IFB-25-26-043-Signal Improvement for Central Blvd and Broad St

Agency: City of Danville
State: Virginia
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Mar 9, 2026
Due Date: Mar 24, 2026
Solicitation No: 25-26-043
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: 25-26-043
Bid Title: IFB-25-26-043-Signal Improvement for Central Blvd and Broad St
Category: x Bid Results - Closed
Status: Open
Description:

Bid Tab- IFB-25-26-043 Signal Improvement Plan for Central Boulevard and Broad StreetÂ

Publication Date/Time:
3/9/2026 12:00 AM
Closing Date/Time:
3/24/2026 5:00 PM
Contact Person:
Carol Henley Purchasing Director
427 Patton Street
Danville, VA 24541
Phone : 434-799-6528 Option 4
Fax: 434-799-5102
E-Mail: purchasing@danvilleva.gov
Related Documents:

Attachment Preview

CURTIS CONTRACTING INC. DAVIS H. ELLIOTT
A B C D E F H H
LINE ITEM VDOT ITEM CODE VDOT SPECIFICATION REFERENCE ITEM DESCRIPTION SCHEDULED QUANTITY UNIT UNIT PRICE TOTAL PRICE (E x G) UNIT PRICE TOTAL PRICE (E x I)
01 513SD20-0001 513 MOBILIZATION 1 LS $106,000.00 $106,000.00 $108,734.84 $108,734.84
02 512SP20-0002 512, ATTD NS MAINTENANCE OF TRAFFIC 1 LS $204,283.02 $204,283.02 $55,771.77 $55,771.77
03 512SX20-0040 ATTD NS POLICE PATROL UNIFORM FLAGGER 16 HR $132.19 $2,115.04 $97.50 $1,560.00
04 517SD20-0001 517 CONSTRUCTION SURVEYING 1 LS $22,000.00 $22,000.00 $20,317.72 $20,317.72
05 301SD20-0002 301 CLEARING AND GRUBBING 0.04 AC $330,469.50 $13,218.78 $137,609.71 $5,504.39
06 303SD20-0001 303 REGULAR EXCAVATION 215 CY $137.71 $29,607.65 $194.51 $41,819.65
07 308SD20-0012 308 AGGREGATE BASE MATERIAL, TYPE 1 NO. 21A 200 TON $157.51 $31,502.00 $249.11 $49,822.00
08 502SD20-0011 502 STD CURB CG-2 430 LF $51.55 $22,166.50 $318.83 $137,096.90
09 504SD20-0002 504 CG-12 DETECTABLE WARNING SURFACE 10 SY $1,321.88 $13,218.80 $2,089.43 $20,894.30
10 508SD20-0003 508 DEMOLITION OF PAVEMENT RIGID 80 SY $324.44 $25,955.20 $303.71 $24,296.80
11 602SD20-0001 602 TOP SOIL CLASS A 2" 20 CY $796.78 $15,935.60 $693.23 $13,864.60
12 603SD20-0002 603 TEMPORARY SEED 5 LB $66.09 $330.45 $182.33 $911.65
13 603SD20-0003 603 REGULAR SEED 6 LB $66.09 $396.54 $191.43 $1,148.58
