Supplemental Specifica(cid:415)ons for
PAVEMENT IMPROVEMENTS - CURTIS LANE AND
LAKESHORE DRIVE
PROJECT OWNER:
CITY OF SHREVEPORT
SHREVEPORT, LOUISIANA
March, 2026
PREPARED BY:
03/18/2026
VOLKERT, INC.
SHREVEPORT, LOUISIANA
318-210-0761
2021 CITY OF SHREVEPORT STANDARD SPECIFICATIONS FOR INFRASTRUCTURE IMPROVEMENTS GOVERN AS AMMENDED BY
THESE SUPPLEMENTAL SPECIFICATIONS
TABLE OF CONTENTS
PART 1: GENERAL PROVISIONS SERIES
SECTION 100 Definitions and Abbreviations (Not Used) ............................................. 100
SECTION 101 Bidding Requirements (Not Used)......................................................... 101
SECTION 102 Award and Execution of Contract (Not Used) ....................................... 102
SECTION 103 Scope of Work (Modified) ...................................................................... 103
SECTION 104 Control of Work (Not Used) .................................................................. 104
SECTION 105 Changes in Work (Not Used) ................................................................ 105
SECTION 106 Control of Materials (Not Used) ............................................................ 106
SECTION 107 Governmental Regulations (Not Used) ................................................. 107
SECTION 108 Contractor's Responsibilities (Not Used) ............................................... 108
SECTION 109 Utilities (Not Used) ................................................................................ 109
SECTION 110 Prosecution and Progress of Work (Not Used) ...................................... 110
SECTION 111 Measurement and Payment (Not Used) .............................................. 111
PART 2 - MATERIALS
SECTION 200 Aggregates (Not Used) .......................................................................... 200
SECTION 201 Concrete, Mortar and Related Materials (Not Used) ............................ 201
SECTION 202 Masonry Materials (Not Used) ...............................................202
SECTION 203 Soil and Grasses (Not Used) .................................................................. 203
SECTION 204 Bituminous Materials (Not Used).......................................................... 204
SECTION 205 Timber and Preservative Treatment (Not Used) ................................... 205
SECTION 206 Piles (Not Used) ..................................................................................... 206
SECTION 207 Miscellaneous Metal ltems (Not Used) ................................................. 207
SECTION 208 Storm Drain Pipe (Not Used) ................................................................. 208
SECTION 209 Water and Sewer - Piping and Appurtenance (Not Used) ..................... 209
SECTION 210 Paint and Protective Coatings (Not Used) ............................................. 210
SECTION 211 Geotextile Fabric and Geocomposite Systems (Not Used) ................... 211
SECTION 212 Erosion Control Matting and Hardware (Not Used) .............................. 212
SECTION 213 Traffic Signal Materials (Not Used) ...................................................... 213
SECTION 214 NOT USED ............................................................................................. 214
SECTION 215 Signs and Pavement Markings (Not Used) ............................................ 215
PART 3 - EARTHWORK
SECTION 301 Clearing and Grubbing (Not Used) ........................................................ 301
SECTION 302 Removal of Structures and Obstructions (Not Used) ............................ 302
SECTION 303 Roadway Excavation (Not Used) ........................................................... 303
SECTION 304 Fill Construction (Not Used) .................................................................. 304
SECTION 305 Borrow Excavation (Not Used) .............................................................. 305
SECTION 306 Muck Excavation (Not Used) ................................................................. 306
SECTION 307 Channel Excavation (Not Used) ............................................................. 307
SECTION 308 Structural Excavation and Backfill (Not Used) ....................................... 308
SECTION 309 Rip-rap Construction (Not Used) ........................................................... 309
SECTION 310 Temporary Erosion Control (Not Used) ................................................. 310
TOC-1
PART 4 - ROADWAY SUBGRADE PREPARATION AND BASE COAT
SECTION 401 Subgrade Preparation (Not Used) ......................................................... 401
SECTION 402 Soil Cement Base (Not Used)................................................................. 402
SECTION 403 Aggregate Base (Not Used) ................................................................... 403
