HVAC Duct and Diffuser Cleaning
| Agency: | Guam Visitors Bureau (GVB) |
|---|---|
| State: | Guam |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 31, 2026 |
| Due Date: | Aug 14, 2026 |
| Solicitation No: | GVB RFQ 2026-001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Scope of Work
- GVB RFQ HVAC Duct and Diffuser Cleaning
Type:
Other
Posted on:
July 31, 2026, 01:46 PM ChST (Guam time)
Type:
Other
Posted on:
July 31, 2026, 01:30 PM ChST (Guam time)
Professional HVAC duct and diffuser cleaning services at the Guam Visitors Bureau, to include detailing project prep, mechanical cleaning, and final verification - see attached Scope of Work for specifications. Site visit highly encouraged (Aug 4-7, 2026).
HVAC DUCT AND DIFFUSER CLEANING SERVICES
SCOPE OF WORK This Request for Quotation (RFQ) outlines the specifications for professional HVAC duct and diffuser cleaning services for approximately 40 units at the Guam Visitors Bureau, detailing project prep, mechanical cleaning, and final verification. Must be a member of the National Air Duct Cleaners Association (NADCA). A site visit is highly encouraged to ensure that a complete and responsible bid is offered. Provide all cost to include labor. Must be available for this service Monday ~ Friday from 8AM ~ 5PM or on weekends from 8AM ~ 5PM. Please contact Misty Iluches (671) 646-5278 x 517 to schedule. Deadline to submit your offer is at 12noon on FRIDAY, AUGUST 14, 2026. Project Overview & Preparation
-
System Shutdown: Turn off HVAC units safely before work begins. -
Area Protection: Cover nearby floors, furniture, and equipment with protective -
plastic sheeting. -
Negative Pressure: Connect HEPA vacuum units to capture dust and prevent room -
contamination. -
Access Openings: Cut or use existing access doors; seal tightly post-cleaning with -
code-compliant materials.
Mechanical Cleaning & Debris Extraction
-
Agitation: Use rotating soft brushes, air whips, or compressed air nozzles in ducts. -
Extraction: Pull loosened particles backward into the negative air machine. -
Dampers & Vents: Handle internal control dampers carefully and reset to fully open positions.
Grilles, Covers, and Diffusers
-
Removal: Take down supply and return covers, registers, and diffusers. -
Washing: Clean with safe solutions or degreasers, rinse completely, and dry. -
Reinstallation: Mount securely without damaging surrounding walls or ceilings
Containment and Air Quality Control
-
The Contractor shall isolate all active work areas using dust-tight plastic containment barriers. -
Negative air pressure machines equipped with certified HEPA filters must operate continuously during all dust-generating activities. -
The contractor must prevent any dust, debris, or mold spores from migrating into public or adjacent spaces.
Mold Remediation and Anti-Microbial Treatment
-
All mold remediation must strictly follow IICRC S520 standard guidelines. -
The Contractor shall clean all affected surfaces using EPA-registered anti-microbial treatments. -
These treatments must be applied according to the manufacturer's exact specifications to prevent future fungal growth.
Contractor Qualifications
-
Bidders must submit proof of valid mold remediation certifications with their proposal. -
Bidders must document at least three years of experience handling environmental hazards in commercial or public spaces.
Verification & Handover
- Visual Check: Inspect via flashlight/mirror or robotic camera to ensure zero visible dust.
- Final Report: Provide all service documentation (before-and-after logs) with invoice upon completion of work.
Attachment Preview
HVAC DUCT AND DIFFUSER CLEANING SERVICES
SCOPE OF WORK
ThisRequestforQuotation(RFQ)outlinesthespecificationsforprofessionalHVACduct and
diffusercleaningservices forapproximately 40unitsatthe GuamVisitorsBureau,detailing
projectprep,mechanicalcleaning, andfinalverification. Mustbea memberoftheNationalAir
DuctCleanersAssociation(NADCA).
Asitevisit ishighly encouragedtoensurethata completeandresponsiblebidis offered.
Provideallcosttoincludelabor.
Mustbeavailableforthisservice Monday~ Fridayfrom8AM~ 5PMor onweekendsfrom8AM
~5PM.
PleasecontactMistyIluches(671) 646-5278x517 to schedule.
Deadlinetosubmityour offer isat12noononFRIDAY,AUGUST14, 2026.
Project Overview & Preparation
System Shutdown: Turn off HVAC units safely before work begins.
Area Protection: Cover nearby floors, furniture, and equipment with protective
plastic sheeting.
Negative Pressure: Connect HEPA vacuum units to capture dust and prevent room
contamination.
Access Openings: Cut or use existing access doors; seal tightly post-cleaning with
code-compliant materials.
Mechanical Cleaning & Debris Extraction
Agitation: Use rotating soft brushes, air whips, or compressed air nozzles in ducts.
Extraction: Pull loosened particles backward into the negative air machine.
Dampers & Vents: Handle internal control dampers carefully and reset to fully
open positions.
Grilles, Covers, and Diffusers
Removal: Take down supply and return covers, registers, and diffusers.
Washing: Clean with safe solutions or degreasers, rinse completely, and dry.
Reinstallation: Mount securely without damaging surrounding walls or ceilings.
Containment andAir Quality Control
The Contractor shall isolate all active work areas using dust-tight plastic
containment barriers.
Negative air pressure machines equipped with certified HEPA filters must operate
continuously during all dust-generating activities.
The contractor must prevent any dust, debris, or mold spores from migrating into
public or adjacent spaces.
Mold Remediation andAnti-Microbial Treatment
All mold remediation must strictly follow IICRC S520 standard guidelines.
The Contractor shall clean all affected surfaces using EPA-registered anti-
microbial treatments.
These treatments must be applied according to the manufacturer's exact
specifications to prevent future fungal growth.
Contractor Qualifications
Bidders must submit proof of valid mold remediation certifications with their
proposal.
Bidders must document at least three years of experience handling
environmental hazards in commercial or public spaces.
Verification & Handover
Visual Check: Inspect via flashlight/mirror or robotic camera to ensure zero
visible dust.
Final Report: Provide all service documentation (before-and-after logs) with
invoice upon completion of work.
See Also
Bid/RFP Number Title/Description Date Issued Submission Deadline Status/Awarded SOLE SOURCE Semi-Annual Preventive Maintenance,
Guam Memorial Hospital (GMH)
Follow DRYDOCK: USCGC MYRTLE HAZARD DD FY27 Active Contract Opportunity Notice ID 70Z08026QPBPL0055
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/24/2026
Follow Crane Services for Gun Mount Removal/Install GUAM Active Contract Opportunity Notice ID
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/21/2026
Follow EQUIPMENT SUPPORT SERVICES (ESS) GUAM Active Contract Opportunity Notice ID N3943026R2008 Related
DEPT OF DEFENSE
Due by 9/22/2026