Interior and Exterior Door and Frame Replacement Addendum 2

Agency: Francis Howell School District
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238320 - Painting and Wall Covering Contractors
  • 238350 - Finish Carpentry Contractors
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Dec 9, 2025
Due Date: Dec 12, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Interior and Exterior Door and Frame Replacement
Addendum I
Addendum II

  • Opened: November 12, 2025
  • Mandatory Pre-Bid: December 2, 2025, at 10:00 a.m. at Francis Howell Middle School
  • Closes: December 12, 2025, at 11:00 a.m.

Attachment Preview

NOTICE
Francis Howell R-III School District
Request for Proposal
​ Replacement of Interior and Exterior Doors and
Frames
ISSUE DATE: November 12, 2025
RETURN RESPONSE NO LATER THAN:
December 12, 2025 @ 11:00 a.m., CST
Public Bid Opening December 12, 2025 @ 11:00 a.m. CST
801 Corporate Centre Drive, O’Fallon, MO 63368
MANDATORY PRE–BID MEETING:
December 2, 2025 @ 10:00 a.m. CST
A mandatory pre-bid meeting will be held at Francis Howell Middle, 825 O’Fallon Rd, St. Charles, MO
63304, with subsequent visits to each site to review project requirements. Attendance at this meeting is
required for all bidders; no follow-up site visits will be allowed to minimize disruption to school
operations.
RETURN RESPONSE AND ADDENDA TO:
Francis Howell R-III School District
ATTN: Mr. Matthew Bollwerk, Purchasing Manager
801 Corporate Centre Drive
O’Fallon, MO 63368
TABLE OF CONTENTS
Certification Form
Sections:
1)​ Introduction
2)​ Project Overview
3)​ Scope of Services
4)​ Contractor Requirements
5)​ Timeline for Process
6)​ Selection Criteria
7)​ Proposal Requirements
8)​ Selection Process
Attachments
1)​ Company Identification
2)​ References and Experience
3)​ Federal Work Authorization Program
(E-Verify) Addendum
4)​ Federal work Authorization Program Affidavit
5)​ Felony Conviction Notification
General Terms and Conditions
Francis Howell R-III School District
Request for Proposal
Replacement of Interior and Exterior Doors
CERTIFICATION FORM
The Francis Howell R-III School District will accept sealed proposals for the replacement of interior and
exterior doors in the District as described in the attached request. Qualified organizations (Respondents)
are required to submit one (1) physical copy as described herein.
PROPOSALS SHALL BE LABELED AND ADDRESSED AS FOLLOWS:
SEALED PROPOSAL-REPLACEMENT OF INTERIOR AND EXTERIOR DOORS
Mr. Matthew Bollwerk, Purchasing Manager
Francis Howell R-III School District
801 Corporate Centre Drive
O’Fallon, MO 63368
The Respondent hereby declares understanding, agreement and certification of compliance to provide the
items and/or services, in accordance with all terms and conditions, requirements and specifications of the
original Request for Proposal (RFP), General Terms and Conditions, and as modified by any addenda
thereto. Respondent is required to complete, sign and return this form with the proposal.
SIGNATURE REQUIRED
Authorized Signature
Printed Name
Company Name
Mailing Address
City, State, Zip
Mobile Phone #:
Date
Title
E-Mail Address
Page 2
Section 1.0 - Introduction
The Francis Howell School District is the top-rated school district in St. Charles County and 13th in the
state, as ranked by Niche.com. Encompassing more than 150 square miles in the southeast corner of St.
Charles County, the District empowers students to be lifelong learners prepared for the future. Currently
the District serves over 17,000 students and employs over 2,200 people, over 23 campuses. Additional
detailed information about the District may be found at www.fhsdschools.org
Section 2.0 – Project Overview
The Facilities and Operations Department of the Francis Howell School District (District) is soliciting
proposals from qualified vendors to remove and replace existing interior and exterior doors and frames
with Fiberglass Reinforced Plastic (FRP) doors, aluminum frames, and related door hardware. The intent
is to establish a contract for materials and installation services that meet or exceed the District’s quality,
durability, and performance standards for existing openings at the following locations:
Section 3.0 – Scope of Work
The Contractor shall furnish all labor, materials, equipment, supervision, and disposal services required to
remove and replace existing door and window assemblies at designated school locations within the
Francis Howell School District. Work shall include removal of existing hollow metal and aluminum
assemblies, installation of new FRP doors and aluminum frames, and integration of new hardware,
glazing, and access control components as specified herein. All installations shall comply with
manufacturer recommendations, applicable building codes, ADA standards, and District specifications.
Contractor shall coordinate scheduling and site access with the District’s Facilities Department to
minimize disruption to normal operations.
1.​ Francis Howell Middle (FHM)
Door Openings to be Replaced:
●​ Doors 2, 19, and 20: Replace with glass doors (like for like).
●​ Doors 7 and 10: Replace with 3" x 33" view light doors.
●​ Doors 3, 4, 5, 6, 8, 9, 12, 13, 14, 15, 16, and 17: Replace with solid doors (no glass).
Scope:
●​ Remove existing interior and exterior hollow metal doors and frames.
●​ Install new Fiberglass Reinforced Plastic (FRP) doors and aluminum frames with all required new
hardware.
●​ FRP finish, hardware, and sightlines to match the main entrance.
●​ Ensure proper door alignment, secure fastening, weather sealing, and smooth operation.​