SECTION 404 Base Reinforcement (Not Used) ............................................................ 404
SECTION 405 Pavement Undersealing (Not Used) ..................................................... 405
PART 5 - AGGREGATE SURFACE COURSE
SECTION 501 Aggregate Surface Course (Not Used) ................................................... 501
SECTION 502 Tack Coat (Not Used) ............................................................................. 502
SECTION 503 Prime Coat (Not Used) .......................................................................... 503
SECTION 504 Asphaltic Surface Treatment (Not Used) ............................................... 504
SECTION 505 Asphaltic Concrete Friction Course (Not Used) ..................................... 505
SECTION 506 Slurry Seal Coat Surfacing (Not Used) ................................................... 506
SECTION 507 Asphaltic Concrete Pavement (Not Used) ............................................. 507
SECTION 508 Cold Planing Asphaltic Pavement (Not Used) ........................................ 508
SECTION 509 Portland Cement Concrete Pavement (Not Used) ................................ 509
PART 6 - CONCRETE CONSTRUCTION
SECTION 601 Concrete Structures (Not Used) ............................................................ 601
SECTION 602 Pneumatic Placed Concrete .................................................................. 602
SECTION 603 Precast Concrete (Not Used) ................................................................. 603
SECTION 604 Prestressed Concrete (Not Used) .......................................................... 604
SECTION 605 Concrete Curbs, Walks, Gutters, Driveways (Not Used) ...................... 605
SECTION 606 Concrete Reinforcement (Not Used) ..................................................... 606
SECTION 607 Drilled Shaft Foundations (Not Used) ................................................... 607
SECTION 608 Ditch Paving and Concrete Revetment (Not Used) ............................... 608
SECTION 609 Raising, Void Filling and Undersealing Pavements Using Polyurethane
(Not Used) 609
PART 7 - MASONRY CONSTRUCTION
SECTION 701 Concrete Masonry Unit Construction (Not Used) ................................. 701
SECTION 702 Brick Masonry(Not Used) ..................................................................... 702
SECTION 703 Mechanically Stabilized Earth Wall with Masonry Unit (Not Used) ...... 703
PART 8 - METAL FABRICATION AND CONSTRUCTION
SECTION 801 Structural Steel (Not Used) ................................................................... 801
SECTION 802 Metal Railings (Not Used) ..................................................................... 802
SECTION 803 Chain Link Fence (Not Used) ................................................................ 803
TOC-2
PART 9 - PILE DRIVING AND TIMBER CONSTRUCTION
SECTION 901 Pile Driving (Not Used) ......................................................................... 901
SECTION 902 Timber Construction (Not Used) ........................................................... 902
PART 10 - PIPELINE CONSTRUCTION
SECTION 1001 Storm Drain Pipe Installation (Not Used) ............................................ 1001
SECTION 1002 Excavation and Backfill (Not Used) ..................................................... 1002
SECTION 1003 Abandonment of Existing Water Main and
Sanitary Sewer Facilities (Not Used) ................................................... 1003
SECTION 1004 Trench Safety Systems (Not Used) ...................................................... 1004
SECTION 1005 Trench Dewatering (Not Used) ........................................................... 1005
SECTION 1006 Boring, Tunneling and Pipe Jacking Operations (Not Used) ................ 1006
PART 11 - PAINTING
SECTION 1101 Coating (Not Used) .............................................................................. 1101
PART 12 - MISCELLANEOUS CONSTRUCTION
SECTION 1201 Landscaping and Seeding (Not Used) .................................................. 1201
SECTION 1202 Mobilization (Not Used) ...................................................................... 1202
SECTION 1203 Erosion Control Systems (Not Used) ................................................... 1203
PART 13 - TRAFFIC
SECTION 1301 Traffic Signs and Devices (Not Used) .................................................. 1301
SECTION 1302 Traffic Control Components (Not Used) .............................................. 1302
SECTION 1303 Plastic Pavement Markings (Not Used) ............................................... 1303
SECTION 1304 Painted Traffic Striping (Not Used) ..................................................... 1304
SECTION 1305 Raised Pavement Markers (Not Used) ................................................ 1305
SECTION 1306 Temporary Signs, Barricades, Barriers & Pavement Markings (Not Used)1306
