Hubert Water Treatment Plant Softener Tanks 1 & 2 Rehabilitation Project
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 14, 2025 |
| Due Date: | Aug 19, 2025 |
| Solicitation No: | 8062025HubSoft |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 8062025HubSoft |
| Project Title: | Hubert Water Treatment Plant Softener Tanks 1 & 2 Rehabilitation Project |
| Description: | The successful proposer (Contractor) shall furnish all permits, materials, equipment, and labor necessary to perform all tasks described in the Scope of Work, including: removing and disposing of existing media; performing a visual inspection of the tank, and repairing defective areas (including spot and patch welding) as needed; preparing and painting interior and exterior surfaces; pressure testing; replacement of brine inlet valve and electronic actuator; and, installing new gravel and media in a total of two (2) steel tank softener vessel. Work will be performed at ONWASA’s Hubert Water Treatment Plant, 374 Hubert Blvd, Hubert, NC 28539. Work is to begin within seven (7) calendar days from receipt of a Notice to Proceed, and all work on the project shall be completed, with the tank ready for service, within 30 calendar days from that date. |
| Opening Date: | 8/19/2025 2:00 PM |
| Posted Date: | 8/14/2025 |
| Status: | Open |
| Department: | ONSLOW WATER & SEWER AUTHORITY |
|
Solicitation Number
*
8062025HubSoft
|
Department
ONSLOW WATER & SEWER AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-08-19T14:00:00.0000000
|
Posted Date
*
2025-08-14T13:47:48.0000000Z
|
Commodity Code
Water and sewer utilities
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
The successful proposer (Contractor) shall furnish all permits, materials, equipment, and labor necessary to perform all tasks described in the Scope of Work, including: removing and disposing of existing media; performing a visual inspection of the tank, and repairing defective areas (including spot and patch welding) as needed; preparing and painting interior and exterior surfaces; pressure testing; replacement of brine inlet valve and electronic actuator; and, installing new gravel and media in a total of two (2) steel tank softener vessel. Work will be performed at ONWASA’s Hubert Water Treatment Plant, 374 Hubert Blvd, Hubert, NC 28539. Work is to begin within seven (7) calendar days from receipt of a Notice to Proceed, and all work on the project shall be completed, with the tank ready for service, within 30 calendar days from that date.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Solicitation Number: 63-DMP1213949 Project Title: Premium Pine Flake Shavings Description: Blanket Order for
State Government of North Carolina
Due by 11/18/2026
Bid Number Description Bid Deadlines Addenda 298-FY27-WTR-BID- WDWTPChemTanks Request for Formal Bids for
City of Asheville
Due by 12/10/2026
Request for Bids - Bulk Road Salt Closing date November 19, 2026, 11:00
Town of Chapel Hill
Due by 11/19/2026
Bid Number Description Bid Deadlines Addenda 298-FY27-PR-Bid-WeaverParkBallfieldImprovements Request for Bids for Weaver Park
City of Asheville
Due by 11/10/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.