Infrastructure Improvements Electrical Phase IV

Agency: Ohio Facility Construction Commission
State: Ohio
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Posted Date: Jun 11, 2026
Due Date: Jun 18, 2026
Solicitation No: 260007
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/06/02 6/18/2026 260007 University of Akron Local Higher Education Infrastructure Improvements Electrical
Phase IV
A/E $3,400,000 N/A TBD

Attachment Preview

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Infrastructure Improvements Electrical
Project Name Phase IV
Project Location The University of Akron - Main Campus
City / County Akron / Summit
Owner
The University of akron
Delivery Method General Contracting
Publish Date 6/2/2026
Response Deadline June 18, 2026 8:30 AM local time
Project Number
260007
Project Manager
Jim Haskell
Contracting Authority Local Higher Education
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
4
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) to the attention of Shelly Keller at The
University of Akron, 250 South Forge st, Suite 102, Akron, Ohio 44325-9001 A drop-off box is provided in the lobby of the
Purchasing Department. See Section J of this RFQ for additional submittal instructions
All questions are to be submitted through Workday Strategic Sourcing (WSS), which will allow everyone to see submitted
questions and the answers. Questions will be answered and posted to the WSS website on a regular basis until one week
before the time of RFQ submittal. This tool is located at: Vendor Registration- https://the-university-of-akron.public-
portal.us.workdayspend.com/ .Vendors can view the project details related documents without registering. Workday Strategic
Sourcing offers customer support that may be reached scoutsupport@workday.com.
Project Overview
A. Project Description
The University of Akron’s Office of Capital Planning completed a comprehensive survey of the campus electrical
infrastructure in 2017 and is in the fourth phase of an ongoing project to replace deteriorating medium voltage cabling and
associated equipment. The current phase continues the 23KV loop to ensure a stable and dependable electrical network
for campus (see attached Proposed 23KV Loops, Campus Overall Site Plan). Construction may take place over two
summers. Power must be maintained to the campus High Temperature Hot Water (HTHW) circulation system during the
winter months.
The University of Akron has developed the following Program of Requirements (POR).
Task 1: SS to Mary Gladwin (MG)
(RED ON SITE PLAN)
Connect from existing sectionalizer at SS-MG, then new duct bank to Mary Gladwin. New 23K:480V transformer to Mary
Gladwin, connection to existing switchboard located. New Dry 480V:208V transformer. New 23K Wire full length, Feed
wire to switchboard.
Task 2: Goodyear (GDYR) Sectionalizer to Auburn Science & Engineering Center (ASEC) Sectionalizer
(CYAN ON SITE PLAN)
Connect from existing sectionalizer at Goodyear via new / existing duct bank to new sectionalizer at ASEC. New
23K:4160VAC connecting to existing switchboard West Tower. New Dry 480V:208V transformer. New 23K:480VAC
connecting to existing switchboard in ASEC North Tower. New Dry 480V:208V transformer. New 23K Wire full length,
Feed wire to switchboard.
Task 3: Whitby Hall (WH) addition
Connect from new ASEC Sectionalizer to new 23K:480V transformer located in the Whitby/Auburn Science yard,
connecting to existing switchboard.
Task 4: ASEC Sectionalizer to Computer Center (COMP) Sectionalizer
(BLUE ON SITE PLAN)
Connect from new ASEC Sectionalizer through new duct bank to MH-2, continuing in existing duct bank to MH-1A, then
new duct bank to new COMP Sectionalizer. New 23K Wire full length, Feed wire to switchboard.
F110-02-2026-JAN
Publish Date: 6/2/2026
Page 1 of 5
Request for Qualifications (Registered Design Professional) continued
Task 5: COMP transformer replacement
New 23K:4160V transformer, connecting to existing switchboard.
Task 6: COMP Sectionalizer to Carroll Street Substation (ESUB)
(PURPLE ON SITE PLAN)
Connect from new COMP Sectionalizer in new duct bank to MH-1A, then existing duct bank to ESUB in new duct bank.
New 23K Wire full length.
Task 7: ESUB 23K Lineup
New Medium Voltage (MV) Switchgear with four (4) sections. Connections to existing MV Switchgear and MV feed from
Ohio Edison. Remove existing MV overhead.
Task 8: SS-MG to McDowell Law Center (LAW)
(YELLOW ON SITE PLAN)
Connect from existing sectionalizer at SS-MG, via existing duct bank to LAW sectionalizer. New 23K:480V transformer,
connection to existing switchboard. New Dry 480V:208V transformer. Reuse Existing 23K Wire full length, New feed
wire to switchboard.
B. Scope of Services
For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the
Agreement, commence with Design.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost
components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 6 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Experience with medium voltage distribution systems
2. Experience with medium voltage underground electrical duct banks, manholes, and associated civil work
3. Experience in owner occupied buildings
4. Experience in scheduling utility interruptions
5. Civil and Site Restoration
6. Experience in the State of Ohio Higher Education Design and Construction
7. Experience in the State of Ohio General Contracting delivery method of construction
C. Estimated Budget / Funding
State Funding:
$0.00
Other Funding:
$3,400,000
Construction Cost: $2,735,318
Total Project Cost: $3,400,000
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
07 / 26
05 / 27
08 / 28
09 / 28
F110-02-2026-JAN
Publish Date: 6/2/2026
Page 2 of 5
Request for Qualifications (Registered Design Professional) continued
E. Estimated Basic Fee Range (see note below)
8.5% to 9.0%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Engineering
Secondary
Architecture
Disciplines:
Civil Engineering
Surveying
H. Additional Service Providers Required
Survey
Underground sounding
Additional Service Discipline
Additional Service Discipline
Select Secondary Discipline
Additional Service Discipline
Select Secondary Discipline
Additional Service Discipline
Select Secondary Discipline
Additional Service Discipline
Select Secondary Discipline
Additional Service Discipline
Select Secondary Discipline
Additional Service Discipline
Scheduling
Additional Service Discipline
Estimating
Additional Service Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
F110-02-2026-JAN
Publish Date: 6/2/2026
Page 3 of 5
Request for Qualifications (Registered Design Professional) continued
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN
Publish Date: 6/2/2026
Page 4 of 5
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name Infrastructure Improvements Electrical Phase IV
Project Number 260007
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 25 miles
25 miles to 50 miles
More than 50 miles
Less than $100,000
$100,000 to $200,000
More than $200,000
Less than 5 professionals
5 to 20 professionals
More than 20 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 3 sample projects
3 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 8 projects
More than 8 projects
Performance in completing projects within
original construction budget and schedule
Less than 6 projects
6 to 9 projects
More than 9 projects
Value
Score
5
2
0
2
1
0
1
2
3
Max
=3
0 - 10
0 - 10
0 - 10
0 - 10
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2026-JAN
Publish Date: 6/2/2026
Page 5 of 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Title: Barlow Community Center Pedestrian Bridge Replacement and Rehabilitation Project Category: Construction

City of Hudson

Bid Due: 6/25/2026

Bid Title: Public Works Interior Sanitary Sewer Replacement Project Category: Invitations to Bid

City of Shaker Heights

Bid Due: 6/26/2026

Sandusky River Wall SREB-5 Rehabilitation Design, June 30, 2026 LEGAL NOTICE The City

Tiffin city

Bid Due: 6/30/2026

AML Reclamation Construction Engineering and Inspection Services (FY 2027) June 15, 2026 |

State of Ohio - Department of Natural Resources

Bid Due: 7/02/2026