HVAC Replacement at USCG STA Washington
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | District of Columbia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 23, 2026 |
| Due Date: | Apr 30, 2026 |
| Solicitation No: | 30252PR260000011 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Apr 23, 2026 11:24 am EDT
- Original Date Offers Due: Apr 30, 2026 12:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 15, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: N041 - INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Bolling AFB , DC 20032USA
HVAC replacemet in accordance with the Attached SOW, to include:
a. Determine heat load calculations for the HVAC system using installed ducting system. Use heat load calculations to determine an appropriate size/capacity for indoor and outdoor units utilizing installed ducting. Provide owner with a written copy of load calculations. If it is determined that any duct work needs to be modified, changed or resized in any way due to the heat load calculations, contractor shall provide and install. New unit shall be EPA approved A2L based refrigerant either R-454B or R-32, preferably R-454B. Contractor shall pull and entire new line-set to include new suction lines and liquid lines that run from heat pump to air handler. Contractor shall install a new liquid line drier for each circuit and locate the new liquid line drier indoors near the air handler to prevent unnecessary corrosion from outside elements.
b. Remove and dispose of the current outdoor and indoor units. Unit will not have refrigerant in it.
c. Replace wiring and conduit from existing service disconnects to new pieces of equipment. Replace any corroded or damaged conduit or wiring found during the demo of existing equipment. If disconnects are not fused, then contractor shall replace any and all associated disconnects with new fused ones.
d. Replace all thermostat control wiring inside and outside with new UV rated wire. Provide and replace existing thermostat to match the system function.
- 2100 2ND ST, SW, ROOM B411
- WASHINGTON , DC 20593
- USA
- Samuel Salerno
- Samuel.T.Salerno@uscg.mil
- Phone Number 2068202120
- Apr 23, 2026 11:24 am EDTCombined Synopsis/Solicitation (Original)