Invitation to Bid – Sand Hollow Pump Station Meter Replacement
| Agency: | Washington County Water Conservancy District |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 15, 2025 |
| Due Date: | Sep 2, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Invitation to Bid - Sand Hollow Pump Station Meter Replacement |
|
PUBLIC NOTICE Separate sealed bids for Sand Hollow Pump Station Meter Replacement Project will be received by the Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 3:30 pm, Tuesday, September 02, 2025. At that time bids will be publicly opened and read aloud. The Project consists of removal of the existing meter vault and piping, removal of existing 60” welded steel pipeline and the installation of new 60 inch flanged pipe, construction of a new concrete vault, installing owner furnished meter, and furnishing and installing a new submersible pump in an existing drain manhole, and miscellaneous related work. No pre-bid conference will be held. Contact Alpha Engineering at Todd Gardner, P.E., (435) 628-6500, toddgardner@alphaengineering.com to be placed on the plan holders list. Bidders must be on the plan holders list to submit a bid. Copies of the Contract Documents and Specifications may be examined and/or obtained at Alpha Engineering, 43 South 100 East, Suite 100, St. George, Utah 84770. Printed copies are available for $75.00 per set. |
| Project Information | |
| Project Type | Invitation for Bids |
| Project Manager |
Todd Gardner, P.E. (toddgardner@alphaengineering.com) Send Email |
| Project Description |
The Project consists of removal of the existing meter vault and piping, removal of existing 60” welded steel pipeline and the installation of new 60 inch flanged pipe, construction of a new concrete vault, installing owner furnished meter, and furnishing and installing a new submersible pump in an existing drain manhole, and miscellaneous related work. No pre-bid conference will be held. |
| Consultant(s) | Todd Gardner, P.E. |
| Open | August 15, 2025 |
| Close | September 2, 2025 3:30 pm |
| Vendor(s) | n/a |
See Also
Project: JH27-104 Potato Cyst Nematode (PCN) 5-Year Sampling Contract Ref. #: JH27-104 Department:
State Government of Utah
Due by 9/30/2026
Project: Part 8 - Final Ref. #: JM27-110 Department: Division of Purchasing Type:
State Government of Utah
Due by 9/22/2026
Project: CMPRP - Silver Kite Community Arts Ref. #: JM27-109 Department: Division of
State Government of Utah
Due by 9/21/2026
Project: Market Research for Student Meal Plan & Food Services Ref. #: 26-0910
State Government of Utah
Due by 9/25/2026