14 603SD20-0004 603 OVERSEED 6 LB $66.09 $396.54 $191.43 $1,148.58
15 303SD20-0020 303 EROSION CONTROL MULCH 50 CY $132.19 $6,609.50 $155.03 $7,751.50
16 303SD20-0031 303 INLET PROTECTION TYPE B 6 EA $376.81 $2,260.86 $771.71 $4,630.26
17 515SD20-0004 515 FLEX. PAVE. PLANING 750 SY $26.44 $19,830.00 $107.41 $80,557.50
18 315SD20-0101 315 ASPHALT CONCRETE BASE COURSE BM-25.0 80 TON $264.38 $21,150.40 $477.91 $38,232.80
19 510SX20-0002 510 REMOVE COMB. CURB AND GUTTER 405 LF $22.52 $9,120.60 $324.36 $131,365.80
20 315SD20-0008 315 ASPHALT CONCRETE TY. SM-12.5D or equivalent 130 TON $237.94 $30,932.20 $477.91 $62,128.30
21 315SD20-0005 315 ASPHALT CONCRETE TY . IM-19.0 40 TON $237.94 $9,517.60 $477.91 $19,116.40
22 412SD20-0044 412 SAW CUTTING 450 LF $13.22 $5,949.00 $328.26 $147,717.00
23 700SD20-0060 700 ELECTRICAL SERVICE SE-5 1 EA $13,132.63 $13,132.63 $7,680.88 $7,680.88
24 700SD20-0066 700 PEDESTRIAN POLE PF-2 3 EA $6,646.45 $19,939.35 $1,565.63 $4,696.89
25 700SD20-0068 700 CONCRETE FOUNDATION SIGNAL POLE PF-8 36 CY $3,350.00 $120,600.00 $2,135.66 $76,883.76
26 700SD20-0069 700 CONCRETE FOUNDATION PF-2 3 EA $2,476.82 $7,430.46 $1,256.83 $3,770.49
27 700SD20-0094 700 SIGNAL POLE MP-3, TYPE D 4 EA $22,074.10 $88,296.40 $19,346.03 $77,384.12
28 700SD20-0100 700 MAST ARM 49' 3 EA $22,137.55 $66,412.65 $10,337.07 $31,011.21
29 700SD20-0101 700 MAST ARM 60' 1 EA $25,856.87 $25,856.87 $14,470.24 $14,470.24
30 700SD20-0110 700 14/2 CONDUCTOR CABLE 350 LF $8.32 $2,912.00 $5.09 $1,781.50
31 700SD20-0112 700 14/4 CONDUCTOR CABLE 350 LF $8.32 $2,912.00 $5.02 $1,757.00
32 700SD20-0113 700 14/5 CONDUCTOR CABLE 1000 LF $11.08 $11,080.00 $5.30 $5,300.00
33 700SD20-0114 700 14/7 CONDUCTOR CABLE 730 LF $8.73 $6,372.90 $5.65 $4,124.50
34 703SD20-0053 703 UNINTERRUPTIBLE POWER SUPPLY TYPE 2 1 EA $7,210.75 $7,210.75 $3,355.63 $3,355.63
35 703SD20-0054 703 UNINTERRUPTIBLE POWER SUPPLY BATTERY PACK 1 EA $4,802.32 $4,802.32 $2,223.50 $2,223.50
36 703SD20-0056 703 UNINTERURUPT, POWER SUPPLY CABINET DET 1 EA $11,639.92 $11,639.92 $7,917.93 $7,917.93
37 703SD20-0003 703 LOCAL CONTROLLER TYPE A 1 EA $34,237.14 $34,237.14 $33,228.18 $33,228.18
