Hugh A. Wyckoff Generator Electrical Building VAC Replacement

Agency: Cobb County Marietta Water Authority
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Posted Date: Oct 31, 2025
Due Date: Dec 2, 2025
Solicitation No: HVAC103125
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Status: OPEN
Reference Number: HVAC103125
Title: Hugh A. Wyckoff Generator Electrical Building VAC Replacement
Release Date: 10/31/2025
Due Date: 12/2/2025

Hugh A. Wyckoff Generator Electrical Building VAC Replacement
Cobb County Marietta Water Authority, Georgia
Get on Interest List
Details
Interest List
Q&A
E-Bid
Changes
Open
Reference No.
HVAC103125
Due Date
December 2, 2025 at 2:0:0 PM EST
Conference Date
11/18/2025
Deadline for Questions
11/21/2025
Time Remaining
31 Days
Basic Info
Release Date
10/31/2025
Type
Invitation to Bid
Department(s)
Engineering
Categories
HVAC Maintenance, Repair, and Installation Service
Conduit/Flexible Pipes
Refrigerant
Additional Info
Additional Contact
Lance Buchanan
Additional Email
lbuchanan@ccmwa.org
Contact Info
Contact Name
Lisa Rodriguez
Email Address
procurement@ccmwa.org
Download Package
Attachments
Description

The Project consists of replacing the existing HVAC units with computer-room air-conditioning (CRAC) systems at the main switchgear and generator building located at Cobb County-Marietta Water Authority’s (CCMWA) Hugh. A Wyckoff Water Treatment Plant. This building houses the plant electrical switchgear and automatic transfer switches for the facility’s three emergency generators. The scope will include, but is not limited to, the following major elements:

·         Removing existing indoor and outdoor air conditioning units, associated refrigerant and condensate lines.

·         Removing and salvaging existing lineset covers for reinstallation.

·         Installing new indoor and outdoor air conditioning units as shown on the plans.

·         Installing new refrigerant lines and condensate lines in accordance with the existing routing.

·         Coating new refrigerant and condensate linesets with PVC-coated insulation.

·         Removing and replacing existing air handler and condenser circuits with new XHHW-2 wiring.

·         Removing and salvaging existing conduit for repulling with new XHHW-2 wiring.

·         Removing and replacing existing disconnect switches with 60A/3P disconnect switches, as shown on the plans.

·         Installing new I/O connections to integrate additional data points into the existing SCADA system.

Mandatory In Person Conference Date

Date: November 18, 2025 at 10:00 AM EST

A Mandatory Pre-Bid Conference will be held on Tuesday, November 18 at 10 AM at the Hugh A. Wyckoff Water Treatment Plant, 3728 Mars Hill Road, Acworth, GA 30101. Each bidder shall be limited to three personnel per organization.

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-63600-NONST-2026-000000095

State Government of Georgia

Bid Due: 7/09/2026

Follow EWAAC IDIQ FOPR_ MHU 196/204 A1 Power Control Unit Effort Active Contract

Federal Agency

Bid Due: 6/30/2026

Project: 2026021-BID3289 Emergency Back-up Generators Ref. #: 2026021-BID3289 Emergency Back-up Generators Type: ITB

Columbia County

Bid Due: 7/09/2026

Bid Number: 2026-03 Bid Title: Tifton GEMA Generator Project Category: City Administration Status:

City of Tifton

Bid Due: 6/26/2026