2.​ Francis Howell Central (FHC)
Door Opening to be Replaced:
●​ Door 2 (Auditorium): Replace with glass door (like for like).
Scope:
●​ Remove existing interior and exterior hollow metal doors and frames.
●​ Install new FRP doors and aluminum frames with new hardware.
●​ FRP finish to match the main entrance.​
Page 3
3.​ Francis Howell High (FHH)
Door Opening to be Replaced:
●​ Door 36 (Auditorium): Replace with glass door (like for like).
Scope:
●​ Remove existing aluminum storefront doors and frames, both interior and exterior units.
●​ Install new wide-stile aluminum doors with new aluminum framing and hardware.
●​ Finish to be dark bronze anodized, consistent with existing adjacent systems.​
4.​ Francis Howell High (FHH) – Auditorium Windows (Ticket Booth Area)
Scope:
●​ Remove existing aluminum storefront windows and glass.
●​ Install new aluminum storefront window system in dark bronze finish with 1" insulated
bronze-tinted glass.​
5.​ Hardware Requirements
All hardware shall be commercial-grade and meet or exceed ANSI/BHMA standards for institutional use.
Hardware shall be provided new, factory-finished, and compatible with the District’s existing keying and
access control systems. All hardware shall be installed per manufacturer specifications. Contractor shall
test and confirm full operation of all mechanical, electrical, and access control components prior to
project closeout.
Specific Hardware Requirements Include:
●​ SFIC cylinders: Best brand
●​ Keyed mullions: KR4954
●​ Keyed dog downs
●​ Thresholds (aluminum, ADA-compliant)
●​ Continuous hinges (heavy-duty stainless steel or aluminum)
●​ Exit devices: Von Duprin 99 panic devices with NL (night latch) function
●​ Closers: LCN 4040XP series
●​ Closer arms: LSDA T-handle hold-open
●​ Roller strikes: Von Duprin
●​ Door sweeps: Brush-type, full-width
●​ Access control hardware: Schlage AD-300 series (wired)
●​ Wire transfer hinge for power and data connections to access control devices
●​ ADA operator: LCN Senior Swing automatic door operator
●​ Surface-mounted burglar contacts for intrusion detection integration​
6.​ General Requirements
●​ Contractor shall field-verify all dimensions before fabrication and installation.
●​ All removed materials shall be properly disposed of off-site in accordance with local regulations.
●​ Contractor is responsible for maintaining weather-tight conditions throughout construction.
●​ Jobsite must be cleaned up and materials disposed of on a daily basis.
●​ All fasteners, anchors, and sealants shall be provided and installed as part of the work.
●​ Work shall be performed in a clean, safe, and coordinated manner with minimal disruption to the
educational environment.
●​ Contractor shall provide warranty information for doors, frames, and hardware at project closeout.
●​ The Contractor shall not begin work until they are fully prepared to complete all work
continuously from start to finish. Once started, the project must proceed without delay until
completion to avoid disruption to District operations.
Page 4
Section 6.0 – Timeline for Process
The timeline listed below is the District’s estimation of time required to complete the process. All efforts
shall be made to abide by this schedule; however, changes may occur if necessary.
Request for Proposals issued​ ​
November 12, 2025
Pre-Bid Meeting​ ​
December 2, 10:00 a.m. CST
Bidder Questions due to District​ ​
December 3, 2025
Response to Questions​
December 4, 2025
Proposals Due​​
December 12, 11:00 a.m. CST
Recommendation to Board​ ​
January 15, 2025
Notice to Proceed​ ​
January 16, 2025
Section 7.0 – Proposal Evaluation Criteria
Proposals will be evaluated by the District and designated staff. The following will serve as the basic
criteria for the selection.
1.​ Offeror's demonstration of a complete understanding of the District’s requirements and needs.
2.​ The qualifications and experience of the Company
3.​ The Proposed timeline for project completion.
4.​ Evaluation of past performance, references, interviews, presentations, etc.
5.​ The total cost of the services offered to the District
Section 8.0 – Proposal Requirements
1.​ The Certification Form must be completed and included.
2.​ Proposed timeline for project completion.
3.​ Cost breakdown by center and total project bid amount.
4.​ The Company shall complete Attachment 1, Company Identification Form.
5.​ The Company shall complete Attachment 2A and 2B, providing the District a listing of all similar
projects completed within the last five years. The Company shall additionally provide the District a
listing of all public school clients that have discontinued service from the Company in the past five
years due to poor performance or non-performance.
6.​ The Company shall complete Attachment 3, Federal Work Authorization Program Addendum.
7.​ The Company shall complete Attachment 4, Federal Work Authorization Program Affidavit.
Page 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Crane Lake Dam Rehabilitation Active Contract Opportunity Notice ID 12445526Q0047 Related Notice

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/11/2026

Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City

Missouri Department of Transportation(MDOT)

Bid Due: 6/10/2026

Bid Number: 053-2026IFB Bid Title: 2023PW0028 - PICKWICK & CATALPA STORMWATER IMPROVEMENTS Category:

City of Springfield

Bid Due: 6/25/2026

New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email

Missouri Department of Transportation(MDOT)

Bid Due: 6/17/2026