38 504SD20-0003 504 HYDT. CEMENT CONC. SIDEWALK 4" 80 SY $226.47 $18,117.60 $674.06 $53,924.80
39 700SD20-0074 700 CONCRETE FOUNDATION CF-4 1 EA $25,039.55 $25,039.55 $2,093.89 $2,093.89
40 700SD20-0174 700 ELECTRICAL SERVICE WORK PAD 1 EA $1,982.82 $1,982.82 $976.50 $976.50
41 700SD20-0108 700 8/3 CONDUCTOR CABLE 40 LF $28.40 $1,136.00 $11.44 $457.60
42 700SD20-0124 700 TRAFFIC SIGNALIZATION CAT 5 DIRECT BURIAL CABLE 675 LF $16.42 $11,083.50 $4.81 $3,246.75
43 700SD20-0148 700 CONDUCTOR CABLE/ NO. 8 EGC 500 LF $11.08 $5,540.00 $4.21 $2,105.00
44 700SD20-0178 700 JUNCTION BOX JB-S2 4 EA $3,475.34 $13,901.36 $2,374.72 $9,498.88
45 700SD20-0179 700 JUNCTION BOX JB-S3 1 EA $4,293.53 $4,293.53 $2,654.06 $2,654.06
46 700SD20-0181 700 ELECTRICAL SERVICE GROUNDING ELECTRODE 10' 5 EA $258.82 $1,294.10 $187.08 $935.40
47 303SX20-0012 ATTD UTILITY TEST PIT UNPAVED 2 EA $660.94 $1,321.88 $383.80 $767.60
48 303SX20-0013 ATTD UTILITY TEST PIT ASPHALT CONCRETE 8 EA $1,321.88 $10,575.04 $732.62 $5,860.96
49 700SD20-0191 700 BORED CONDUIT 2" 420 LF $61.10 $25,662.00 $44.14 $18,538.80
50 700SD20-0192 700 BORED CONDUIT 3" 600 LF $74.31 $44,586.00 $52.14 $31,284.00
51 700SD20-0194 700 CONDUIT 2" SCHEDULE 80 220 LF $37.96 $8,351.20 $10.67 $2,347.40
52 700SD20-0195 700 CONDUIT 3" SCHEDULE 80 80 LF $42.17 $3,373.60 $13.89 $1,111.20
53 700SD20-0198 700 TRENCH EXCAVATION ECI-1 200 LF $45.48 $9,096.00 $8.58 $1,716.00
54 700SD20-0199 700, ATTD NS TRAFFIC SIGNAL FOUNDATION DESIGN (TEST BORE) 4 EA $5,287.51 $21,150.04 $6,547.15 $26,188.60
55 703SD20-0001 703 SIGNAL PANEL 85 SF $76.58 $6,509.30 $64.89 $5,515.65
56 703SD20-0007 703 TRAFFIC SIGNAL HEAD SECTION 12" HVS BACKPLATE 40 EA $246.16 $9,846.40 $455.40 $18,216.00
57 703SD20-0013 703 PEDESTRIAN ACTUATION PA-4 4 EA $3,961.38 $15,845.52 $6,844.31 $27,377.24
58 703SD20-0016 703 VIDEO DETECTION SYSTEM 1 EA $13,205.26 $13,205.26 $10,909.84 $10,909.84
59 703SD20-0014 703 VIDEO DETECTION CAMERA 4 EA $9,110.71 $36,442.84 $7,353.63 $29,414.52
60 703SD20-0023 703 EVP DETECTION SYSTEM 4 WAY 1 EA $13,055.52 $13,055.52 $9,957.89 $9,957.89
61 703SD20-0024 703 EVP CABLE 650 LF $6.30 $4,095.00 $5.03 $3,269.50

