IFB24-02 Water Production Facilities Electric & Mechanical Upgrades Pr

Agency: Los Alamos County
State: New Mexico
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 541330 - Engineering Services
Posted Date: Dec 5, 2023
Due Date: Jan 4, 2024
Solicitation No: IFB24-02
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
IFB24-02 Water Production Facilities Electric & Mechanical Upgrades Pr

Closing date January 04, 2024, 02:00 PM

  • Reference number IFB24-02
  • Status Open
  • Summary The summary of work for this IFB is located in the solicitation documents.

Only one of the following submission methods is required:

Sealed Bids in one (1) clearly labeled unbound original and two (2) bound paper copies (if submitting in paper form), subject to the conditions set forth in the Instructions to Bidders and in the other Solicitation Documents, will be received at the Office of the Los Alamos County Purchasing Officer, 101 Camino Entrada, Bldg. 3, Los Alamos, NM 87544 until 2:00 p.m. MT, Thursday, January 4, 2024 for this solicitation.

Bids may also be submitted electronically by email in pdf format. All other requirements stated in the Solicitation Document remain in effect. Emails should be addressed to: lacbid@lacnm.us . Subject line of the email must contain the following information: RESPONSE – IFB24-02 Water Production Facilities Electric and Mechanical Upgrades Project.

A Non-Mandatory Pre-Bid conference will be held on Tuesday, November 28, 2023 at 10:00 a.m. MT in Room 330 of the Los Alamos Municipal Building, 1000 Central Avenue, Los Alamos, NM 87544.

This project is wholly or partially funded with United States Environmental Protection Agency funds, and therefore must comply with all federal requirements contained in the Supplemental Conditions. Neither the United States nor its department’s agencies or employees is or will be party to this invitation for bids or any resulting contract.

Documents may be obtained from Carmela Salazar at the Office of the Purchasing Officer at:

Los Alamos County

Procurement Division

101 Camino Entrada, Bldg. 3

Los Alamos, NM 87544

(505) 662-8056

carmela.salazar@lacnm.us

OR

Bid documents for this project can be downloaded from the following website:

https://losalamosnm.egnyte.com/fl/UIvs5uBrpv

Office Hours are 8:00 a.m. – 4:30 p.m., Monday – Friday.

No Bid may be withdrawn after the scheduled closing time for receipt of proposals.

All forms of bribes, gratuities, and kickbacks are prohibited by state law.

