Hubar Solar Dryer Repairs
| Agency: | City of Sanford |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 14, 2025 |
| Due Date: | Apr 24, 2025 |
| Solicitation No: | IFB 24/25-16 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
City of Sanford
City of Sanford
Status
Active
Active
Fiscal Year
2025
2025
Title
Hubar Solar Dryer Repairs
Hubar Solar Dryer Repairs
Type
Invitation to Bid
Invitation to Bid
Department
Public Works
Public Works
Online Submissions
No
No
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
No
No
Bid Bond Required
No
No
Bid Bond Amount
Performance Bond Required
No
No
Performance Bond Amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
A. General: The work to be done under this contract includes providing all equipment, materials, labor or
service as required to repair the existing Huber Solar Dryer SRT 11 so that operates as intended.
B. This work includes:
1. Furnishing all labor, material, tools, equipment, supplies, services, and other means of
construction necessary to repair the existing Huber Solar Dryer SRT 11. Details are listed below.
a. Replacing the rotating shovel assembly
i. Huber part 51433635 paddle D1100 D355 L11280 Solstice 11
ii. All sprockets, bearings, and chains
b. IGUS energy chain inspection performed by the supplier
c. Overall inspection of plant equipment related to the dryer by Huber factory-trained
technicians
2. Sole responsibility for the adequacy of plant and equipment
3. Maintaining the work area and site in a clean and acceptable manner
4. Maintaining existing facilities in service at all times
5. Protection of finished, unfinished work, and existing facilities
6. Repair and restoration of work or existing facilities damaged during construction
7. Furnishing as necessary proper equipment and machinery to facilitate the work
C. Implied and Normally Required Work
1. It is the intent of these specifications to provide the city with the complete operable solar drying
capabilities. Any part or item of work, which is reasonably implied or normally required to make the
installation satisfactorily and completely operable, is deemed to be included in the work and contract
amount. All miscellaneous appurtenances and other items of work incidental to meeting the intent of
the contract documents are included in the work and the work and contract amount even though
these appurtenances may not be specifically called for in these documents.
D. Quality of Work
1. Regarding the apparent silences of the contract documents as to any detail, or the apparent omission
from them of a detailed description concerning any work to be done and materials to be furnished as
meaning that only the best general practice is to prevail and that only materials and workmanship of
the best quality are to be used. Interpretation of these specifications will be made upon this basis.
A. General: The work to be done under this contract includes providing all equipment, materials, labor or
service as required to repair the existing Huber Solar Dryer SRT 11 so that operates as intended.
B. This work includes:
1. Furnishing all labor, material, tools, equipment, supplies, services, and other means of
construction necessary to repair the existing Huber Solar Dryer SRT 11. Details are listed below.
a. Replacing the rotating shovel assembly
i. Huber part 51433635 paddle D1100 D355 L11280 Solstice 11
ii. All sprockets, bearings, and chains
b. IGUS energy chain inspection performed by the supplier
c. Overall inspection of plant equipment related to the dryer by Huber factory-trained
technicians
2. Sole responsibility for the adequacy of plant and equipment
3. Maintaining the work area and site in a clean and acceptable manner
4. Maintaining existing facilities in service at all times
5. Protection of finished, unfinished work, and existing facilities
6. Repair and restoration of work or existing facilities damaged during construction
7. Furnishing as necessary proper equipment and machinery to facilitate the work
C. Implied and Normally Required Work
1. It is the intent of these specifications to provide the city with the complete operable solar drying
capabilities. Any part or item of work, which is reasonably implied or normally required to make the
installation satisfactorily and completely operable, is deemed to be included in the work and contract
amount. All miscellaneous appurtenances and other items of work incidental to meeting the intent of
the contract documents are included in the work and the work and contract amount even though
these appurtenances may not be specifically called for in these documents.
D. Quality of Work
1. Regarding the apparent silences of the contract documents as to any detail, or the apparent omission
from them of a detailed description concerning any work to be done and materials to be furnished as
meaning that only the best general practice is to prevail and that only materials and workmanship of
the best quality are to be used. Interpretation of these specifications will be made upon this basis.
Dates(All times are listed as
EST
)
Broadcast Date
3/27/2025 8:00 AM EST
3/27/2025 8:00 AM EST
Question End Date
4/17/2025 2:00 PM EST
4/17/2025 2:00 PM EST
Due Date
4/24/2025 2:00 PM EST
4/24/2025 2:00 PM EST
Bid Opening Date
Pre-Bid Conferences
Total: 0
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
Documents
Questions & Answers
Total: 0
| Question | Date Asked | Answer | Date Answered |
Commodity Codes
Total: 1
| Code | Description |
| [890-77] | Waste Water Reclamation Systems And Parts |
Publications
Total: 0
| Publication | Date |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow CNRSE Port Operations Support Services Active Contract Opportunity Notice ID N6883626R0002 Related
DEPT OF DEFENSE
Due by 9/18/2026
General Information Document Type: Modification to a Previous Notice Solicitation Number: M6700408T0028 Posted
Federal Agency
Due by 7/12/2031
Advertisement Detail Department of Transportation Agency Decisions ADDENDUM NO. 1 ITB-DOT-10-11-5011-DD A1 Advertisement
State Government of Florida
Due by 10/11/2050
Advertisement Detail Department of Transportation Public Meeting Notice MAINTENANCE AND REPAIR OF FDOT
State Government of Florida
Due by 11/12/2040
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.