| Question | Date Asked | Answer | Date Answered |
|
1. Website shows no bid bond, but the specs states a 5% bond- please confirm.
2. Please confirm bid is due in person at 300 N. Park Avenue STE 236 Sanford, FL 32771? |
12/17/2025 6:32:35 AM | You are correct tere is a bid bond required. Address is also correct. Addendum #1 has been uploaded. | 12/17/2025 4:35:35 PM |
| The specifications indicate that the contractor shall furnish and install a vertical turbine pump assembly and appurtenances. It seems the specifications are missing the information related to this work. Please provide drawings as well. | 12/19/2025 12:39:36 PM | Awaiting response from the user department. | 1/12/2026 3:25:24 PM |
|
1. 00010-2 Division 11 Equipment. Section 11213
Vertical Turbine Pump. There is no section in the Specifications. Can You please provide this? 2. Can a site visit be set up? 3. Is water Available onsite for construction Use? Is there a cost? 4. Specifications state the bid is Lump Sum, but also states will be paid per quantities used. Is it Lump Sum, or Quantity? |
12/23/2025 11:04:29 AM | Awaiting response from the user department. | 1/12/2026 3:25:32 PM |
| Section 02444 Cain Link Fence And Gate. The specifications do not give gate dimensions. it states as shown on figure-2 but there is no figure-2. Can you please provide drawing for gate? | 12/23/2025 11:44:55 AM | Awaiting response from the user department. | 1/12/2026 3:25:40 PM |
|
the newest addendum states " DUE DATE
This Addendum does not change the solicitation due date. As such, the solicitation response is due no later than January 8, 2026 at 2:00PM Local Time." This is very misleading - is the solicitation response now due for January 8th? Or will it remain January 15th?? |
1/6/2026 10:01:03 AM | We apologize for the confusion. The due date is January 15, 2026 @ 2:00pm Local Time. | 1/6/2026 1:51:32 PM |
| There is no figure-2 to show us the chain link fence as requested? | 1/6/2026 10:02:20 AM | Awaiting response from the user department. | 1/12/2026 3:26:00 PM |
| There are no vertical turbine pump assembly and appurtenances specification? Although it requests it and is not specified? | 1/6/2026 10:03:24 AM | Awaiting response from the user department. | 1/12/2026 3:26:08 PM |
| There does not appear to be any answers to any questions dating back to 12/19, we request the question deadline be extended as well as the bid solicitation due date be extended as well. | 1/6/2026 10:04:33 AM | Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time. | 1/6/2026 2:08:44 PM |
| On 1/06 the City answered: "Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time." but what if there are questions that arise after the answers are given? If there`s added specification regarding that turbine pump being requested and added drawings on the gate (which both were not initially included), then there may be further questions needed answered - unless it is the city`s intent to remove those conditions. | 1/8/2026 11:33:09 AM | Please note... Addendum #3 has been updated to with extension. | 1/12/2026 3:25:00 PM |
|
Can you please clarify the sampling 02522-18 3.12
states which samples are to be field and lad, however the last set does not state, can we assume the TDS, bicarbonate, calcium, sulfide, total alkalinity, total hardness, TOC, and dissolved Organic Carbon are lab only? |
1/15/2026 2:30:09 PM | ||
| Will contractor be required to re-sod all disturbed areas? | 1/15/2026 2:35:11 PM | ||
| the specifications states to plan up to 1000-feet of discharge hose. Can the Owner tell Contractor, where it was planned to discharge too from well site? also will the route require crossing roadways, sidewalks etc. | 1/15/2026 2:37:15 PM | ||
| Can the owner give an exact location of replacement 10R in Park? | 1/15/2026 2:41:12 PM | ||
| Will the owner trim trees if required to bring in drilling equipment? | 1/15/2026 2:41:39 PM | ||
| The specifications do not state working days and times. This site is located in a residential area, and Gated City Park. Please provide working days and hours | 1/15/2026 4:45:27 PM | ||
| Will bidders receive answers to all of the questions? | 1/15/2026 4:46:05 PM | ||
| Is a fence required around construction area, also where can Contractor stage material and equipment | 1/15/2026 5:23:57 PM | ||
| When can we expect the answers to all the questions? | 1/20/2026 7:26:43 AM | We are still awaiting the user department's response. Please allow 3 business days for follow up. | 1/22/2026 2:29:19 PM |
| Code | Description |
| [890-89] | Well Pointing Systems, Accessories and Parts |
| [962-96] | Well Services (Including Oil, Gas, and Water): Drilling, Plugging, Consulting, Maintenance, Repair, etc. |
| [967-92] | Well Equipment and Supply Manufacturing Services (Oil, Gas, Water, etc.) |
| [968-93] | Well Pointing Services (Dewatering) |
| [210-29] | Culverts, Corrugated Metal (Incl. Well Casing Pipe) |
| [545-96] | Water Well Drilling Equipment |
| [720-84] | Water Well Accessories: Drive Points, Foot Valves and Strainers, Leather Cups, Sucker Rods, Well Cylinders, etc. |
| [962-92] | Video Scanning of Sewers, Water Wells, etc. |
| [981-84] | Water and Sewer Equipment (Including Well Pointing Equipment) Rental or Lease |
| Publication | Date |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
ITB No. 26-05 Lakes by the Bay Parking Lot and Walkway Retrofit Project
Cutler Bay town
Bid Due: 6/25/2026
Description: Belle Glade Water Main Improvements-SE Zone 6 Water System Department: Water Utilities
Palm Beach County
Bid Due: 1/23/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 7/06/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 8/14/2030