SECTION 00 11 13
ADVERTISEMENT FOR BIDS
LEGAL NOTICE
TOWN OF WAREHAM
SIDEWALK IMPROVEMENTS AT ONSET PIER WEST BOULEVARD SIDEWALK
IMPROVEMENTS, AND IMPROVEMENTS TO THE LILLIAN GREGERMAN
BANDSHELL
The Town of Wareham, the Awarding Authority as represented by the Wareham Town
Administrators Office, invites sealed bids for Sidewalk Improvements at Onset Pier, West
Boulevard Sidewalk Improvements, and Improvements to the Lillian Gregerman Bandshell in
Onset, MA.
1. Sidewalk Improvements at Onset Pier
The scope of improvements for Sidewalk Improvements at Onset Pier includes, but is not limited
to, the following:
▪ New cast-in-place concrete sidewalks.
▪ New crosswalk markings.
▪ Removal of existing asphalt and pavers.
▪ Salvaged bench seating on a new concrete pad.
▪ New drainage infrastructure.
▪ Protection of existing trees to remain.
▪ Landscape restoration, including new plantings as required by the contract drawings.
2. West Boulevard Sidewalk Improvements:
The scope of improvements for West Boulevard Sidewalk Improvements includes, but is not
limited to, the following:
▪ New cast-in-place concrete sidewalks.
▪ New pavement markings.
▪ Removal and reinstallation of pavers.
▪ Granite and concrete curbing.
▪ Protection of existing trees to remain.
▪ Tree removal.
▪ Landscape restoration and other elements and work as required by the contract drawings.
MassDOT prequalification of contractors with the class of work as, Highway – Sidewalk
and Curbing, for the West Boulevard Sidewalk Improvements project with an estimated
value of $1,716,030 will be required.
00 11 13-1
ADVERTISEMENT FOR BIDS
3. Improvements to the Lillian Gregerman Bandshell
The scope of improvements for the Lillian Gregerman Bandshell includes, but is not limited to,
the following:
▪ New cast-in-place concrete walkways.
▪ Removal and replacement of bench seating, including accessible seating locations.
▪ New ramp and handrail.
▪ Removal, regrading and reinstallation of unit paver plaza.
▪ New lighting bollards.
▪ Protection of existing trees to remain.
▪ Landscape restoration and other elements and work as required by the contract drawings.
Bid Alternate #1 for Improvements to the Lillian Gregerman Bandshell
The scope of improvements for the Lillian Gregerman Bandshell includes, but is not limited to,
the following:
▪ New cast-in-place concrete walkways.
The Lillian Gregerman Bandshell scope of work must be completed by June 30, 2026.
Bidding procedures shall be in accordance with Massachusetts General Law, Chapter 30, Section
39M (MGL C.30, S.39M) as amended.
Beginning February 24, 2026 at 2:00 PM, complete sets of bidding documents, including bid
forms, may be obtained Town of Wareham’s bid opportunities website at
https://www.wareham.gov/bids.aspx
A non-mandatory pre-bid conference will be held. The conference will be held at 186 Onset
Avenue in Onset on March 3, 2026 at 10:00AM. Contractors are invited to meet the Owner’s
Representative at this conference.
Sealed bids for the contract will be received in the Town Administrators Office, located at 54
Marion Road, Third floor, Memorial Town Hall in Wareham, MA 02571 until March 18, 2026
at 4:00 PM. Proposals must be sealed and clearly marked “Onset Pier and West Blvd Sidewalk
Improvements & Lillian Gregerman Bandshell Improvements” with the proposer’s name. All
bids will be publicly opened and read aloud immediately thereafter at the location set forth in the
previous sentence.
The Awarding Authority reserves the right to reject any and all bids, in whole or in part, as
determined to be in the best interest of the Town and to waive minor informalities. The Town
Administrator is the Awarding Authority.
No less than the minimum salaries and wages as established by the Massachusetts Department
of Labor and Industries shall be paid to employees on this project, as set forth in the bidding
documents.
00 11 13-2
ADVERTISEMENT FOR BIDS
The estimated costs for each project are as follows: $217,550 for Sidewalk Improvements at
Onset Pier, $590,000 for Lillian Gregerman Bandshell, and $1,716,030 for West Boulevard
Sidewalk Improvements for a total of $2,523,580.
Any questions regarding the project may be directed to the Town’s Representative via email to
be received no later than March 11, 2026 at 4:00 PM:
Lauren Schunk, RLA, Project Landscape Architect – Schunk.lauren@wseinc.com
Weston & Sampson Engineers, Inc.
00 11 13-3
ADVERTISEMENT FOR BIDS
This page summarizes the opportunity, including an overview and a preview of the attached documents.