SECTION 1307 Street Lighting (Not Used) ................................................................... 1307
PART 14 - NOT USED
PART 15 - BYPASS PUMPING
SECTION 1510 Bypass Pumping (Not Used) ................................................................ 1501
PARTS 16 THRU 19 - NOT USED
PART 20 - SEWER
SECTION 2000 Gravity Sewer Mains (Not Used) ......................................................... 2000
SECTION 2100 Sewer Force Mains (Not Used) ............................................................ 2100
SECTION 2200 Sanitary Sewer Manholes (Not Used) ................................................. 2200
SECTION 2210 Manhole Rehabilitation (Not Used) .................................................... 2210
SECTION 2220 Monolithic Manhole Lining Systems (Not Used) ................................. 2220
SECTION 2300 Sanitary Sewer Testing of Pipes and Manholes (Not Used) ............... 2300
TOC-3
SECTION 2400 Manhole Inflow Preventers (Not Used) .............................................. 2400
SECTION 2650 Sewer Line and Service Lateral Cleaning (Not Used) .......................... 2650
SECTION 2652 Television Inspection (Not Used) ........................................................ 2652
SECTION 2654 Removal of Protruding Taps and Obstructions by Other Means (Not Used)
............................................................................................................ 2654
SECTION 2656 Point Repairs (Not Used) ..................................................................... 2656
SECTION 2680 Condition Assessment Sewer Line Cleaning and CCTV Inspection(Not Used)
............................................................................................................ 2680
SECTION 2700 Pipe Bursting (Not Used) ..................................................................... 2700
SECTION 2764 Service Lateral Connection on Liner (Not Used) ................................. 2764
SECTION 2765 Cured-in-Place Short Liners (Not Used) ............................................. 2765
SECTION 2769 Cured-in-Place Pipe Lining (Not Used) ................................................ 2769
SECTION 2800 Package Submersible Lift Station (Not Used) ...................................... 2800
SECTION 2810 Wetwell Lining System (Not Used) ..................................................... 2810
SECTION 2900 Sewer Line Cleaning (Not Used) .......................................................... 2900
PART 30 - WATER
SECTION 3000 Water Mains (Not Used) ..................................................................... 3000
SECTION 3100 Testing, Flushing and Sterilization of Water Mains (Not Used) .......... 3100
SECTION 3200 Water Service Lines and Meter Boxes (Not Used) .............................. 3200
SECTION 3300 Fire Hydrants (Not Used) .................................................................... 3300
SECTION 3400 Waterworks Valves(Not Used) ........................................................... 3400
SECTION 3500 Wet Connections and Appurtenances (Not Used) .............................. 3500
PART 40 - GENERAL REQUIREMENTS
SECTION 4010 Summary of Work (Modified) ............................................................. 4010
SECTION 4014 Construction Sequence (Modified) ...................................................... 4014
SECTION 4025 Measurement and Payment (Modified) .............................................. 4025
SECTION 4026 Pay Estimates (Not Used) .................................................................... 4026
SECTION 4035 Change Order Procedures (Not Used) ................................................ 4035
SECTION 4038 Requests for Information (Not Used).......................................4038
SECTION 4050 Survey Controls (Not Used) ................................................................. 4050
SECTION 4110 Storm Water Permitting Procedures (Not Used) ................................. 4110
SECTION 4200 Project Meetings (Not Used) ............................................................... 4200
SECTION 4300 Submittals (Not Used) ......................................................................... 4300
SECTION 4310 Construction Scheduling (Not Used).................................................... 4310
SECTION 4322 Photographic Documentation (Not Used) ......................................... 4322
SECTION 4370 Schedule of Values (Not Used) ............................................................ 4370
SECTION 4400 Quality Control (Not Used) ................................................................ 4400
SECTION 4562 Dust Control(Not Used) ..................................................................... 4562
SECTION 4600 Delivery Storage and Handling (Not Used) .......................................... 4600
SECTION 4630 Substitutions and Product Options (Not Used) .................................. 4630