SIGNAL IMPROVEMENT PLAN FOR CENTRAL BOULEVARD (ROUTE 86) & BROAD STREET
IFB 25-26-043 BID TAB
CURTIS CONTRACTING INC. DAVIS H. ELLIOTT
A B C D E F H H
LINE VDOT VDOT ITEM DESCRIPTION SCHEDULED UNIT TOTAL UNIT TOTAL
UNIT
ITEM ITEM SPECIFICATION QUANTITY PRICE PRICE PRICE PRICE
CODE REFERENCE (E x G) (E x I)
01 513SD20-0001 513 MOBILIZATION 1 LS $106,000.00 $106,000.00 $108,734.84 $108,734.84
02 512SP20-0002 512, ATTD NS MAINTENANCE OF TRAFFIC 1 LS $204,283.02 $204,283.02 $55,771.77 $55,771.77
03 512SX20-0040 ATTD NS POLICE PATROL UNIFORM FLAGGER 16 HR $132.19 $2,115.04 $97.50 $1,560.00
04 517SD20-0001 517 CONSTRUCTION SURVEYING 1 LS $22,000.00 $22,000.00 $20,317.72 $20,317.72
05 301SD20-0002 301 CLEARING AND GRUBBING 0.04 AC $330,469.50 $13,218.78 $137,609.71 $5,504.39
06 303SD20-0001 303 REGULAR EXCAVATION 215 CY $137.71 $29,607.65 $194.51 $41,819.65
07 308SD20-0012 308 AGGREGATE BASE MATERIAL, TYPE 1 NO. 21A 200 TON $157.51 $31,502.00 $249.11 $49,822.00
08 502SD20-0011 502 STD CURB CG-2 430 LF $51.55 $22,166.50 $318.83 $137,096.90
09 504SD20-0002 504 CG-12 DETECTABLE WARNING SURFACE 10 SY $1,321.88 $13,218.80 $2,089.43 $20,894.30
10 508SD20-0003 508 DEMOLITION OF PAVEMENT RIGID 80 SY $324.44 $25,955.20 $303.71 $24,296.80
11 602SD20-0001 602 TOP SOIL CLASS A 2" 20 CY $796.78 $15,935.60 $693.23 $13,864.60
12 603SD20-0002 603 TEMPORARY SEED 5 LB $66.09 $330.45 $182.33 $911.65
13 603SD20-0003 603 REGULAR SEED 6 LB $66.09 $396.54 $191.43 $1,148.58
14 603SD20-0004 603 OVERSEED 6 LB $66.09 $396.54 $191.43 $1,148.58
15 303SD20-0020 303 EROSION CONTROL MULCH 50 CY $132.19 $6,609.50 $155.03 $7,751.50
16 303SD20-0031 303 INLET PROTECTION TYPE B 6 EA $376.81 $2,260.86 $771.71 $4,630.26
17 515SD20-0004 515 FLEX. PAVE. PLANING 750 SY $26.44 $19,830.00 $107.41 $80,557.50
18 315SD20-0101 315 ASPHALT CONCRETE BASE COURSE BM-25.0 80 TON $264.38 $21,150.40 $477.91 $38,232.80
19 510SX20-0002 510 REMOVE COMB. CURB AND GUTTER 405 LF $22.52 $9,120.60 $324.36 $131,365.80
20 315SD20-0008 315 ASPHALT CONCRETE TY. SM-12.5D or equivalent 130 TON $237.94 $30,932.20 $477.91 $62,128.30
21 315SD20-0005 315 ASPHALT CONCRETE TY . IM-19.0 40 TON $237.94 $9,517.60 $477.91 $19,116.40
22 412SD20-0044 412 SAW CUTTING 450 LF $13.22 $5,949.00 $328.26 $147,717.00
23 700SD20-0060 700 ELECTRICAL SERVICE SE-5 1 EA $13,132.63 $13,132.63 $7,680.88 $7,680.88
24 700SD20-0066 700 PEDESTRIAN POLE PF-2 3 EA $6,646.45 $19,939.35 $1,565.63 $4,696.89
25 700SD20-0068 700 CONCRETE FOUNDATION SIGNAL POLE PF-8 36 CY $3,350.00 $120,600.00 $2,135.66 $76,883.76
26 700SD20-0069 700 CONCRETE FOUNDATION PF-2 3 EA $2,476.82 $7,430.46 $1,256.83 $3,770.49
27 700SD20-0094 700 SIGNAL POLE MP-3, TYPE D 4 EA $22,074.10 $88,296.40 $19,346.03 $77,384.12
28 700SD20-0100 700 MAST ARM 49' 3 EA $22,137.55 $66,412.65 $10,337.07 $31,011.21
29 700SD20-0101 700 MAST ARM 60' 1 EA $25,856.87 $25,856.87 $14,470.24 $14,470.24
