IFB 2024-083Rebid Waxhaw North Sanitary Sewer Replacement & Rehabilitation
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 9, 2025 |
| Due Date: | Oct 14, 2025 |
| Solicitation No: | 377-2024-083Rebid |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 377-2024-083Rebid |
| Project Title: | IFB 2024-083Rebid Waxhaw North Sanitary Sewer Replacement & Rehabilitation |
| Description: | The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits. |
| Opening Date: | 10/14/2025 2:00 PM |
| Posted Date: | 10/9/2025 |
| Status: | Open |
| Department: | COUNTY OF UNION |
|
Solicitation Number
*
377-2024-083Rebid
|
Department
COUNTY OF UNION
|
Status Reason
Open
|
|
|
Opening Date
2025-10-14T14:00:00.0000000
|
Posted Date
*
2025-10-09T13:39:23.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active
VETERANS AFFAIRS, DEPARTMENT OF
Due by 12/09/2026
Designer Solicitations - George Watts Hill Alumni Center Renovation and Addition By kiabell
University of North Carolina
Due by 11/19/2026
2nd STREET GARAGE ELEVATOR MODERNIZATION Reference number: ITB-S1-11026 Closing date: December 03, 2026,
City of Wilmington
Due by 12/03/2026
Project: Mint Museum Randolph Roof Repair Project - Phase II Ref. #: 269-2027-043
City of Charlotte
Due by 12/08/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.