Addendum 1
IFB 26-021
Issue Date:
Ques on Due:
Bid Due Date:
Godwin Portable Pump
December 09, 2025
December 02, 2025 by 5:00 pm
December 23, 2025 10:30 am
Request for Informa on
1 Q: What is the intended applica on for the pump and A: Dewatering filter basins and
hoses?
pipe trenches, possibly
pressuring up the system or
filling a tank.
2 Q: What liquid will be going through the pump and is A: Ground water
this a main pump or emergency response?
3 Q: Are remote capabili es required and would a
subscrip on need to be factored into the bid price?
A: No
4 Q: What are the intended duty points such as gallons A: Godwin CD150S Dri-Prime
per minute, sta c li , desired RPMs, and maximum Pump as base bid. Similar
discharge length from pump?
pumps to be evaluated based
upon price and performance.
Approx Pump Head: 1200gpm
@ 120 TDH Approx Suc on li
at 1800RPM: See below Image
in notes.
5 Q: Will there be any required labor by the Contractor A: No
such as training, equipment demonstra on, or work
to be done?
6 Q: Are there any warranty or serviceability
requirements?
A: No
7 Q: Are there minimum working and burst pressures
for the suc on discharge hoses?
A: Suc on hose capable of
suc on li of 25 . Discharge
hose rated at 25psi minimum
(for dewatering only)
8 Q: Is there a material or brand preference for either A: No
hose?
9 Q: Do the fi ngs need to be a ached a specific way A: No
to each hose?
10 Q: Are the Bauer fi ngs supposed to be male,
female, or one of each on each hose?
A: These hoses will need to be
male on one end and female on
the other.
11 Q: Is there a preference to the type or size of strainer A: No, as long as it’s a Bauer
ports?
fi ng.
12 Q: Does the strainer need a specific kind of fi ng for A: Bauer Fi ng
a achment?
13 Q: Please clarify what is meant by the Bauer Stepbow A: Stepbow as needed to
line item by including a reference or further detailed relocate from pump discharge
descrip on?
to ground level
14 Q: Is there a set delivery meframe from the date of A: Soon as possible.
order?
15 Q: Is the Contractor required to be registered with E- A: Con ngent upon award.
verify at the me of submission or is that con ngent
upon award?
16 Q: Can a single company submit mul ple bids given
acceptable subs tutes
A: Yes
17 Q: How many test hours on a unit would be
considered acceptable?
A: 5 hours
18 Q: Can the bid opening be extended in order to
ensure submi als are able to reflect responses to
ques ons?
A: Yes
*Notes:
- Image for ques on 4.
- Consider adding to bid items conversion flanges from suc on and discharge flange of
proposed pump to 5” Storz connec on for Water Supply usage.