SECTION 4700 Contract Closeout (Not Used) .............................................................. 4700
SECTION 4710 Cleaning (Not Used) ........................................................................... 4710
SECTION 4720 As-Built Drawings (Not Used) .............................................................. 4720
SECTION 4740 Warranties and Bonds (Not Used) ..................................................... 4740
TOC-4
APPENDIX A- GEOTECHNICAL REPORTS
SECTION A.100 Curtis Lane: South Fairway Drive to Woodland Way ................. ......A100
SECTION A.200 Lakeshore Drive: Grove Street to Mertis Avenue ...................... ......A100
TOC-5
3/18/2020
SECTION 103
SCOPE OF WORK
103.1 INTENT OF CONTRACT. The intent of the contract is to provide for performance and
completion of the work described. The Contractor shall furnish all labor, materials, equipment, tools,
transportation and supplies required to complete the Work in accordance with the plans, project
specifications and terms of the contract. When an item in the contract contains a choice to be made by the
Contractor, the Contractor shall indicate the choice to the Engineer in writing. When the project
specifications reference or require the use of "manufacturer's recommendations or specifications," the
Contractor shall provide the Engineer with a current copy of these recommendations or specifications.
103.2 ALTERATION OF THE CONTRACT. Without invalidating the Contract, City may, at any
time or from time to time, order addition, deletion, or revision of Work by a Change Order or a Work
Change Directive. Upon receipt of any such document, Contractor shall promptly proceed with the Work
involved which will be performed under the applicable conditions of the Contract Documents (except as
otherwise specifically provided). Pay Items affected by such additions, deletions, or revisions shall be
performed in accordance with the requirements of the Contract Documents, and payment will be made at
the same unit prices as other parts of the Work, except as provided in Section 105.
When the City orders deletion of Work because of untimely or unsatisfactory performance by the
Contractor, the City may perform the Work and back charge the actual cost of performing the Work.
The Contractor shall cooperate with the City or its contractors during performance of the Work.
City may order addition, deletion, or revision of Work and authorize adjustments to the Contract Amount
and/or Contract Time in a formal Change Order. Engineer may order addition, deletion, or revision of
Work, but may not authorize adjustments to the Contract Amount or Contract Time, in a Work Change
Directive. A Work Change Directive is evidence that the parties expect that the change ordered or
documented by a Work Change Directive will be incorporated in a subsequent Change Order following
negotiations by the parties as to its effect, if any, on the Contract Amount or Contract Time.
Engineer may authorize minor variations in the Work from the requirements of the Contract Documents
which do not involve an adjustment in the Contract or the Contract Time and are compatible with the
design concept of the completed Project as a functioning whole as indicated by the Contract Documents.
Engineer may order changes in details, including changes in materials, processes, and sequences.
These minor variations and changes in details may be accomplished by a Field Order and will be binding on
City and also on Contractor, who shall perform the Work involved promptly. If City or Contractor believes
that a Field Order justifies an adjustment in the Contract Amount or Contract Time, or both, and the
parties are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a
Claim may be made therefor as provided in Section 105.
The requirements of the Contract Documents may be supplemented, and minor variations and deviations
in the Work may be authorized, by one or more of the following ways:
a. Field Order
b. Engineer's approval of a Shop Drawing or Sample (subject to provisions of Section 104)
c. Engineer's written interpretation or clarification
Alterations to the contract as provided for by this section shall not invalidate the contract nor release the
surety, and the Contractor agrees to accept the Work as altered, as if it had been part of the original
contract. The Contractor shall notify the surety of any alterations to the contract. Alterations of the
103 - 1
3/18/2020
contract shall not involve work beyond the termini of the proposed work except as necessary to
satisfactorily complete the project. Approval of all plan changes is subject to the approval and concurrence
from the appropriate funding source. No plan change will be assumed to be approved until the signed and
approved plan change is returned to the originator.
