HATS Fence Final

Agency: Hoke County
State: North Carolina
Type of Government: State & Local
Posted Date: May 7, 2026
Due Date: May 22, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: HATS Fence Final
Category: County Manager
Status: Open
Description:

Construction Services for HOKE AREA TRANSIT SYSTEM (HATS) PARKING AREA PAVEMENT, FENCE, & LANDSCAPING

Publication Date/Time:
5/6/2026 12:00 am
Closing Date/Time:
5/22/2026 10:00 am
Related Documents:

Attachment Preview

HOKE COUNTY, NC
Statement of Qualifications (Two-Part Process)
Construction Services
for
HOKE AREA TRANSIT SYSTEM (HATS)
PARKING AREA PAVEMENT, FENCE, & LANDSCAPING
1. Overview
Hoke County hereby request “Statements of Qualifications and Proposal” for construction for a
new parking area to adjoin an existing parking area located at 189 CC Steele Rd., Raeford, NC
28376. The project scope consists of parking lot design, land clearing & grading, construction,
paving, fencing and landscaping to match the existing finish of the building. This also includes
ensuring that appropriate design for grading is done to ensure adequate drainage. The
approximate size of the parking lot is 20,000 square feet. This project will include the installation
of fencing, gates, and extension of existing sidewalks to service the new parking lot.
This project will follow a two-part procurement process:
1. Part 1 – Qualifications: Submission of Statements of Qualifications to demonstrate the
vendor’s experience, capacity, and capability.
2. Part 2 – Proposal/Pricing: Only vendors deemed qualified in Part 1 will be invited to
submit detailed price proposals.
Issue Date: May 06, 2026
Submission Deadline: 5:00 PM (EST) May 22, 2026
Contact Information:
Charles “Andrew” Jacobs II
cjacobs@hokecounty.org
Mailing Address: 227 N. Main St. Raeford, NC 28376
Attention: Charles “Andrew” Jacobs II
2. Project Scope
The project scope includes:
Parking lot design, including grading, drainage, and compliance with:
o NCGS Chapter 143 – Public Contracts and Property
o NCAC Title 15A, Subchapter 2D – Erosion and Sedimentation Control
o ADA Standards for Accessible Design (2010) for sidewalks, curb cuts, and
parking spaces
Land clearing, grading, and site preparation per NCAC 02H .1000 Environmental
Quality: Sedimentation Control
Construction and paving of approximately 20,000 square feet of parking area, following:
o Local Hoke County building and zoning codes
Installation of fencing and gates per local zoning regulations
Extension of existing sidewalks to serve the new parking lot, fully compliant with ADA
requirements
Landscaping to match existing building finishes and comply with NCDEQ stormwater
requirements
Ensuring grading and drainage comply with:
o NCDEQ Sedimentation and Erosion Control (15A NCAC 04B .0100–.0300)
o Hoke County stormwater management regulations
Note: Bonding is not required for this project due to the total estimated cost being under
$250,000, per NCGS §44A-26. Vendors are not expected to submit bonds.
3. Part 1 – Statement of Qualifications (SOQ)
3.1 Submission Requirements
Vendors must submit a Statement of Qualifications including:
1. Company Information: Name, address, contact person, phone, email.
2. Experience: Relevant projects completed within the last five (5) years. Include size,
scope, and compliance with NC regulations.
3. Project Team: Key personnel, qualifications, roles, and NC licensure.
4. Licensing & Certifications:
o NC Licensed General Contractor or Specialty Contractor
o Insurance coverage, including general liability and workers’ compensation
o Relevant safety, environmental, or ADA compliance certifications
5. References: Minimum of three (3) project references with contact information,
highlighting regulatory compliance outcomes.
3.2 Evaluation Criteria
SOQs will be evaluated based on:
Experience with parking lot construction, grading, drainage, and NC code compliance
Qualifications of key personnel
References and regulatory compliance history
Capacity to perform the work within timelines
Clarity and completeness of SOQ
***Only firms deemed qualified will be invited to submit Part 2 – Pricing Proposal.***
4. Part 2 – Proposal / Pricing
Vendors invited to Part 2 must submit:
1. Detailed cost proposal, including:
o Site preparation, grading, and paving
o Fencing and gates
o Sidewalk extension (ADA compliant)
o Landscaping
o Contingencies for unforeseen conditions
2. Project schedule, identifying milestones and regulatory inspection points
3. Warranty/guarantee information for workmanship and materials
Pricing will be evaluated based on completeness, cost reasonableness, and alignment with project
scope and regulatory compliance.
5. Submission Instructions
SOQ Deadline: June 1, 2026
Delivery Method: cjacobs@hokecounty.org
Part 2 Proposal Deadline: Provided only to qualified vendors
Label Submissions: “Hoke County Parking Area Construction – SOQ / Proposal”
6. Regulatory Compliance Checklist
Requirement
Vendor
Confirmation Notes/Details
(Yes/No)
NC Licensed General Contractor
License number
Liability & Workers’
Compensation Insurance
Attach certificate
ADA Compliance
Sidewalks, curb cuts, accessible spaces
Grading & Drainage Plan
Attach plan
Sedimentation & Erosion Control
Plan
Include plan
Sidewalks Extension
Specify compliance
Fencing & Gates
Type & location
Landscaping & Environmental
Compliance
Attach planting plan
References for Similar Projects
Include at least 3 references
Safety Protocols & Compliance
History
Include safety record
7. Evaluation Rubric – Part 1: SOQ (100 points)
Category
Criteria
Points
Experience & Past
Performance
Relevant completed projects with regulatory
compliance
25
Key Personnel &
Qualifications
Licensure, certifications, roles
20
Regulatory Compliance
Adherence to NCGS, NCAC, ADA, DEQ, local codes 20
References
Quality & relevance, compliance evidence
15
Capacity & Resources
Equipment, staffing, schedule management
10
Clarity & Completeness
Checklist completed accurately
10
Minimum Qualification Score: 70 points to advance to Part 2.
8. Evaluation Rubric – Part 2: Pricing Proposal (100 points)
Category
Criteria
Cost Competitiveness
Total cost vs. scope
Project Schedule & Milestones Realistic, achievable schedule
Regulatory Compliance
Assurance
Continued adherence to NCGS, NCAC, ADA, DEQ,
local codes
Quality & Materials
Durability & workmanship
Contingency Planning
Provisions for unforeseen conditions
Points
40
20
15
15
10
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation Number: Doc2342035045 Project Title: Pasta Items Description: Pasta Items Opening Date: 8/18/2026

State Government of North Carolina

Bid Due: 8/18/2026

Solicitation Number: SCO-24-28704-01A-1 Project Title: North Carolina Department of Adult Correction-RE-BID Description: RE-BID

State Government of North Carolina

Bid Due: 8/06/2026

Solicitation Number: 274-HCD-FY26-18 Project Title: Hillsborough-Western Redevelopment Description: Hillsborough-Western Redevelopment: The redevelopment site

State Government of North Carolina

Bid Due: 8/07/2026

Bid Title: Bid 16-040126 Sludge Thickening Polymer Category: Bid Tabulations Status: Open Description:

City of High Point

Bid Due: 8/30/2026