Industry Day Event TOG Temporary Stables JBMHH
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | 8(a) Sole Source (FAR 19.8) |
| Posted Date: | Jan 17, 2025 |
| Due Date: | Jan 22, 2025 |
| Solicitation No: | W912DR25RTD01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Jan 16, 2025 09:54 pm EST
- Original Response Date: Jan 22, 2025 05:00 pm EST
- Inactive Policy: Manual
- Original Inactive Date: Dec 31, 2025
-
Initiative:
- None
- Original Set Aside: 8(a) Sole Source (FAR 19.8)
- Product Service Code: Y1FB - CONSTRUCTION OF RECREATIONAL BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Fort Myer , VA 22211USA
USACE Baltimore District Industry Day Event
This special notice is an announcement to advise of an upcoming Industry Day Event. On Thursday, January 23, 2025 at 0900 AM EDT local Baltimore time a virtual Industry Day will take place via Microsoft Teams. Link to Teams event contained in the attached Invite contained herein. This event is to provide information regarding the TOG Temporary Stables project and the challenges it faces. There will be a presentation by TOG and USACE followed by a Question and Answer session. A link is provided in this announcement for contractors to provide information regarding their capabilities as well as an opportunity to submit questions in advance of the Industry Day event as an effort to provide the USACE Team advance ability to give immediate and accurate responses at the event. There will also be an opportunity for follow up questions to the advanced questions provided.
The survey is a detrimental tool that will be utilized by the project delivery team for rapid ability to put this action on contract. The survey is not required by highly encouraged. Information from the survey will be utilized in scheduling in person capability briefs/solution discussions with the USACE team on Friday, 24 January 2025.
***************************************************************************************************************************
This requirement is being explored as an 8(a) ANC/HNO/Tribal sole source requirement.
This Industry Day is not a Request for Proposal, Request for Quote, or Invitation for Bid. Tehre is no commitment by the Government to issue a solicitation, make award(s), or pay for respondent's expenditures made in response to this notice. The purpose of this even is to survey capabilities, questions, and interest from industry for this requirement.
All information shared in teh course of this Industry Day shall be considered preliminary and tentative.
***************************************************************************************************************************
Scope:
The U.S. Army Corps of Engineers, Baltimore District is seeking qualified contractors to construct a temporary stables facility at Joint Base Myer – Henderson Hall, in Arlington, VA. The facility will support the Old Guard Caisson Detachment, a unit of the U.S. Army’s 3rd Infantry Regiment that provides funeral and ceremonial duties at Arlington National Cemetery. The scope includes a 10,000 square foot temporary stables building with 26 horse stalls, a 500 square foot storage structure, and a 4,200 square foot temporary office space for 20 personnel, with all supporting utilities. The temporary facility will be in operation for approximately 3 years.
Site Location on JBM-HH: See attachment
(Perceived) Challenges:
- utilization of current permitting. No new permits. no modification to current water management.
- runoff from parking lot from/near stable will require flooring be raised
- shortened timeframe to complete project
- 3 facilities on the site
- potentitial historical-like facade matching
- rapid mobilization
- Structure surface or foundation must be graded or relieved in a manner that facilitates successful run-off of contaminated fluids into the black water drainage system. Sewer tie-in shall be identified at the site in conjunction with the JBM-HH DPW, and the structure must be connected to the proper lines—one each for stormwater water and sewer water.
- ADA compliance for all facilities
- RESOURCE MANAGEMENT OFFICE 2 HOPKINS PLAZA
- BALTIMORE , MD 21201-2526
- USA
- Tonja Dreke
- tonja.j.dreke@usace.army.mil
- Jan 16, 2025 09:54 pm ESTSpecial Notice (Original)
Related Document
| Jan 22, 2025 | [Special Notice (Updated)] Industry Day Event TOG Temporary Stables JBMHH |
| Jan 23, 2025 | [Special Notice (Updated)] Industry Day Event TOG Temporary Stables JBMHH info alert Note: There have been new actions to this contract opportunity. To view the most recent action, please click here . |
| Jan 24, 2025 | [Special Notice (Updated)] Industry Day Event TOG Temporary Stables JBMHH |
| Jan 30, 2025 | [Special Notice (Updated)] Industry Day Event TOG Temporary Stables JBMHH |
See Also
B02_2026 SCENIC TRAIL CONSTRUCTION Status: Open IFB 126163-1 Virginia Department of Transportation -District:
State Government of Virginia
Due by 9/23/2026
Number 26-2965-5EAR Title Williamsburg Road and Chapman Lane Water Line Extensions Available Date
Henrico County
Due by 10/07/2026
Four Mile Fenster Bond Forfeiture Status: Open IFB 127162 Virginia Department of Energy
State Government of Virginia
Due by 9/28/2026
Follow Development of Additional Payload Processing Capability on North Wallops Island at Wallops
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Due by 10/30/2026