103.3 MAINTENANCE OF TRAFFIC. Contractor shall furnish, erect, and maintain traffic control
in accordance with the plans and MUTCD. This includes furnishing, erecting, and maintaining barricades,
warning signs and delineators, and providing flaggers, pilot cars and other traffic control. The Contractor
shall keep the portion of the project being used by public traffic, whether through or local traffic, in such
condition that traffic (including mail delivery) will be adequately accommodated. The Contractor shall also
provide and maintain in a safe condition all temporary approaches or crossings, intersections with roads,
streets, businesses, parking lots, residences, garages and farms. Traffic control will be paid for at the unit
price and lump sum items included in the contract. Payment will include all labor, materials, equipment,
supplies, and incidentals required to complete the work per Section 1306. If no pay items for traffic control
exist, costs for traffic control will be included in other unit and lump sum pay items.
103.4 FINAL CLEANING UP. Before final completion, the right-of-way, borrow and local material
sources, and areas occupied by the Contractor in connection with the work shall be cleaned of rubbish,
excess materials, temporary structures, haul roads and equipment. All parts of the work, including property
adjacent to the right-of-way, which have been damaged or rendered unsightly during the work shall be left
in satisfactory condition and when required, the right-of-way shall be mowed in accordance with City
maintenance standards, all at no direct pay.
103.5 GUARANTEES. The Contractor guarantees, by signing the contract, mechanical and electrical
equipment, apparatus, materials and workmanship provided under the contract for a period of two years
after substantial completion on projects not involving federal funds and six months after final completion on
28 Federal-Aid Projects. Instruction sheets that are required to be furnished by the manufacturer for
materials, supplies, and operation shall be delivered by the Contractor to the Engineer prior to final
completion of the project, with the following written warranties and guarantees:
1. The manufacturer's standard warranty for each piece of mechanical and electrical equipment
or apparatus furnished under the contract.
2. The Contractor's guarantee that, during the guarantee period, necessary repair or
replacement of the warranted equipment or apparatus will be made by the Contractor at
no direct pay.
3. The Contractor's guarantee for satisfactory operation of the mechanical and electrical
systems furnished and constructed under the contract for the guarantee period.
4. The Contractor's guarantee per Specification Section 4700.
103.6 DIFFERING SITE CONDITIONS, SUSPENSIONS OF WORK, AND SIGNIFICANT
CHANGES IN THE CHARACTER OF THE WORK.
A. Differing Site Conditions:
1. During the progress of the work, if subsurface or latent physical conditions are
encountered at the site differing materially from those indicated in the contract or if
unknown physical conditions of an unusual nature, differing materially from those
ordinarily encountered and generally recognized as inherent in the work provided for
in the contract, are encountered at the site, the party discovering such conditions shall
promptly notify the other party in writing of the specific differing conditions before they
are disturbed and before the affected work is performed.
103 - 2
3/18/2020
2. Upon written notification, the Engineer will investigate the conditions and if he
determines that the conditions materially differ and cause an increase or decrease in
the cost or time required for the performance of any work under the contract, an
adjustment, excluding loss of anticipated profits, will be made and the contract modified
in writing accordingly. The Engineer will notify the Contractor of his determination
whether or not an adjustment of the contract is warranted.
3. No contract adjustment which results in a benefit to the Contractor will be allowed
unless the Contractor has provided the required written notice.
4. The presence of ground water does not constitute differing site conditions. The
Contractor should expect to encounter ground water during normal excavation
operations.
B. Suspensions of Work Ordered by the Engineer.
1. If the performance of all or any portion of the work is suspended or delayed by the
Engineer in writing for an unreasonable period of time (not originally anticipated,
customary or inherent to the construction industry) and the Contractor believes that
additional compensation and/or contract time is due as a result of such suspension or
delay, the Contractor shall submit to the Engineer in writing a request for adjustment
within 7 calendar days of receipt of the notice to resume work. The request shall set
forth the reasons and support for such adjustment.
