Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
| Agency: | City of Sanford |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 8, 2026 |
| Due Date: | Jan 29, 2026 |
| Solicitation No: | IFB 25/26-02 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
City of Sanford
City of Sanford
Status
Active
Active
Fiscal Year
2026
2026
Title
Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
Number
IFB 25/26-02
IFB 25/26-02
Type
Invitation to Bid
Invitation to Bid
Department
Utilities-Plants
Utilities-Plants
Online Submissions
No
No
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
No
No
Bid Bond Required
Yes
Yes
Bid Bond Amount
5%
5%
Performance Bond Required
No
No
Performance Bond Amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
The replacement water supply well will be located at the former site of the Hidden Lakes wellfield well 10 in Lee P. Moore Park at 106 Sweet Bay Drive in Sanford.
The replacement water supply well will be located at the former site of the Hidden Lakes wellfield well 10 in Lee P. Moore Park at 106 Sweet Bay Drive in Sanford.
Dates(All times are listed as
EST
)
Broadcast Date
12/16/2025 4:00 PM EST
12/16/2025 4:00 PM EST
Question End Date
1/22/2026 4:00 PM EST
1/22/2026 4:00 PM EST
Due Date
1/29/2026 2:00 PM EST
1/29/2026 2:00 PM EST
Bid Opening Date
Pre-Bid Meetings
Total: 0
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
| Date | Time | Location |
Documents
Total: 6
Questions & Answers
Total: 9
| Question | Date Asked | Answer | Date Answered |
|
1. Website shows no bid bond, but the specs states a 5% bond- please confirm.
2. Please confirm bid is due in person at 300 N. Park Avenue STE 236 Sanford, FL 32771? |
12/17/2025 6:32:35 AM | You are correct tere is a bid bond required. Address is also correct. Addendum #1 has been uploaded. | 12/17/2025 4:35:35 PM |
| The specifications indicate that the contractor shall furnish and install a vertical turbine pump assembly and appurtenances. It seems the specifications are missing the information related to this work. Please provide drawings as well. | 12/19/2025 12:39:36 PM | ||
|
1. 00010-2 Division 11 Equipment. Section 11213
Vertical Turbine Pump. There is no section in the Specifications. Can You please provide this? 2. Can a site visit be set up? 3. Is water Available onsite for construction Use? Is there a cost? 4. Specifications state the bid is Lump Sum, but also states will be paid per quantities used. Is it Lump Sum, or Quantity? |
12/23/2025 11:04:29 AM | ||
| Section 02444 Cain Link Fence And Gate. The specifications do not give gate dimensions. it states as shown on figure-2 but there is no figure-2. Can you please provide drawing for gate? | 12/23/2025 11:44:55 AM | ||
|
the newest addendum states " DUE DATE
This Addendum does not change the solicitation due date. As such, the solicitation response is due no later than January 8, 2026 at 2:00PM Local Time." This is very misleading - is the solicitation response now due for January 8th? Or will it remain January 15th?? |
1/6/2026 10:01:03 AM | We apologize for the confusion. The due date is January 15, 2026 @ 2:00pm Local Time. | 1/6/2026 1:51:32 PM |
| There is no figure-2 to show us the chain link fence as requested? | 1/6/2026 10:02:20 AM | ||
| There are no vertical turbine pump assembly and appurtenances specification? Although it requests it and is not specified? | 1/6/2026 10:03:24 AM | ||
| There does not appear to be any answers to any questions dating back to 12/19, we request the question deadline be extended as well as the bid solicitation due date be extended as well. | 1/6/2026 10:04:33 AM | Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time. | 1/6/2026 2:08:44 PM |
| On 1/06 the City answered: "Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time." but what if there are questions that arise after the answers are given? If there`s added specification regarding that turbine pump being requested and added drawings on the gate (which both were not initially included), then there may be further questions needed answered - unless it is the city`s intent to remove those conditions. | 1/8/2026 11:33:09 AM |
Commodity Codes
Total: 9
| Code | Description |
| [890-89] | Well Pointing Systems, Accessories and Parts |
| [962-96] | Well Services (Including Oil, Gas, and Water): Drilling, Plugging, Consulting, Maintenance, Repair, etc. |
| [967-92] | Well Equipment and Supply Manufacturing Services (Oil, Gas, Water, etc.) |
| [968-93] | Well Pointing Services (Dewatering) |
| [210-29] | Culverts, Corrugated Metal (Incl. Well Casing Pipe) |
| [545-96] | Water Well Drilling Equipment |
| [720-84] | Water Well Accessories: Drive Points, Foot Valves and Strainers, Leather Cups, Sucker Rods, Well Cylinders, etc. |
| [962-92] | Video Scanning of Sewers, Water Wells, etc. |
| [981-84] | Water and Sewer Equipment (Including Well Pointing Equipment) Rental or Lease |
Publications
Total: 0
| Publication | Date |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Advertisement Detail Department of Transportation Agency Decisions PALM BEACH AND NORTHERN 3 COUNTIES(NC3)
State Government of Florida
Due by 10/11/2040
Advertisement Detail Department of Transportation Single Source Reedy Creek Improvement District Advertisement Number:
State Government of Florida
Due by 11/12/2050
Solicitation # Project Title Due Date #010-26 Sardinia Drive Lift Station #32 Emergency
City of Eustis
Due by 9/11/2026
Project ID: PSUT-26-06 Title: Phase 2 Polk Building Renovations Addenda: 0 Release Date:
City of Pembroke Pines
Due by 9/08/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.