Indian Health Services (IHS) Makah Sewer Outfall, Neah Bay, WA
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jan 21, 2025 |
| Due Date: | Feb 21, 2025 |
| Solicitation No: | W912DW-25-R-0ZPQ_SS |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jan 21, 2025 02:16 pm PST
- Original Response Date: Feb 21, 2025 01:00 pm PST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Mar 08, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2PZ - REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Neah Bay , WA 98357USA
The existing Sewer Outfall pipe (the portion of the pipe in the sea) was constructed in 1995. The 14’’ diameter high density polyethylene pipe (HDPE) extends about 3,500 ft from the shore into the Strait of Juan de Fuca, along the bottom of the bay, and ends at a depth of about 45 ft of water. Previous pipe anchor repairs were performed on the outfall pipe in 2016 where they repaired the anchors using revetment blankets to keep the pipe secured to the sea floor.
On 21 May 2021, an inspection of the sewer outfall identified that a short section (estimated to be 260 ft) of the foreshore sewer outfall had broken free from the anchorage and was floating. A subsequent site inspection performed by IHS on 22 July 2024 determined that the floating pipeline was no longer present and had completely broken free. USACE performed a survey to collect bathymetry data on 19 September 2024 to identify gaps in the pipe. It has been determined that the pipeline will be replaced. Period of Performance (POP) is expected to be 120 days.
The project will replace 2,800 LF of HDPE, from flange stationed at 8+60 to diffuser stationed at 35+80, with an anchor structure designed to withstand the tidal forces of the area.
- KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
- SEATTLE , WA 98134-2329
- USA
- Javon Miller
- javon.m.miller@usace.army.mil
- Phone Number 2065727102
- Alysha MacDonald
- alysha.a.macdonald2@usace.army.mil
- Phone Number 2067643500
- Jan 21, 2025 02:16 pm PSTSources Sought (Original)
See Also
Bid Number: PSA-2026-26 Bid Title: RFQ Water & Wastewater SCADA System Upgrade Category:
City of Port Angeles
Due by 10/21/2026
Project: Sanitary Sewer Manhole 2831 Replacement Project Ref. #: 20260817 Department: Lake Stevens
Sammamish Plateau Water
Due by 9/29/2026
Project: BID - LWIT - Exterior Building Painting & Signs - Lake WA
State Government of Washington
Due by 9/17/2026
Follow Bldg. 1051 Replace Main Dry Valves Active Contract Opportunity Notice ID N0025326Q0013
DEPT OF DEFENSE
Due by 9/21/2026