ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
NOTICE OF REQUEST FOR PROPOSALS
ST. TAMMANY PARISH
St. Tammany Parish Government is seeking responses for the following project:
RFP# 25-11-3 – HVAC Maintenance
This RFP is available online at: LaPAC – Louisiana Procurement and Contract
Network:https://wwwcfprd.doa.louisiana.gov/osp/lapac/dspBid.cfm?search=department&term=1
85
It is the Proposer’s responsibility to check the LaPAC website frequently for any possible addenda
that may be issued. The Parish is not responsible for a proposer’s failure to download any addenda
documents required to complete an RFP.
Responses will be received by the Department of Procurement until 2:00 pm CST on
Wednesday, December 10, 2025. Each response will be evaluated by designated Parish personnel
after the submission deadline.
A non-mandatory pre-proposal site visit will be held as indicated below.
On Tuesday, November 18, 2025, at 9:00 AM, we will meet at the following locations in the
order listed below:
• Koop Campus Bldg. B - Meet at the Main Entrance of Building B.
21454 Koop Drive
Mandeville, LA 70471
• Safe Haven Complex - Meet at the Guard Shack/Main Entrance.
23515 Hwy 190
Mandeville, LA 70448
• Towers Building Complex - Meet at the Entrance by the parking lot.
520 Old Spanish Trail
Slidell, LA 70459
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG 985-898-2520
WWW.STPGOV.ORG
On Wednesday, November 19, 2025, at 9:00 AM, we will meet at the following locations in
the order listed below:
• Justice Center Complex - Meet at the North side of the building entrance.
701 N. Columbia Street
Covington, LA 70433
• EOC Complex - Meet at the Main Entrance.
510 E. Boston Street
Covington, LA 70433
• Tyler Street Complex - Meet at the Main Entrance.
620 N. Tyler Street
Covington, LA 70433
Each Proposal must be sealed. The outside of the envelope, box or package should be marked with
the Proposer’s Name and Address, the Proposal Name, the RFP #, and the Proposal Opening Date.
The successful Respondent must supply St. Tammany Parish Government with all required
documentation as specified in the RFP documents. Said Respondent must also be in Good Standing
and licensed to do business in the State of Louisiana.
Proposals will be received at the St. Tammany Parish Government Department of Procurement
Office, 21454 Koop Dr., Suite 2F, Mandeville LA., 70471 from each Respondent or his agent, or
by certified mail with return receipt requested.
Procurement Department
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG 985-898-2520
WWW.STPGOV.ORG
REQUEST FOR PROPOSAL
ST. TAMMANY PARISH GOVERNMENT
HVAC MAINTENANCE
RFP Number: 25-11-3
Proposal Opening Date: Wednesday, December 10, 2025
Proposal Opening Time: 2:00 PM
October 28, 2025
Version 2025.1
TABLE OF CONTENTS
PART I: OVERVIEW.................................................................................................................... 1
1.1 Background/Purpose ........................................................................................................ 1
1.2 Definitions ....................................................................................................................... 1
1.3 Schedule of Events........................................................................................................... 1
1.4 Proposal Submittal ........................................................................................................... 2
1.5 Proposal Response Format............................................................................................... 3
PART II: SCOPE OF WORK/SERVICES.................................................................................... 5
2.1 Scope of Work/Services................................................................................................... 5
2.2 Period of Agreement ........................................................................................................ 9
2.3 Price Schedule.................................................................................................................. 9
2.4 Deliverables ..................................................................................................................... 9
2.5 Location ........................................................................................................................... 9
PART III: EVALUATION .......................................................................................................... 10
PART IV: PERFORMANCE STANDARDS ............................................................................. 11
4.1 Performance Requirements............................................................................................ 11
4.2 Performance Measurement/Evaluation.......................................................................... 11
PART V: GENERAL PROVISIONS .......................................................................................... 11
5.1 Legibility/Clarity ........................................................................................................... 11
5.2 Confidential Information, Trade Secrets, and Proprietary Information......................... 11
5.3 Proposal Clarifications Prior to Submittal ..................................................................... 12
5.3.1 Pre-proposal Conference........................................................................................... 9
5.3.2 Proposer Inquiry Periods......................................................................................... 13
5.3.3 Blackout Period........................................................................................................10
5.4 Errors and Omissions in Proposal.................................................................................. 10
5.5 Performance Bond ......................................................................................................... 15
5.6 Changes, Addenda, Withdrawals ................................................................................... 15
5.7 Withdrawal of Proposal ................................................................................................. 15
5.8 Material in the RFP ........................................................................................................ 15
5.9 Waiver of Administrative Informalities......................................................................... 11
