Hartsell Avenue Trail from Sikes Boulevard (SR 563) to Lake Beulah Drive
| Agency: | City of Lakeland |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 21, 2026 |
| Due Date: | May 21, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Hartsell Avenue Trail from Sikes Boulevard (SR 563) to Lake Beulah Drive
Addenda: 0
Release Date: 4/21/2026
Due Date: 5/21/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
THE SERVICES OF A STATE OF FLORIDA REGISTERED CONTRACTOR TO PROVIDE ALL REQUIRED MATERIALS, TOOLS, PERMITS, EQUIPMENT, TRAFFIC CONTROL, LABOR AND SUPERVISION FOR THE CONSTRUCTION OF THE HARTSELL AVENUE TRAIL FROM SIKES BOULEVARD (SR 563) TO LAKE BEULAH DRIVE. THE CONTRACTOR SHALL BE PRE-QUALIFIED BY THE FLORIDA DEPARTMENT OF TRANSPORTATION IN THE FOLLOWING WORKGROUPS: (10) FLEXIBLE PAVING, (28) PAVEMENT MARKING, (38) ROADWAY SIGNING, AND (40) SIDEWALK AND OTHER WORK CLASSES.
THESE IMPROVEMENTS FOR THIS PROJECT ARE AS SHOWN IN THE DRAWINGS PREPARED BY THE CITY OF LAKELAND PUBLIC WORKS ENGINEERING DEPARTMENT (FPID: 453405-1-58-01 AND CITY OF LAKELAND PROJECT NO. 008624) AND GENERALLY CONSISTS OF CONSTRUCTION OF A 10-FOOT WIDE SHARED-USE PATH ALONG THE EAST SIDE OF HARTSELL AVENUE FROM SIKES BOULEVARD (SR 563) TO LAKE BEULAH DRIVE. THE PROJECT INCLUDES MILLING AND RESURFACING OF THE EXISTING PAVEMENT, CURB WORK, EARTHWORK, BASE WORK, SIGNING & MARKING AND LIGHTING IMPROVEMENTS. THE PROJECT ALSO PROPOSES TO UPGRADE THE EXISTING CURB RAMPS WITHING THE TRAIL ALIGNMENT AND WILL CONSTRUCT A NEW BOARDING AND ALIGHTING AREA FOR A TRANSIT STOP AT THE INTERSECTION OF SIKES BOULEVARD (SR 563) AND HARTSELL AVENUE.
THE SUBMITTALS RECEIVED AND THE CONTRACT, IF AWARDED, SHALL BE IN COMPLETE ACCORDANCE WITH THIS INVITATION TO BID AND THE PROJECT PLANS AND SPECIFICATIONS, AS PREPARED BY THE CITY OF LAKELAND PUBLIC WORKS ENGINEERING DEPARTMENT FOR THE CITY OF LAKELAND AND THE FLORIDA DEPARTMENT OF TRANSPORTATION, WITHOUT LIMITATION, AND ALL CODES, REQUIREMENTS, AND REGULATIONS REFERENCED THEREIN. IN ADDITION, FEDERAL AND STATE FUNDING IS BEING UTILIZED UNDER A LOCAL AGENCY AGREEMENT AND WILL BECOME PART OF THE REQUIREMENTS.
Timeline
1140 East Parker Street, 2nd floor
Lakeland, FL 33801
**Please RSVP in OpenGov if you plan to attend**
See Also
Advertisement Detail Department of Transportation Agency Decisions PALM BEACH AND NORTHERN 3 COUNTIES(NC3)
State Government of Florida
Due by 10/11/2040
Advertisement Detail Department of Transportation Single Source Reedy Creek Improvement District Advertisement Number:
State Government of Florida
Due by 11/12/2050
Solicitation # Project Title Due Date #010-26 Sardinia Drive Lift Station #32 Emergency
City of Eustis
Due by 9/11/2026
Project ID: PSUT-26-06 Title: Phase 2 Polk Building Renovations Addenda: 0 Release Date:
City of Pembroke Pines
Due by 9/08/2026