| Agency: | City of Shreveport |
|---|---|
| State: | Louisiana |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 9, 2026 |
| Due Date: | Jul 7, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| SUPPLEMENTAL AND TECHNICAL SPECIFICATIONS |
SUPPLEMENTAL AND
TECHNICAL SPECIFICATIONS
For the Construction of
NORTHWEST APRON RECONSTRUCTION - PHASE 1
SHREVEPORT DOWNTOWN AIRPORT
SHREVEPORT, LOUISIANA
City of Shreveport Project No. IFB 26-034
Garver Project No. 2402332
ISSUED FOR BID
Prepared For:
SHREVEPORT AIRPORT AUTHORITY
MAY 2026
PAGE INTENTIONALLY LEFT BLANK.
| DTN NW APRON RECONSTRUCTION - PHASE 1 GARVER PROJECT NO. 2402332 SHREVEPORT AIRPORT AUTHORITY PROJECT NO. IFB 26-034 | ||||
|---|---|---|---|---|
| I hereby certify that the applicable portions of this project plans and specifications were | ||||
| prepared by me or under my direct supervision and that I am a duly Licensed Engineer under | ||||
| the laws of the State of Louisiana. | ||||
| SEAL AND SIGNATURE | APPLICABLE DIVISION OR | |||
| PROJECT RESPONSIBILITY | ||||
| Blake Roberson, P.E. Digitally Signed: May 1193, 2026 | Project Manager |
| DTN NW APRON RECONSTRUCTION - PHASE 1 |
|---|
| GARVER PROJECT NO. 2402332 |
| SHREVEPORT AIRPORT AUTHORITY PROJECT NO. IFB 26-034 |
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
00 00 01 CERTIFICATIONS
DTN NW APRON RECONSTRUCTION - PHASE 1
GARVER PROJECT NO. 2402332
SHREVEPORT AIRPORT AUTHORITY PROJECT NO. IFB 26-034
I hereby certify that the applicable portions of this project plans and specifications were
prepared by me or under my direct supervision and that I am a duly Licensed Engineer under
the laws of the State of Louisiana.
APPLICABLE DIVISION OR
SEAL AND SIGNATURE
PROJECT RESPONSIBILITY
Blake Roberson, P.E. Project Manager
Digitally Signed: May 1193, 2026
Click here to enter text.
Issued for Bid 00 00 01-1 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
PAGE INTENTIONALLY LEFT BLANK
Click here to enter text.
Issued for Bid 00 00 01-2 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
DTN NW APRON RECONSTRUCTION
00 01 10 TABLE OF CONTENTS
CONTRACT DOCUMENTS AND GENERAL REQUIREMENTS
00 00 01 CERTIFICATIONS
00 01 10 TABLE OF CONTENTS
SUPPLEMENTAL SPECIFICATIONS
SS-101 SAFETY PLAN COMPLIANCE DOCUMENT (SPCD)
SS-110 STANDARD SPECIFICATIONS
SS-120 CONSTRUCTION SAFETY AND SECURITY
SS-262 TIEDOWN ANCHORS
TECHNICAL SPECIFICATIONS
C-100 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)
C-102 TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION
CONTROL
C-105 MOBILIZATION
P-101 PREPARATION/REMOVAL OF EXISTING PAVEMENTS
P-152 EXCAVATION, SUBGRADE, AND EMBANKMENT
P-209 CRUSHED AGGREGATE BASE COURSE
P-403 ASPHALT MIX PAVEMENT SURFACE COURSE
P-602 EMULSIFIED ASPHALT PRIME COAT
P-603 EMULSIFIED ASPHALT TACK COAT
P-605 JOINT SEALANTS FOR PAVEMENTS
P-620 RUNWAY AND TAXIWAY MARKING
D-701 PIPE FOR STORM DRAINS AND CULVERTS
T-904 SODDING
T-905 TOPSOIL
Click here to enter text.
Issued for Bid 00 01 10-1 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
PAGE INTENTIONALLY LEFT BLANK
Click here to enter text.
Issued for Bid 00 01 10-2 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
ITEM SS-101 SAFETY PLAN COMPLIANCE DOCUMENT (SPCD)
DESCRIPTION
101-1.1 The Contractor shall thoroughly review the approved Construction Safety and Phasing Plan (CSPP)
and shall comply with approved CSPP. The Contractor shall certify such compliance by completing the
attached SPCD and submitting to the Engineer for approval. No separate payment shall be made for
completion of the SPCD.
