Improvements at Pederson and Willow Lane Pump Stations
| Agency: | City of Thousand Oaks |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 18, 2024 |
| Due Date: | Nov 20, 2024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Improvements at Pederson and Willow Lane Pump Stations
Addenda: 0
Release Date: 10/18/2024
Due Date: 11/20/2024
The proposed improvements at the pump stations will address the following scope of work:
-
Pederson Pump Station (CI 5534)
- Fire hardening at this site will include rebuilding the existing roofing structures to enhance protection against wildfires.
- Installation of a permanent chemical boosting system.
- Installation of chemical storage and canopy.
- Site security enhancements by replacing the existing access gates and fencing.
- Driveway widening improvements.
-
Willow Lane Pump Station (CI 5757)
- Fire hardening at this site will include rebuilding the existing roofing structures to enhance protection against wildfires.
- Installation of a permanent chemical boosting system.
- Installation of chemical storage and canopy.
The City’s Public Works Department manages the City’s water storage and distribution facilities consisting of 11 Calleguas turnouts (connections to the Calleguas Municipal Water District Supply), four hydropneumatic pump stations, 16 pump stations, 16 reservoirs, and two booster stations. Many of these sites need certain improvements to address enhanced wildfire resiliency, site drainage, accidental tank overflow containment, pump, and electrical equipment enclosures, fencing, and the addition of emergency generators and disinfection boosting stations.
A comprehensive citywide Water Storage Optimization Study, addressing water quality improvements within the City's water distribution network as a result of reduced demand and longer water age in the reservoirs after the 2022 drought. The study identified Pederson and Willow Lane Reservoirs as high-priority sites for the installation of a permanent disinfection boosting system to assist with water quality.
Topic: Improvements at Pederson (CI 5534) and Willow Lane (CI 5757) Pump Stations
Time: Nov 20, 2024 03:30 PM Pacific Time (US and Canada)
Join Zoom Meeting
https://us02web.zoom.us/j/88298585115?pwd=reJlYm6bBiwo9w0j12Dm2Jn1xyanka.1
Meeting ID: 882 9858 5115
Passcode: 859071
---
One tap mobile
+12133388477,,88298585115#,,,,*859071# US (Los Angeles)
+16692192599,,88298585115#,,,,*859071# US (San Jose)
---
Dial by your location
• +1 213 338 8477 US (Los Angeles)
• +1 669 219 2599 US (San Jose)
• +1 669 900 6833 US (San Jose)
• +1 253 215 8782 US (Tacoma)
• +1 346 248 7799 US (Houston)
• +1 602 753 0140 US (Phoenix)
• +1 720 928 9299 US (Denver)
• +1 971 247 1195 US (Portland)
• +1 470 250 9358 US (Atlanta)
• +1 470 381 2552 US (Atlanta)
• +1 646 518 9805 US (New York)
• +1 651 372 8299 US (Minnesota)
• +1 786 635 1003 US (Miami)
• +1 929 205 6099 US (New York)
• +1 267 831 0333 US (Philadelphia)
• +1 301 715 8592 US (Washington DC)
• +1 312 626 6799 US (Chicago)
Meeting ID: 882 9858 5115
Passcode: 859071
Find your local number: https://us02web.zoom.us/u/kq2uCPlMD
See Also
General Information Due Date: December 3, 2026 Opening Time: 2:00 PM Published Date:
City of Stockton
Due by 12/03/2026
Flow Equalization Basin Pumps Replacement Project, CP70100001 Number: Specification No. SV 25-37 Start
City of Simi Valley
Due by 11/24/2026
Project ID: 27-013 Title: Skywest Pump Station AC Unit Replacement Addenda: 0 Release
City of Hayward
Due by 11/24/2026
Flow Equalization Basin Pumps Replacement Project, CP70100001 Number: Specification No. SV 25-37 Start
City of Simi Valley
Due by 11/24/2026