30 700SD20-0110 700 14/2 CONDUCTOR CABLE 350 LF $8.32 $2,912.00 $5.09 $1,781.50
31 700SD20-0112 700 14/4 CONDUCTOR CABLE 350 LF $8.32 $2,912.00 $5.02 $1,757.00
32 700SD20-0113 700 14/5 CONDUCTOR CABLE 1000 LF $11.08 $11,080.00 $5.30 $5,300.00
33 700SD20-0114 700 14/7 CONDUCTOR CABLE 730 LF $8.73 $6,372.90 $5.65 $4,124.50
34 703SD20-0053 703 UNINTERRUPTIBLE POWER SUPPLY TYPE 2 1 EA $7,210.75 $7,210.75 $3,355.63 $3,355.63
35 703SD20-0054 703 UNINTERRUPTIBLE POWER SUPPLY BATTERY PACK 1 EA $4,802.32 $4,802.32 $2,223.50 $2,223.50
36 703SD20-0056 703 UNINTERURUPT, POWER SUPPLY CABINET DET 1 EA $11,639.92 $11,639.92 $7,917.93 $7,917.93
37 703SD20-0003 703 LOCAL CONTROLLER TYPE A 1 EA $34,237.14 $34,237.14 $33,228.18 $33,228.18
38 504SD20-0003 504 HYDT. CEMENT CONC. SIDEWALK 4" 80 SY $226.47 $18,117.60 $674.06 $53,924.80
39 700SD20-0074 700 CONCRETE FOUNDATION CF-4 1 EA $25,039.55 $25,039.55 $2,093.89 $2,093.89
40 700SD20-0174 700 ELECTRICAL SERVICE WORK PAD 1 EA $1,982.82 $1,982.82 $976.50 $976.50
41 700SD20-0108 700 8/3 CONDUCTOR CABLE 40 LF $28.40 $1,136.00 $11.44 $457.60
42 700SD20-0124 700 TRAFFIC SIGNALIZATION CAT 5 DIRECT BURIAL CABLE 675 LF $16.42 $11,083.50 $4.81 $3,246.75
43 700SD20-0148 700 CONDUCTOR CABLE/ NO. 8 EGC 500 LF $11.08 $5,540.00 $4.21 $2,105.00
44 700SD20-0178 700 JUNCTION BOX JB-S2 4 EA $3,475.34 $13,901.36 $2,374.72 $9,498.88
45 700SD20-0179 700 JUNCTION BOX JB-S3 1 EA $4,293.53 $4,293.53 $2,654.06 $2,654.06
46 700SD20-0181 700 ELECTRICAL SERVICE GROUNDING ELECTRODE 10' 5 EA $258.82 $1,294.10 $187.08 $935.40
47 303SX20-0012 ATTD UTILITY TEST PIT UNPAVED 2 EA $660.94 $1,321.88 $383.80 $767.60
48 303SX20-0013 ATTD UTILITY TEST PIT ASPHALT CONCRETE 8 EA $1,321.88 $10,575.04 $732.62 $5,860.96
49 700SD20-0191 700 BORED CONDUIT 2" 420 LF $61.10 $25,662.00 $44.14 $18,538.80
50 700SD20-0192 700 BORED CONDUIT 3" 600 LF $74.31 $44,586.00 $52.14 $31,284.00
51 700SD20-0194 700 CONDUIT 2" SCHEDULE 80 220 LF $37.96 $8,351.20 $10.67 $2,347.40
52 700SD20-0195 700 CONDUIT 3" SCHEDULE 80 80 LF $42.17 $3,373.60 $13.89 $1,111.20
53 700SD20-0198 700 TRENCH EXCAVATION ECI-1 200 LF $45.48 $9,096.00 $8.58 $1,716.00
54 700SD20-0199 700, ATTD NS TRAFFIC SIGNAL FOUNDATION DESIGN (TEST BORE) 4 EA $5,287.51 $21,150.04 $6,547.15 $26,188.60
55 703SD20-0001 703 SIGNAL PANEL 85 SF $76.58 $6,509.30 $64.89 $5,515.65
56 703SD20-0007 703 TRAFFIC SIGNAL HEAD SECTION 12" HVS BACKPLATE 40 EA $246.16 $9,846.40 $455.40 $18,216.00
57 703SD20-0013 703 PEDESTRIAN ACTUATION PA-4 4 EA $3,961.38 $15,845.52 $6,844.31 $27,377.24
58 703SD20-0016 703 VIDEO DETECTION SYSTEM 1 EA $13,205.26 $13,205.26 $10,909.84 $10,909.84
59 703SD20-0014 703 VIDEO DETECTION CAMERA 4 EA $9,110.71 $36,442.84 $7,353.63 $29,414.52
60 703SD20-0023 703 EVP DETECTION SYSTEM 4 WAY 1 EA $13,055.52 $13,055.52 $9,957.89 $9,957.89
61 703SD20-0024 703 EVP CABLE 650 LF $6.30 $4,095.00 $5.03 $3,269.50