2. Upon receipt, the Engineer will evaluate the Contractor's request. If the Engineer agrees
that the cost and/or time required for the performance of the contract has increased
as a result of such suspension and the suspension was caused by conditions beyond the
control of and not the fault of the Contractor, its suppliers, or subcontractors, and not
caused by weather, the Engineer will make an adjustment (excluding profit) and modify
the contract in writing accordingly. The Engineer will notify the Contractor of his
determination whether or not an adjustment of the contract is warranted.
3. No contract adjustment will be allowed unless the Contractor has submitted the
request for adjustment within the time prescribed.
4. No contract adjustment will be allowed under this clause to the extent that
performance would have been suspended or delayed by any other cause, or for which
an adjustment is provided for or excluded under any other term or condition of this
contract.
C. Significant Changes in the Character of Work.
1. The Engineer reserves the right to make, in writing, at any time during the work, such
changes in quantities and such alterations in the work as are necessary to satisfactorily
complete the project. Such changes in quantities and alterations shall not invalidatethe
contract nor release the surety, and the Contractor agrees to perform the work as
altered.
2. If the alterations or changes in quantities significantly change the character of the work
under the contract, whether or not changed by any such different quantities or
alterations, an adjustment, excluding loss of anticipated profits, will be made to the
contract. The basis for the adjustment shall be agreed upon prior to the performance
of the work. If a basis cannot be agreed upon, then an adjustment will be made either
for or against the Contractor in such amount as the Engineer may determine to be fair
and equitable.
103 - 3
3/18/2020
3. If the alterations or changes in quantities do not significantly change the character of
the work to be performed under the contract, the altered work will be paid for as
provided elsewhere in the contract.
4. The term "significant change" shall be construed to apply only to the following
circumstances:
a. When the character of the work as altered differs materially in kind or nature from
that involved or included in the original proposed construction or;
b. When a major item of work, as defined elsewhere in the contract, is increased, or
decreased, in excess of 25 percent of the contract quantity as awarded. Any
adjustment in unit price will be made on only that portion of the major item
exceeding the 25 percent increase, or, in the case of a decrease of the item by 25
percent or more, the remaining portion will be adjusted.
c. Where conflicts exist between these requirements and other sections of the
specifications, these requirements will govern.
103.7 REPORTS. The following reports of explorations and tests of subsurface conditions at or
adjacent to the site are available to the contractor for review.
a. Boring Logs completed by Dave Rambaran Geosciences, LLC for both Curtis Lane and Lakeshore
Drive and are included in the plan set on pages C4.9 - C4.10.
b. As-Built drawings for Lakeshore Drive are included in the plan set and can be found on page C4.8.
Contractor may utilize the technical data contained in boring logs, recorded measurements of subsurface
water levels, laboratory test results, and other factual, objective information regarding conditions at the Site
that are set forth in any geotechnical or environmental report prepared for the Project and made available
to Contractor, but such reports are not Contract Documents. , Contractor may not make any claim against
the City or the Engineer with respect to:
a. The completeness of such reports for the Contractor's purposes, including, but
not limited to, any aspects of the means, methods, techniques, sequences, and
procedures of construction to be employed by the Contractor, and safety
precautions and programs incident thereto; or
b. Other data, interpretations, opinions, and information contained in such reports;
or
c. Any Contractor interpretation of or conclusion drawn from any technical data or
any such other data, interpretations, opinions, or information.
END OF SECTION 103
103 - 4
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading,
DEPT OF DEFENSE
Bid Due: 8/21/2026
Date: Tuesday, August 11, 2026 Time: 2:00 PM Description: PUBLIC SAFETY COMPLEX H2
City of Baton Rouge
Bid Due: 8/11/2026
Follow ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 4-2026, OM26062
Federal Agency
Bid Due: 6/12/2028
Follow Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2,
Federal Agency
Bid Due: 6/18/2028