Contact details
Carmela Salazar
505.662.8056
Related Information

Attachment Preview

DocuSign Envelope ID: F58F9EDF-72AD-40AA-9E21-F93C3FDBCEEF
INCORPORATED COUNTY OF LOS ALAMOS
BID AND SPECIFICATIONS
Water Production Facilities Electric and Mechanical Upgrades Project
INVITATION FOR BIDS NO. IFB24-02
Advertised on November 14, 2023
Albuquerque Journal, LA Daily Post and Santa Fe New Mexican
Prepared by:
______________________________________
Ernesto Gallegos, Project Manager
Reviewed by:
______________________________________
James Alarid, Deputy Utilities Manager
Authorized for release by:
________________________________
Philo S. Shelton, III P.E., Utilities Manager
THE COUNTY OF LOS ALAMOS IS AN EQUAL OPPORTUNITY EMPLOYER
IFB24-02 Inc. County of Los Alamos Water Production Facilities Electric and Mechanical Upgrades Project
This page intentionally left blank.
2
IFB24-02 Inc. County of Los Alamos Water Production Facilities Electric and Mechanical Upgrades Project
1.0 BIDDING PHASE ......................................................................................................................... 8
1.1 Invitation for Bids...................................................................................................................................... 8
1.2 Summary of Work ................................................................................................................................... 11
1.3 Requirements for Bidders ....................................................................................................................... 12
1.3.1 Bid Evaluation Criteria................................................................................................................................12
1.3.2 Required Bid Response Documents ...........................................................................................................12
1.3.3 The Bidder’s Bid Response Documents......................................................................................................12
1.3.4 Liquidated Damages for Failure to Enter into Contract .............................................................................13
1.3.5 Conditions of Work ....................................................................................................................................13
1.3.6 Addenda and Requests for Interpretation .................................................................................................13
1.3.7 Power of Attorney......................................................................................................................................14
1.3.8 Obligation of Bidder ...................................................................................................................................14
1.3.9 Safety Standards and Accident Prevention ................................................................................................14
1.3.10 Substitutes or Brand Name or Equal......................................................................................................15
1.3.11 Bids to Remain Subject to Acceptance ..................................................................................................15
1.3.12 Withdrawal of Bids ................................................................................................................................15
1.3.13 Acceptance or Rejection of Bids ............................................................................................................15
1.3.14 Award.....................................................................................................................................................15
1.3.15 Registration of Contractors and Subcontractors ...................................................................................16
1.3.16 Procurement Preferences - Preference does not apply to this solicitation...........................................16
1.4 Notices to Contractors............................................................................................................................. 17
1.41 Applicable Law ...........................................................................................................................................17
1.4.2 Gross Receipts Tax .....................................................................................................................................17
1.4.3 Minimum Wage Rates................................................................................................................................17
1.4.4 Work Conditions.........................................................................................................................................17
1.4.5 Public Information......................................................................................................................................17
1.5 Bid Forms ................................................................................................................................................ 19
1.5.1 Bid Form .....................................................................................................................................................20
1.5.2 Alternates...................................................................................................................................................24
1.5.3 List of Subcontractors ................................................................................................................................27
1.5.4 Bid Bond .....................................................................................................................................................28
1.5.5 Campaign Contribution Form.....................................................................................................................30
1.5.6 Certification - Debarment, Suspension, and other Responsibility Matters ...............................................32
1.5.7 Permanent Main Office Address of Company............................................................................................34
1.5.8 Authorization for Verification of Information ............................................................................................34
1.5.9 Certificate of Contractors Registration .....................................................................................................35
2.0 AWARD PHASE ......................................................................................................................... 36
2.1 Award Forms........................................................................................................................................... 36
2.1.1 Notice of Award .........................................................................................................................................36
3
IFB24-02 Inc. County of Los Alamos Water Production Facilities Electric and Mechanical Upgrades Project
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
Receipt of Notice of Award ........................................................................................................................38
Performance Bond .....................................................................................................................................39
Payment (Labor and Materials) Bond ........................................................................................................41
Insurance Requirement..............................................................................................................................43
Contract ...................................................................................................................................................... 45
3.0 CONSTRUCTION PHASE ......................................................................................................... 52
3.1 Construction Phase Related Forms .......................................................................................................... 52