62 703SD20-0025 703 AUX. PREEMPTION OPTICAL DETECTOR 4 EA $3,501.74 $14,006.96 $1,492.87 $5,971.48
63 703SD20-0034 703 HANGER ASSEMBLY SM-3 ONE WAY 10 EA $416.15 $4,161.50 $693.02 $6,930.20
64 703SD20-0037 703 HANGER ASSEMBLY SMB-2 PEDESTRIAN, ONE WAY 2 EA $327.88 $655.76 $606.27 $1,212.54
65 703SD2-0038 703 HANGER ASSEMBLY SMB-2 PEDESTRIAN, TWO WAY 1 EA $448.94 $448.94 $728.00 $728.00
66 703SD20-0044 703 REMOVE EXISTING POLE 7 EA $7,500.00 $52,500.00 $2,230.87 $15,616.09
67 703SD20-0045 703 REMOVE EXISTING FOUNDATION 7 EA $7,500.00 $52,500.00 $1,814.05 $12,698.35
68 703SD20-0046 703 REMOVE EXISTING SIGNAL HEAD 11 EA $484.00 $5,324.00 $209.14 $2,300.54
69 703SD20-0060 703 PEDESTRIAN SIGNAL HEAD SP-8 4 EA $1,346.33 $5,385.32 $935.50 $3,742.00
70 510SX20-0040 510 REMOVE EXISTING VIDEO EQUIPMENT 1 EA $4,840.05 $4,840.05 $836.58 $836.58
71 703SD20-0047 703 REMOVE EXISTING CONTROLLER CABINET 1 EA $7,468.85 $7,468.85 $418.29 $418.29
72 510SD20-0057 510 RELOCATE EXISTING SIGNAL EQUIPMENT (FIBER) 1 EA $5,869.05 $5,869.05 $19,549.55 $19,549.55
73 512SD20-0042 512 ERADICATION OF PAVEMENT MARKING 648 LF $1.32 $855.36 $5.58 $3,615.84
74 704SD20-0001 704 TYPE B CLASS 1, PAVE, LINE MARKING 4" 2200 LF $6.61 $14,542.00 $10.37 $22,814.00
75 704SD20-0010 704 TYPE B CLASS 1, PAVE, LINE MARKING 24" 150 LF $26.44 $3,966.00 $28.48 $4,272.00
76 704SD20-0047 704 PVMT SYMB MRKG SGL TURN ARR.TY B, CL I 8 EA $396.56 $3,172.48 $349.06 $2,792.48
77 704SD20-0050 704 DBL TURN ARR. THRU/LT OR RT TY B, CL I 1 EA $660.94 $660.94 $272.26 $272.26
78 700SD20-0145 700 10CONDUCTOR CABLE 1450 LF $5.45 $7,902.50 $3.98 $5,771.00
79 705SD20-0011 705 LUMINAIRE250 WATT H.P.S POLE MOUNT 4 EA $1,401.19 $5,604.76 $978.46 $3,913.84
80 700SD20-0225 700 LUMINAIRE ARM 18' 4 EA $4,708.45 $18,833.80 $2,845.41 $11,381.64
$1,643,181.93

