Heating, Ventilation and Air Conditioning (HVAC) Replacements at Elati, Mariposa, and Security Command Center Locations (15% SBE Goal)
| Agency: | Regional Transportation District - Denver |
|---|---|
| State: | Colorado |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 5, 2025 |
| Due Date: | Apr 2, 2025 |
| Solicitation No: | IFB 325DH003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: IFB 325DH003
Title: Heating, Ventilation and Air Conditioning (HVAC) Replacements at Elati, Mariposa, and Security Command Center Locations (15% SBE Goal)
Addenda: 2
Release Date: 2/7/2025
Due Date: 4/2/2025
The purpose of this contract is to remove and replace existing HVAC equipment that has reached their end-of-life cycle at RTD’s Elati, Mariposa, and Security Command Center locations. We will be replacing three Make-up Air units, one chiller, and one boiler at Elati Light Rail Facility (LRF), upgrading the computer room cooling at Mariposa LRF and replacing two rooftop heating cooling units at Security Command Center.
We will meet at RTD's Mariposa Light Rail Facility, 605 Mariposa Street, Denver to check out Mariposa and the Security Command Center. That is where we will do the safety minute and talk about project generalities.
Then RTD staff and bidders will proceed to Elati Light Rail Facility at 2701 South Elati Street, Englewood. The Elati work is more complicated and will take longer to see than the first two.
Google maps says Elati is 6 miles and 15 minutes from Mariposa, if I-25 is moving and no one gets lost.
When you visit these sites, you will need a high visibility vest. Sturdy shoes are required. They do not need to be safety-toe shoes.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2VhMjUxMjktNjQxZS00NjZiLTgzZjMtOWIyNDAxY2YzMDA5%40thread.v2/0?context=%7b%22Tid%22%3a%2205182089-2b8a-4c82-864b-aa265b61fa57%22%2c%22Oid%22%3a%228b642bff-809d-424c-8ebb-dbe8bf7bc1c6%22%7d
See Also
Removal and Installation of Cambridge M118 Air Unit at Clarifier Building at Persigo
City of Grand Junction
Due by 10/01/2026
Due Date Number Title Department 10/29/2026 2:00 pm BID-313-26 Boulder County HVAC Air
Boulder County
Due by 10/29/2026
Removal and Installation of Cambridge M118 Air Unit at Clarifier Building at Persigo
City of Grand Junction
Due by 10/01/2026
2026 Contract Street Maintenance Mill and Overlays IFB-5976-26-DD Responses Due September 21, 2026,
City of Grand Junction
Due by 9/21/2026