Hugh A. Wyckoff Generator Electrical Building HVAC Replacement
| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| Posted Date: | Oct 31, 2025 |
| Due Date: | Dec 2, 2025 |
| Solicitation No: | PE-66365-NONST-2026-000000027 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66365-NONST-2026-000000027 | Hugh A. Wyckoff Generator Electrical Building HVAC Replacement | Cobb County-Marietta Water Authority |
Oct 31, 2025 @ 10:49 AM
|
Dec 02, 2025 @ 02:00 PM
|
Start Date: Oct 31, 2025 @ 10:49 AM ET
End Date:
Dec 02, 2025 @ 02:00 PM ET
Description
The Project consists of replacing the existing HVAC units with computer-room air-conditioning (CRAC) systems at the main switchgear and generator building located at Cobb County-Marietta Water Authority's (CCMWA) Hugh. A Wyckoff Water Treatment Plant. This building houses the plant electrical switchgear and automatic transfer switches for the facility's three emergency generators. The scope will include, but is not limited to, the following major elements:
¿ Removing existing indoor and outdoor air conditioning units, associated refrigerant and condensate lines.
¿ Removing and salvaging existing lineset covers for reinstallation.
¿ Installing new indoor and outdoor air conditioning units as shown on the plans.
¿ Installing new refrigerant lines and condensate lines in accordance with the existing routing.
¿ Coating new refrigerant and condensate linesets with PVC-coated insulation.
¿ Removing and replacing existing air handler and condenser circuits with new XHHW-2 wiring.
¿ Removing and salvaging existing conduit for repulling with new XHHW-2 wiring.
¿ Removing and replacing existing disconnect switches with 60A/3P disconnect switches, as shown on the plans.
¿ Installing new I/O connections to integrate additional data points into the existing SCADA system.
| Code | Description |
| 03173 | Pumps, Refrigerant Circulating |
| 91017 | Energy Computerized Control System, HVAC, Lighting, Utilities, etc., Installation, Maintenance and R |
| 91450 | Heating, Ventilating and Air Conditioning (HVAC) |
Lisa Rodriguez
procurement@ccmwa.org
770-514-5300
See Also
Bid Number: 2026-1565-720 Bid Title: Morgan County Former Jail Demolition and Site Restoration
Morgan County
Due by 9/20/2026
Follow C-5 MLG Trunnion Bearing Active Contract Opportunity Notice ID FA8538260019 Related Notice
DEPT OF DEFENSE
Due by 10/27/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-64750-NONST-2027-000000213
State Government of Georgia
Due by 9/16/2026
Follow Fort Stewart Base Operations - W5168W26RA014 Active Contract Opportunity Notice ID W5168W26RA014
DEPT OF DEFENSE
Due by 9/28/2026