IFB159482 Pipe Rehabilitation - Culpeper Dist.
| Agency: | State Government of Virginia |
|---|---|
| State: | Virginia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 29, 2025 |
| Due Date: | Feb 26, 2025 |
| Solicitation No: | IFB 86655 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Details
IFB-86655
-
IFB159482 Pipe Rehabilitation - Culpeper Dist.
- Status: Open
- Time Left:27 days
- Closing:2/26/25 9:00 AM
- Issued:1/29/25 3:47 PM
- Last Updated:
- Buyer:Rosalie Alther
-
Rosalie.Alther@vdot.virginia.gov - 540-829-7672
- Converted Solicitation Reference #:IFB-A501-0000159482-1
IFB-86655
-
IFB159482 Pipe Rehabilitation - Culpeper Dist.
- Status: Open
- Time Left:27 days
- Closing:2/26/25 9:00 AM
- Issued:1/29/25 3:47 PM
- Last Updated:
- Buyer:Rosalie Alther
-
Rosalie.Alther@vdot.virginia.gov - 540-829-7672
- Converted Solicitation Reference #:IFB-A501-0000159482-1
- Issued By:Virginia Department of Transportation
- Opportunity Type:Invitation for Bids (IFB)
- Category:Non-professional Services - Non-Technology
- Work Location:Culpeper VDOT District - Counties of Albemarle, Greene, Madison, Orange, Louisa, Fluvanna, Culpeper, Fauquier and Rappahannock.
- Website:
- Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
- Open Responses:See solicitation documents Public Opening information.
- Summary:On Call Pipe rehabilitation services on Interstate, Primary and Secondary roadway systems for the Culpeper District which includes Albemarle, Greene, Madison, Fluvanna, Louisa, Orange, Culpeper, Rappahannock and Fauquier Counties.
| Document | Size | Description | Posted On | Type |
| Culpeper District Allowable Work Hours.pdf | (223.72 KB) | Culpeper District Allowable Work Hours | 1/29/25 | RFx Document |
| IFB 159482 Attachments.pdf | (1.25 MB) | IFB 159482 Attachments | 1/29/25 | RFx Document |
| IFB 159482- PIPE REHAB .pdf | (545.74 KB) | IFB159482 Pipe Rehab - Culpeper District Specifications | 1/29/25 | RFx Document |
- l1_1. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 18" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 500.00000 linear foot
- Delivery Date:
- l1_2. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 24" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 500.00000 linear foot
- Delivery Date:
- l1_3. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 30" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 100.00000 linear foot
- Delivery Date:
- l1_4. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 36" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 400.00000 linear foot
- Delivery Date:
- l1_5. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 42" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 160.00000 linear foot
- Delivery Date:
- l1_6. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 48" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 80.00000 linear foot
- Delivery Date:
- l1_7. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 54" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 80.00000 linear foot
- Delivery Date:
- l1_8. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category A (CIPP) 60" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_9. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category B (Fold and Form) 18" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_10. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category B (Fold and Form) 24" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_11. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category B (Fold and Form) 30" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_12. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method B, Category B (Fold and Form) 36" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_13. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 18" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_14. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 24" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_15. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 30" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_16. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 36" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_17. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 42" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_18. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 48" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_19. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 54" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_20. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Pipe Lining Method C (Steel Liners) 60" Pipe Lining Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_21. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 18" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_22. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 24" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_23. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 30" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_24. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 36" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_25. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 42" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_26. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 48" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_27. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 54" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_28. MAINTENANCE AND REPAIR, PIPE CULVERT MAINTENANCE AND REPAIR, PIPE CULVERT Jack and Bore Method 60" Rehabilitation
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 60.00000 linear foot
- Delivery Date:
- l1_29. CONCRETE, READY MIX FLOWABLE FILL Flowable Fill per cubic yard
- NIGP Code: 75070 Ready-Mix Concrete (See 150-12 for Bagged Concrete)
- Quantity: 100.00000 cubic yard
- Delivery Date:
- l1_30. EXCAVATION, SPECIAL. CONSISTS OF THE REMOVAL OF PAVEMENT SUR EXCAVATION, SPECIAL. CONSISTS OF THE REMOVAL OF PAVEMENT SUR Excavation Paid by the hour
- NIGP Code: 91244 Excavation Services
- Quantity: 120.00000 Hour
- Delivery Date:
- l1_31. VIDEO SCANNING OF SEWERS, WATERWELLS, ETC. VIDEO SCANNING OF SEWERS, WATERWELLS, ETC. Video inspection of pipes and structures
- NIGP Code: 96292 Video Scanning of Sewers, Water Wells, etc.
- Quantity: 100.00000 Hour
- Delivery Date:
- l1_32. Water Pump 2" 2" Water / Trash Pump
- NIGP Code: 98157 Pumps and Pump Accessory Rental or Lease
- Quantity: 25.00000 Hour
- Delivery Date:
- l1_33. Water Pump 3" 3" Water / Trash Pump
- NIGP Code: 98157 Pumps and Pump Accessory Rental or Lease
- Quantity: 25.00000 Hour
- Delivery Date:
- l1_34. Water Pump 4" 4" Water / Trash Pump
- NIGP Code: 98157 Pumps and Pump Accessory Rental or Lease
- Quantity: 25.00000 Hour
- Delivery Date:
- l1_35. Water Pump 6 or greater 6" or greater Water / Trash Pump
- NIGP Code: 98157 Pumps and Pump Accessory Rental or Lease
- Quantity: 25.00000 Hour
- Delivery Date:
- l1_36. Vactor Truck Pipe flushing / cleaning Vac Truck Pipe Flushing / Cleaning w/operator
- NIGP Code: 91377 Maintenance and Repair, Pipe Culvert
- Quantity: 40.00000 Hour
- Delivery Date:
- l1_37. Traffic Control, Flaggers Certified Flagger meeting requirements of VAWAPM
- NIGP Code: 96884 Traffic Control Services (To Include Placement and Removal of Control Devices)
- Quantity: 100.00000 Hour
- Delivery Date:
- l1_38. Hired equipment, Arrow Board Arrow Board meeting certifications as stated in VAWAPM
- NIGP Code: 97524 Construction Equipment (Not Otherwise Classified) Rental or Lease
- Quantity: 100.00000 Hour
- Delivery Date:
- l1_39. TRUCKS, HIRED EQUIPMENT, PER VADOT SPECIFICATIONS TRUCK, WITH TRUCK MT ATTENUATOR, MIN. EMPTY WEIGHT 10,000 LB Truck Mounted Attenuator w/ Operator meeting requirements in VAWAPM
- NIGP Code: 97586 Truck and Van Rental or Lease (Incl. Fire and Garbage Trucks)
- Quantity: 500.00000 Hour
- Delivery Date:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
See Also
IFB 161212 Pipe Rehabilitation Rte 644 Status: Open IFB 128692 Virginia Department of
State Government of Virginia
Due by 9/28/2026
Bid Number: RFQ Q004180 Bid Title: RFQ Q004180 6" Godwin Suction and Discharge
City of Danville
Due by 10/06/2026
Expansion Joints at Western Dam Status: Open IFB 128276 City of Norfolk -City
State Government of Virginia
Due by 9/30/2026
Bid Number: RFQ Q004180 Bid Title: RFQ Q004180 6" Godwin Suction and Discharge
City of Danville
Due by 10/06/2026