62 703SD20-0025 703 AUX. PREEMPTION OPTICAL DETECTOR 4 EA $3,501.74 $14,006.96 $1,492.87 $5,971.48
63 703SD20-0034 703 HANGER ASSEMBLY SM-3 ONE WAY 10 EA $416.15 $4,161.50 $693.02 $6,930.20
64 703SD20-0037 703 HANGER ASSEMBLY SMB-2 PEDESTRIAN, ONE WAY 2 EA $327.88 $655.76 $606.27 $1,212.54
65 703SD2-0038 703 HANGER ASSEMBLY SMB-2 PEDESTRIAN, TWO WAY 1 EA $448.94 $448.94 $728.00 $728.00
66 703SD20-0044 703 REMOVE EXISTING POLE 7 EA $7,500.00 $52,500.00 $2,230.87 $15,616.09
67 703SD20-0045 703 REMOVE EXISTING FOUNDATION 7 EA $7,500.00 $52,500.00 $1,814.05 $12,698.35
68 703SD20-0046 703 REMOVE EXISTING SIGNAL HEAD 11 EA $484.00 $5,324.00 $209.14 $2,300.54
69 703SD20-0060 703 PEDESTRIAN SIGNAL HEAD SP-8 4 EA $1,346.33 $5,385.32 $935.50 $3,742.00
70 510SX20-0040 510 REMOVE EXISTING VIDEO EQUIPMENT 1 EA $4,840.05 $4,840.05 $836.58 $836.58
71 703SD20-0047 703 REMOVE EXISTING CONTROLLER CABINET 1 EA $7,468.85 $7,468.85 $418.29 $418.29
72 510SD20-0057 510 RELOCATE EXISTING SIGNAL EQUIPMENT (FIBER) 1 EA $5,869.05 $5,869.05 $19,549.55 $19,549.55
73 512SD20-0042 512 ERADICATION OF PAVEMENT MARKING 648 LF $1.32 $855.36 $5.58 $3,615.84
74 704SD20-0001 704 TYPE B CLASS 1, PAVE, LINE MARKING 4" 2200 LF $6.61 $14,542.00 $10.37 $22,814.00
75 704SD20-0010 704 TYPE B CLASS 1, PAVE, LINE MARKING 24" 150 LF $26.44 $3,966.00 $28.48 $4,272.00
76 704SD20-0047 704 PVMT SYMB MRKG SGL TURN ARR.TY B, CL I 8 EA $396.56 $3,172.48 $349.06 $2,792.48
77 704SD20-0050 704 DBL TURN ARR. THRU/LT OR RT TY B, CL I 1 EA $660.94 $660.94 $272.26 $272.26
78 700SD20-0145 700 10CONDUCTOR CABLE 1450 LF $5.45 $7,902.50 $3.98 $5,771.00
79 705SD20-0011 705 LUMINAIRE250 WATT H.P.S POLE MOUNT 4 EA $1,401.19 $5,604.76 $978.46 $3,913.84
80 700SD20-0225 700 LUMINAIRE ARM 18' 4 EA $4,708.45 $18,833.80 $2,845.41 $11,381.64
TOTAL (BID ITEMS 1-80): $ $1,529,534.00 $1,643,181.93

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Aviation and Missile R&D BAA Active Contract Opportunity Notice ID W911W625R0006 Related

DEPT OF DEFENSE

Bid Due: 7/03/2029

Follow Commercial Solution Opportunity - Defense Commissary Agency (DeCA) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 12/31/2028

Follow DRAFT SOLICITATION Defense Energy Consortium (DECo) Consortium Management Organization (CMO) Active Contract

Federal Agency

Follow DRAFT SOLICITATION Defense Energy Consortium (DECo) Consortium Management Organization (CMO) Active Contract

Federal Agency