High Pressure Line Cap - Cross Street
| Agency: | State Government of Vermont |
|---|---|
| State: | Vermont |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 22, 2026 |
| Due Date: | May 13, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
|
Bid Type: Request for Proposal Locations: Essex Keywords: Plumbing and Heating, Construction (Non Building), Water Treatment, General Contractor Bid Description: The Town of Brighton is soliciting bids from qualified contractors with high pressure lines. The purpose of this project is to ensure the safe closure of a line to prevent future flooding. Project Background There is an abandoned lead service line connected with a gooseneck to the watermain. This froze and ruptured in January of 2025, resulting in flooding of the immediate vicinity on Cross Street. The line has a temporary cap which was placed in the spring of 2025. The line requires removal from the main line. Possible challenges of project to include: Identifying if goose neck is lead soldered or threaded; possibility of gate valve closure failure and expanded contamination of main line. Scope of Work • Coordination with Digsafe • Location and mapping of existing utilities in the project area • Contractor must be familiar with high risk, tight digs, and preferably have experience with jetting capabilities. • Must use certified flagging company during any work within the roadway • Coordination with Vermont Electric Coop to stabilize a utility pole adjacent to project area • Coordination with H2O innovation for water shut off and relieve pressure from system • Removal of abandoned pipe off mainline • Perform all pressure testing and backfill of area to ensure stabilization and future integrity of line • Coordinate line flushing and boil water notice with businesses, operators, and board. • Complete cleanup and site preparation for concrete, topsoil, seed and hay. • Be sure to advise H2O Innovation when water quality testing is needed • Use of Trench Box is required at the dig site Cleanup and Final Inspection • Remove all equipment, debris, and materials from the site. • Prepare area for reseeding of grass or cement work as needed • Conduct a final inspection with the Town of Brighton representative and H2O Innovation Special Considerations Project must be completed by July 1 or started after July 6 due to July 4th celebration planned in the park
|
||||||||||||||||||||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Commercial Emergency Flares Request Date: 12/17/2018 3:09:57 PM Open Date: Closing Date: 12/28/2028
State Government of Vermont
Due by 12/28/2028
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.