| Agency: | Manatee County School District |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 16, 2025 |
| Due Date: | Nov 13, 2025 |
| Solicitation No: | 27-0002-KD |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
|
Dears, here are 6 questions:
1. Please inform quantities for the following item, “Switches must connect to each sites core switch with 10-Gigabit LC LRM fiber Gbics”. 2. Please inform quantities and topology for the following item, “Each IDF closet must support a single 10-Gigabit LC LRM fiber Gbic for connection back to the site’s MDF switch”. 3. Please inform quantities and topology for the following item, “Each MDF closet switch design must be able to support up to a minimum of 240– RJ-45 autosensing 10/100/1000 PoE+ ports with 2 open 10GbE SFP+ transceiver slots (4 or 8 open module slots for support of 10GbE SFP+ transceivers or RJ-45 autosensing 10/100/1000 PoE+ ports or any combination thereof). Each closet configuration will vary”. 4. Please inform quantities for the following item, “Aruba 10G SFP+ LC LRM Multi Mode Transceiver (J9152D or equivalent)”. 5. Please inform quantities for the following item, “Aruba X132 10G SFP+ LC LR (10k) Single Mode (J9151D or equivalent)”. 6. Please inform quantities for the following item, “Aruba X132 10G SFP+ LC ER (40k) Single Mode (J9153D or equivalent)”. |
10/14/2025 9:47:28 AM | ||
| Should services for uninstalling existing equipment, installing new equipment, configuration, and other services be quoted? If so, please provide details. | 10/14/2025 1:02:19 PM | ||
| Is it permitted to submit a proposal in a consortium (two companies)? If so, what is required? | 10/16/2025 9:24:54 AM |
| Code | Description |
| [206-23] | Communication Processors and Protocol Converters: Front-End Processor, Network Interface Module, Protocol Interchange, Switching Controls, etc. |
| [206-55] | Integrated Hardware-Software I.T. Solution (Mini/Mainframe Computer) |
| [206-59] | Modems, External Data Communications |
| [206-64] | Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc. |
| [204-13] | Cables: Printer, Disk, Network, etc. |
| [204-28] | Data Entry and Remote Job Entry Devices, Voice Activated: Voice Recognition, Voice Digitization, Speech Synthesizers, etc. |
| [204-58] | Modems, External, Data Communications |
| [204-64] | Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc. |
| [055-68] | Monitors, Computerized and Wireless (Including Equipment Utilization, Engine/Driver Performance, Brakes, Lights, RPM, Temperature, etc.) |
| Publication | Date |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Y26-748 Title: East Water Reclamation Facility SCADA Upgrades with Fiber and
Orange County
Bid Due: 7/14/2026
Description: Pathway and Minor Continuing Services Construction Contract Department: Engineering & Public Works
Palm Beach County
Bid Due: 5/15/2030
Project ID: 20260256 Title: Northport Utility Site Stormwater Improvements Addenda: 0 Release Date:
City of Port St. Lucie
Bid Due: 8/04/2026
CONS-BOCADRAINAGE/0908 - Construction of a Master Storm Water System Department: Utilities Category: Construction
City of Punta Gorda
Bid Due: 7/24/2026