF RECOATING THE MECHANISM IN SECONDARY CLARIFIER
NO. 1 INCLUDING: REMOVAL AND REINSTALLATION OF THE DRIVE; DIS-ASSEMBLY,
RECOATING, AND RE-ASSEMBLY OF THE CLARIFIER MECHANISM; REPAIR AND
RECOATING OF THE EFFLUENT TROUGH; REPLACEMENT OF FASTENERS AND SLUDGE
COLLECTOR PIPES; AND ANCILLARY WORK.
Bid Documents and Construction Drawings for the work may be downloaded on or after Thursday,
March 26, 2026 from the City Website at www.grantspassoregon.gov/bids.aspx. All information
related to this project will be posted on the City of Grants Pass Website “Bids”.
A NON-MANDATORY Pre-Bid Meeting will be held at the Water Restoration Plant located at
1200 SW Greenwood Avenue, Grants Pass, Oregon, on Thursday, April 8, 2026, at 11:00 a.m.
local time.
Bidders must be prequalified in conformance with Oregon Revised Statute 279C.430 or the
Grants Pass Municipal Code. A prequalification form must be submitted to the City five calendar
days prior to the bid opening date in order for the bid to be considered. ALL PREQUALIFICATION
FORMS ARE DUE NO LATER THAN 5:00 P.M. ON FRIDAY, APRIL 16, 2026. If the
prequalification form is not submitted five calendar days prior to the bid opening date or the bidder
has not prequalified with the City within the previous 12 months, the bid will be automatically
rejected, remain unopened, marked as “Rejected” and filed with the other bids.
The class or classes of work for which bidders must prequalify are the following: BUILDINGS,
PAINTING, AND BRIDGES AND STRUCTURES.
If the bidder has prequalified with the City within one year prior to the Bid Opening, and such
prequalification is for the call of work as stated above with no substantial change, then it will not be
necessary to prequalify again for this bid.
Bidder shall state as part of the bid that the provisions of ORS 279C.800 to 279C.870 (Prevailing
Wage Rate) shall be complied with.
ADVERTISEMENT
SE6447 - WRP Secondary Clarifier No. 1 Recoating
Page 1 of 2
The City of Grants Pass may reject any bid not in compliance with all public bidding procedures and
requirements, may waive any irregularities, and may reject for good cause any or all bids upon a
finding of the City it is in the public interest to do so.
SPECIAL NOTE! All work associated with Secondary Clarifier No. 1 recoating shall be substantially
completed by September 15, 2026, and fully completed by September 30, 2026.
Dated this: MONDAY, THE 23RD DAY OF MARCH 2026
Wade Elliott, Assistant Public Works
Director
Engineering Division
Authorized Representative of the
City of Grants Pass, Oregon
To be published: WEDNESDAY, THE 25TH DAY OF MARCH 2026 (DJC)
ADVERTISEMENT
SE6447 - WRP Secondary Clarifier No. 1 Recoating
Page 2 of 2