5.10 Proposal Rejection ......................................................................................................... 11
5.11 Ownership of Proposal................................................................................................... 11
5.12 Cost of Offer Preparation............................................................................................... 12
5.13 Non-negotiable Contract Terms..................................................................................... 16
5.14 Taxes .............................................................................................................................. 16
5.15 Proposal Validity ........................................................................................................... 16
5.16 Prime Provider Responsibilities..................................................................................... 16
5.17 Use of SubProviders ...................................................................................................... 16
5.18 Written or Oral Discussions/Presentations .................................................................... 17
5.19 Acceptance of Proposal Content.................................................................................... 17
5.20 Evaluation and Selection ............................................................................................... 17
5.21 Contract Negotiations .................................................................................................... 14
5.22 Contract Award and Execution...................................................................................... 18
5.23 Acknowledgment and Waiver of Protest Rights............................................................ 18
Version 2025.1
5.24 Notice of Intent to Award .............................................................................................. 15
5.25 Insurance Requirements................................................................................................. 19
5.26 SubProvider Insurance ................................................................................................... 19
5.27 Indemnification and Limitation of Liability .................................................................. 19
5.27.1 Duty to Defend ...................................................................................................... 15
5.27.2 Provider Liability .................................................................................................. 15
5.27.3 Force Majeure ................................................................................................................. 16
5.27.4 Indemnification ..................................................................................................... 16
5.27.5 Intellectual Property Indemnification ....................................................... 16
5.28 Fidelity Bond Requirements .......................................................................................... 17
5.29 Payment ......................................................................................................................... 17
5.29.1 Payment for Services .............................................................................................. 17
5.30 Termination.................................................................................................................... 17
5.30.1 Termination of the Contract for Cause ................................................................... 17
5.30.2 Termination of the Contract for Convenience ........................................................ 21
5.30.3 Termination for Non-Appropriation of Funds ........................................................ 21
5.30.4 Default of Provider..................................................................................................18
5.31 Assignment .................................................................................................................... 22
5.32 No Guarantee of Quantities ........................................................................................... 22
5.33 Audit of Records ............................................................................................................ 22
5.34 Civil Rights Compliance................................................................................................ 22
5.35 Record Retention ........................................................................................................... 19
5.36 Record Ownership ......................................................................................................... 19
5.37 Content of Contract/ Order of Precedence..................................................................... 19
5.38 Contract Changes ........................................................................................................... 19
5.39 Substitution of Personnel ............................................................................................... 20
5.40 Governing Law .............................................................................................................. 20
5.41 Anti-Kickback Clause .................................................................................................... 20
5.42 Clean Air Act ................................................................................................................. 20
5.43 Energy Policy and Conservation Act............................................................................. 20
5.44 Clean Water Act............................................................................................................. 24
5.45 Anti-Lobbying and Debarment Act ............................................................................... 24
5.46 Veteran Initiative and Hudson Initiative Program..........................................................22
Attachment “A” – Pricing Sheet, Project Specifications Appendix A, B, C, D, E, F, G, and H
Attachment “B” – Sample Contract
Attachment “C” – Acknowledgment and Waiver
Attachment “D” – Insurance Requirements
Attachment “E” – Affidavits
Attachment “F-1” – Sample Scoring Matrix
Attachment “F-2” – Vendor Scoring Matrix
Attachment “G” – Sample Corporate Resolution
Attachment “H” – Sample Certificate of Insurance
Version 2025.1
This page summarizes the opportunity, including an overview and a preview of the attached documents.