IFB for Replacement Dust Collection System – TSD Woodshop
| Agency: | State Government of Texas |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 21, 2026 |
| Due Date: | Mar 5, 2026 |
| Solicitation No: | 0006613 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
0006613
Posted
Heather Goll
(512) 463-0209
heather.goll@tfc.texas.gov
heather.goll@tfc.texas.gov
3/5/2026
3:00 PM
303
21+ Days for Solicitation Notice
Exempt (Attorney or Texas SmartBuy Member)
1/21/2026
1/21/2026 2:44 pm
91036-Heating, Air Conditioning, And Ventilation Maintenance And Repair Services (Including Installation);
03134-Dust Collectors, Industrial Type;
District 14,
Equipment ID pictures are available for download only on Bonfire due to file size restrictions.
The Texas Facilities Commission (TFC) is soliciting bids from qualified vendors for the replacement of the dust collection system in the woodshop at the Texas School for the Deaf (TSD). The purpose of this project is to ensure compliance with safety standards and NFPA fire codes.
Scope of Work
The successful bidder shall provide all labor, materials, equipment, layout, permits (if required), and services to complete a turnkey dust collection system replacement, including:
- Demolition & Disposal
- Remove and properly dispose of the existing dust collection system, ducts, and related debris.
- All removed materials shall be transported to an approved recycling or disposal facility in compliance with local, state, and federal regulations.
- The existing dust collector shall be transported to the TFC Surplus Warehouse located at 6506 Bolm Road, Austin, TX 78721. Transportation, loading, and unloading of dust collector shall be included in demolition costs in pricing sheet.
- Vendor is responsible for disposal and must be able to provide disposal receipts or documentation upon request to verify proper handling.
- Protect adjacent landscaping, irrigation, structures, and utilities during removal and installation.
- Cap or reroute any low-voltage or wiring (if present) per code.
- New Dust Collection System Installation
- Option 1: System Exhaust Outside.
- Option 2: System Exhaust Inside (current exhaust method).
- New system meets the following specifications:
- Capacity: Appropriately sized CFM requirements based on shop size and equipment.
- Noise Level: Shall be kept within a reasonable range.
- Compliance: Must meet OSHA and local building codes.
- Spark detector and extinguishing system compliant with NFPA requirements.
- Connect system to existing woodworking equipment (planers, saws, sanders, etc.).
- Provide plumbing, electrical, and ductwork replacements to support installation of new system.
- Conduct system testing and provide operational training for staff.
- Site Work & Restoration
- Call utility locate, if needed.
- Maintain site safety and cleanliness; restore disturbed areas to pre-project condition.
- Remove all debris daily; final clean-up upon completion.
- Quality & Warranty
- Work to be performed by experienced personnel under direct supervision.
- Provide 1-year minimum workmanship warranty and manufacturer warranties for materials.
- Correct any defects in materials or workmanship at no additional cost during warranty period.
See Also
Follow CBP Vehicle Fuel Management Services Active Contract Opportunity Notice ID CBP_Vehicle_Fuel_Management_Services(082826) Related
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/18/2026
Follow El Paso Access Control Upgrade - Amendment 0001 Active Contract Opportunity Notice
JUSTICE, DEPARTMENT OF
Due by 9/17/2026
Austin Electrical Service Power Installation Follow Solicitation Solicitation ID: 405-26R0027061 Status: Posted Contact
State Government of Texas
Due by 9/18/2026
Follow MUNS Security Cameras Active Contract Opportunity Notice ID FA466126Q0085 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 9/21/2026