Invitation to Bid
FORMAL BID 2026-006
KITSAP COUNTY PUBLIC WORKS
DEPARTMENT, SEWER UTILITY
DIVISION
FOR
CENTRAL KITSAP TREATMENTPLANT
HVAC UPGRADES
RESPONSE DEADLINE:
Thursday, February 26, 2026 AT 2:00 p.m.
Kitsap County Sewer Utility
Central Kitsap Treatment Plant HVAC Upgrades
January 2026
Issued for Construction
SECTION 00 01 07
SEALS PAGE
SECTION 00 01 07 – SEALS PAGE
Professional Certification: I hereby certify that these documents were prepared or approved by
me and that I am a duly registered Professional Engineer in the State of Washington. My stamp
only applies to the sections listed below.
Name
Nicholas Jacoby, PE
License No. 56968
Sections
03 15 00
05 12 00
05 50 00
Stamp
Donn Stone, Jr., AIA
License No. 7590
Andrew Langdon, PE,
LEED AP
License No. 48289
06 10 00
06 10 10
07 01 50.19
07 21 19
07 62 00
07 71 00
07 92 00
08 11 13
08 51 13
08 62 00
08 71 00
08 80 00
08 91 00
09 51 00
09 91 13
09 91 23
Division 00
00 70 00
01 10 00
01 20 00
01 30 00
01 40 00
01 70 00
01 78 00
01 91 13
23 01 30.51
23 05 00
23 05 05
23 05 07
23 05 17
23 05 43
23 05 93
23 07 13
23 07 19
23 08 00
23 09 13
23 21 13
23 31 00
23 33 00
23 37 00
23 72 26
23 81 29
Kitsap County Sewer Utility
Central Kitsap Treatment Plant HVAC Upgrades
December 2025
Issued for Construction
SECTION 00 01 07
Name
Arthur Stokes, PE
License No. 34736
Nathanael Palmatier, PE
License No. 44806
Sections
26 05 00
26 05 05
26 05 19
26 05 26
26 05 29
26 05 33
26 05 43
26 05 53
26 05 73
26 08 00
26 09 23
26 22 00
26 24 13
26 24 16
26 27 26
26 28 16.16
26 43 00
26 51 00
27 05 00
27 05 33.13
27 10 00
40 61 13
40 61 98
40 67 13
40 70 13
SEALS PAGE
Stamp
END OF SECTION 00 01 07
Kitsap County Sewer Utility
Central Kitsap Treatment Plant HVAC Upgrades
December 2025
Issued for Construction
TABLE OF CONTENTS
General
Seals Page
Table of Contents
List of Drawings
Division 00
Invitation to Bid
Bid Proposal
Bid Guaranty Bond
Subcontractors List
Bidder Information
Bidder Responsibility Checklist
Non-Collusion Affidavit
Certification of Compliance with Wage Payment Statutes
Bidder’s Checklist
Subcontractor Responsibility Checklist
Project References
Capital Projects Contract Agreement
Public Works Payment Bond
Performance Bond to Kitsap County
00 70 00 General Contract Provisions
Division 01
01 10 00 Summary of Work
01 20 00 Price and Payments
01 30 00 Administrative Requirements
01 40 00 Quality Requirements
01 70 00 Execution and Closeout Requirements
01 78 00 Closeout Submittals
01 91 13 General Commissioning Requirements
Division 03
03 15 00 Concrete Accessories
Division 05
05 12 00 Structural Steel Framing
05 50 00 Metal Fabrications
Division 06
06 10 00 Rough Carpentry
06 10 10 Rough Carpentry
Kitsap County Sewer Utility
Central Kitsap Treatment Plant HVAC Upgrades
December 2025
Issued for Construction
Division 07
07 01 50.19 Roof Patching
07 21 19 Foam in Place Insulation
07 62 00 Sheet Metal Flashing and Trim
07 71 00 Roof Specialties
07 84 00 Firestopping
07 92 00 Joint Sealants
Division 08
08 11 13 Hollow Metal Doors and Frames
08 45 23 Fiberglass-Sandwich Panel Assemblies - Kalwall
08 51 13 Aluminum Windows
08 62 00 Modular Skylights
08 71 00 Door Hardware
08 80 00 Glazing
08 91 00 Louvers
Division 09
09 51 00 Acoustical Ceilings
09 91 13 Exterior Painting
09 91 23 Interior Painting
Division 23
23 01 30.51
23 05 00
23 05 05
23 05 07
23 05 17
23 05 43
23 05 93
23 07 13
23 07 19
23 08 00
23 09 13
23 21 13
23 31 00
23 33 00
23 37 00
23 72 26
23 81 29
HVAC Air Distribution System Cleaning
Common Work Results for HVAC
Project Closeout for HVAC
HVAC Demolition
Sleeves and Sleeve Seals for HVAC Piping
Vibration and Seismic Controls for HVAC
Testing, Adjusting, and Balancing for HVAC
Duct Insulation
HVAC Piping Insulation
HVAC Systems Commissioning
Instrumentation and Control Devices for HVAC
Hydronic Piping
HVAC Ducts and Casings
Air Duct Accessories
Air Outlets and Inlets
Indoor Energy Recovery Ventilators
Variable Refrigerant Flow HVAC Systems
Division 26
26 05 00
Common Work Results for Electrical
26 05 05
Selective Demolition for Electrical
Kitsap County Sewer Utility
Central Kitsap Treatment Plant HVAC Upgrades
TABLE OF CONTENTS
December 2025
Issued for Construction
This page summarizes the opportunity, including an overview and a preview of the attached documents.