ICBM Minuteman III Weapon System -- Power Supply
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Feb 12, 2025 |
| Due Date: | Feb 27, 2025 |
| Solicitation No: | FA820625Q0063 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Feb 12, 2025 04:06 pm MST
- Original Response Date: Feb 27, 2025 05:00 pm MST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Mar 14, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 1420 - GUIDED MISSILE COMPONENTS
-
NAICS Code:
- 336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
Hill Air Force Base , UTUSA
Upon closing of this pre-solicitation and subsequent solicitation, the Supply Chain Management Contracting Division, Hill Air Force Base, UT acting IAW the Federal Acquisition Regulation 13.106-1(b)(1) intends to award a Sole Source contract to OEM Kepco, Inc (85604) for power supply units in support of the Minuteman III Weapon System. In order to ensure immediate mission capability of the weapon system and maintain product integrity of the needed items, the government will award without delay. This non-commercial part has source controlled specifications requiring engineering approval from the design control authority. The testing and qualification required for engineering source approval of this item would likely result in substantial duplication of cost to the Government that is not expected to be recovered through competition and would result in unacceptable delay.
Propsed CLIN Structure as follows:
Line 0001
NSN: 6130010750313AH
Noun: Power Supply
P/N: 47C520948P1/PCX21-1ER
Qty: 37
Delivery: On 19 Jan 2026. Early delivery is acceptable
Line 0002
NSN: 6130DTG250068AH
Noun: Data -- Counterfeit Protection Plan
Qty: 1
Delivery: IAW DD1423-1. Early delivery is acceptable
- CP 801-775-4918 6050 GUM LN BLDG 1215
- HILL AFB , UT 84056-5825
- USA
- Brad Wood
- bradley.wood.11@us.af.mil
- Ben J Davies
- ben.davies@us.af.mil
- Feb 12, 2025 04:06 pm MSTPresolicitation (Original)
Related Document
| Mar 3, 2025 | [Solicitation (Original)] ICBM Minuteman III Weapon System -- Power Supply |
| Mar 10, 2025 | [Solicitation (Updated)] ICBM Minuteman III Weapon System -- Power Supply |
See Also
Follow Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production Active Contract
DEPT OF DEFENSE
Due by 2/18/2027
Follow Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production Active Contract
DEPT OF DEFENSE
Due by 1/04/2027