3.1.1 Contractor Personnel Information .............................................................................................................52
3.1.2 Notice to Proceed ......................................................................................................................................53
3.1.3 Acceptance of Notice to Proceed...............................................................................................................54
3.1.4 Application and Certification for Payment Part 1 ......................................................................................55
3.1.5 Application and Certification for Payment Part 2 ......................................................................................56
3.1.6 Affidavit of Payment and Release of Liens.................................................................................................57
3.1.7 Field Order .................................................................................................................................................59
3.1.8 Change Order .............................................................................................................................................60
3.2 Conditions of the Contract - General Conditions ..................................................................................... 65
3.2.1 Definitions ..................................................................................................................................................65
3.2.2 Additional Instructions...............................................................................................................................68
3.2.3 Schedules, Reports and Records ................................................................................................................70
3.2.4 Shop Drawings and Submittals...................................................................................................................72
3.2.5 Start of Various Types of Work and Management Planning ......................................................................73
3.2.6 Materials, Services and Facilities ...............................................................................................................74
3.2.7 Substitutes or “Brand Name” or Equal.......................................................................................................75
3.2.8 Inspection and Testing ...............................................................................................................................77
3.2.9 Correction of Work.....................................................................................................................................78
3.2.10 Patents ...................................................................................................................................................79
3.2.11 Surveys, Permits, and Regulations.........................................................................................................79
3.2.12 Subsurface and Physical Conditions ......................................................................................................81
3.2.13 Protection of Work, Property and Persons............................................................................................83
3.2.14 Changes in the Work..............................................................................................................................84
3.2.15 Suspension, Delay or Termination of Work ...........................................................................................87
3.2.16 Subcontracting.......................................................................................................................................89
3.2.17 Duties of the Contractor ........................................................................................................................89
3.2.18 Job Site Administration..........................................................................................................................90
3.2.19 Engineer’s Authority ..............................................................................................................................94
3.2.20 Duties, Responsibilities and Limitations ................................................................................................95
3.2.21 Engineer’s Review of Work, Rejection of Work, Inspections, and Tests................................................95
3.2.22 Limitations of Authority.........................................................................................................................96
3.2.23 Land and Right-of-Way ..........................................................................................................................96
3.2.24 Warranty/Guaranty ...............................................................................................................................96
3.2.25 Miscellaneous ........................................................................................................................................97
3.2.26 Dispute Resolution, Applicable Law, and Venue ...................................................................................98
4
IFB24-02 Inc. County of Los Alamos Water Production Facilities Electric and Mechanical Upgrades Project
3.2.27
3.2.28
3.2.29
3.2.30
Examination of Records Provisions........................................................................................................98
American with Disabilities Act Compliance ...........................................................................................98
Bids and Proposals Are Public Records ................................................................................................99
Wage Rate Determination .....................................................................................................................99
3.3 ATTACHMENTS ..................................................................................................................... 100
3.3.1 License Agreement for Staging Area ........................................................................................................101
3.3.2 Wage Rate Information............................................................................................................................104
3.4 SUPPLEMENTAL CONDITIONS FOR DRINKING WATER STATE REVOLVING
FUND 119
3.5 TECHNICAL SPECIFICATIONS ............................................................................................... 120
DIVISION 01 – GENERAL REQUIREMENTS
01 00 01
Specification Format
01 14 03
Regulatory Requirements
01 21 00
Allowances
DIVISION 01 – GENERAL REQUIREMENTS (continued)
01 25 00
Substitution Procedures
01 29 00
Payment Procedures
01 31 19
Project Meetings
01 32 13
Construction Schedules
01 33 23
Shop Drawings, Product Data, and Samples
01 74 00
Cleaning and Waste Management
01 75 01
Field Service Representative
01 77 00
Contract Closeout
01 78 23
Operation and Maintenance Data
01 78 39
Project Record Documents
01 78 44
Spare Parts and Maintenance Materials
DIVISION 02 – EXISTING CONDITIONS
02 26 26
Lead Assessment
DIVISION 03 – 08 (NOT USED)
DIVISION 09 – FINISHES
09 97 01
Industrial Coatings
DIVISION 10 – 25 (NOT USED)
DIVISION 26 – ELECTRICAL
26 00 10
General Conditions for Electrical Systems
26 00 20
Codes, Permits, and Fines for Electrical Systems
5

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Chip and Crack Seal Treatment NFR 333 - Cibola NF Active Contract

AGRICULTURE, DEPARTMENT OF

Bid Due: 5/13/2024

ITB #2024-010B Upper Canyon Diversion April 3, 2024 Project Scope of Work: The

Village of Ruidoso

Bid Due: 4/30/2024

Status Ref# Project Close Date Days Left Action Open RFB-2024-542-PRK-BJ USS Albuquerque Memorial

City of Albuquerque

Bid Due: 5/31/2024

Follow Residential Windowpane Improvement Active Contract Opportunity Notice ID 19MX5324Q0020 Related Notice Department/Ind.

Federal Agency