Issued for Bid SS-101-1 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
PAGE INTENTIONALLY LEFT BLANK
Issued for Bid SS-101-2 Garver Project No. 2402332
| Owner: SHREVEPORT AIRPORT AUTHORITY | |
|---|---|
| Contact: Stacy Kuba | Phone: 318-780-1332 |
| Engineer: GARVER, LLC | |
| Project Manager: Blake Roberson, PE | Phone: 501-352-8884 |
| Project Engineer: Jordan Culver | Phone: 501-366-3143 |
| Construction Observer: | Phone: |
| Materials Testing: | Phone: |
| Contractor: | |
| Project Manager: | Phone: |
| Superintendent: | Phone: |
| Subcontractors: | Phone: |
| LIST ALL SUBS | |
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
Contractor Safety Plan Compliance Documents
Owner Name: SHREVEPORT AIRPORT AUTHORITY
Airport: Shreveport Downtown Airport
Project Description: DTN NW Apron Reconstruction - Phase 1
Contractor:
Each item listed below corresponds to a specific section of the approved CSPP. The Contractor shall certify
that he/she will comply with each section of the approved CSPP. Each certified section with a "no" response
must be fully explained in an attachment to the SPCD. The document shall be signed and dated by a principal
or owner in the Contractor's company. All other requested information shall be completed by the Contractor
and submitted to the Engineer for approval as part of the SPCD.
1. Section 1 - Coordination: This project shall be completed in accordance with Section 1
"Coordination" of the approved Construction Safety and Phasing Plan.
Owner: SHREVEPORT AIRPORT AUTHORITY
Contact: Stacy Kuba Phone: 318-780-1332
Engineer: GARVER, LLC
Project Manager: Blake Roberson, PE Phone: 501-352-8884
Project Engineer: Jordan Culver Phone: 501-366-3143
Construction Observer: Phone:
Materials Testing: Phone:
Contractor:
Project Manager: Phone:
Superintendent: Phone:
Subcontractors: Phone:
LIST ALL SUBS
Yes No
2. Section 2 - Phasing: This project shall be completed in accordance with Section 2 "Phasing" of
the approved Construction Safety and Phasing Plan.
Yes No
3. Section 3 - Areas of Operations Affected by Construction Activity: This project shall be
completed in accordance with Section 3 "Areas of Operations Affected by Construction Activity" of the
approved Construction Safety and Phasing Plan.
Yes No
Issued for Bid SS-101-3 Garver Project No. 2402332
Shreveport Downtown Airport
DTN NW Apron Reconstruction - Phase 1
4. Section 4 - Protection of Navigational Aids (NAVAIDS): This project shall be completed in
accordance with Section 4 "Protection of Navigational Aids (NAVAIDS)" of the approved Construction
Safety and Phasing Plan.
Yes No
5. Section 5 - Contractor Access: This project shall be completed in accordance with Section 5
"Contractor Access" of the approved Construction Safety and Phasing Plan.
Yes No
6. Section 6 - Wildlife Management: This project shall be completed in accordance with Section 6
"Wildlife Management" of the approved Construction Safety and Phasing Plan.
Yes No
7. Section 7 - Foreign Object Debris (FOD) Management: This project shall be completed in
accordance with Section 7 "Foreign Object Debris (FOD) Management" of the approved Construction
Safety and Phasing Plan.
Yes No
8. Section 8 - Hazardous Materials (HAZMAT) Management: This project shall be completed in
accordance with Section 8 "Hazardous Materials (HAZMAT) Management" of the approved Construction
Safety and Phasing Plan.
Yes No
9. Section 9 - Notification of Construction Activities: This project shall be completed in
accordance with Section 9 "Notification of Construction Activities" of the approved Construction Safety and
Phasing Plan.
Yes No
10. Section 10 - Inspection Requirements: This project shall be completed in accordance with
Section 10 "Inspection Requirements" of the approved Construction Safety and Phasing Plan.
Yes No
11. Section 11 - Underground Utilities: This project shall be completed in accordance with Section
11 "Underground Utilities" of the approved Construction Safety and Phasing Plan.
Yes No
12. Section 12 - Penalties: This project shall be completed in accordance with Section 12 "Penalties"
of the approved Construction Safety and Phasing Plan.
Yes No
13. Section 13 - Special Conditions: This project shall be completed in accordance with Section 13
"Special Conditions" of the approved Construction Safety and Phasing Plan.
Yes No
Issued for Bid SS-101-4 Garver Project No. 2402332
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
IFB 26-038 Flournoy Lucas Road to Wallace Lake Road Intersection Improvements Bid Documents
City of Shreveport
Bid Due: 8/06/2026
Bid Number Description Date Issued Bid Open Date/Time 3000026472 Johnson Bayou Cultch Project
State Government of Louisiana
Bid Due: 8/18/2026
Date: Thursday, September 10, 2026 Time: 2:00 PM Description: WWTP Digester and Settling
City of Baton Rouge
Bid Due: 9/10/2026
Bid Number Description Date Issued Bid Open Date/Time 923456-26-26-1 Lake Superior Dr Drainage
State Government of Louisiana
Bid Due: 8/11/2026