Hartford South Main Street Utility and Roadway Improvements Project

Agency: State Government of Vermont
State: Vermont
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
Posted Date: Mar 13, 2020
Due Date: Apr 13, 2020
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Hartford South Main Street Utility and Roadway Improvements Project Request Date: 3/13/2020 8:57:40 AM
Open Date:
Closing Date: 4/13/2020 1:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:

Town of Hartford

171 Bridge Street
White River Junction , VT 05001

Bid Type:
Job Contract

Locations:

Keywords:
Construction (Non Building)

Bid Description:
Separate sealed BIDS for the construction of the Hartford South Main Street Utility and Roadway Improvements project, will be received by the Town of Hartford, VT. The project consists of the following: the installation of approximately 1,885 linear feet of new 12” ductile iron waterline and appurtenances; cured-in-place pipe lining of approximately 1,800 linear feet of 18”, 15”, and 12” sewerline; rehabilitation of approximately 5 separate sewer structures and construction of approximately 3 new manhole structures; rehabilitation of approximately 6 existing stormdrain structures and construction of approximately 25 new stormdrain structures and associated drain pipe; miscellaneous repairs to various stormwater collection system components; rehabilitation and select replacement of the existing T-Stem precast concrete retaining wall, and full-width roadway reconstruction and select sidewalk and curb replacement. The BIDS shall be received by the Town of Hartford, Town Manager Office, 171 Bridge Street, White River Junction, VT 05001, until 1:00 PM, April 13, 2020 and then at said office publicly opened and read aloud. If BIDS are forwarded by mail, the sealed envelope containing BID must be enclosed in another envelope containing the BID addressed to the Town of Hartford, Town Manager Office, 171 Bridge Street, White River Junction, VT 05001. A pre-bid meeting is scheduled at the Town of Hartford, Town Offices, 171 Bridge Street, White River Junction, VT 05001 on 10:30 AM, March 24, 2020. All prospective bidders are encouraged to attend this meeting. Each BID must be accompanied by a certified check payable to the OWNER for five percent (5%) of the total amount of the BID. A BID bond may be used in lieu of a certified check. Bidders are reminded that “Disadvantaged Business Enterprise” (DBE) program requirements apply to this WORK. The CONTRACT DOCUMENTS may be examined at the following locations: 1. Town of Hartford, Hartford Public Works, 173 Airport Road, White River Junction, VT 05001. 2. Aldrich + Elliott, PC, 6 Market Place, Ste. 2, Essex Jct., VT 05452. 3. AEengineers.com/current-bid-documents/ 4. AGC of VT Plan Room, c/o Works In Progress, 20 Farrell Street, Suite 103, So. Burlington, VT 05403. Copies of the CONTRACT DOCUMENTS may be obtained at the office of Blue Prints Etc. located at 20 Farrell Street, South Burlington, VT 05403, upon a non-refundable payment of $200.00 for each set. Shipping and tax are not included in this price. Alternatively, Bidding Documents are available on compact disc (as portable document format (PDF) files) for a non-refundable charge of $130.00. Shipping and tax are not included in this price. Checks shall be payable to Blue Prints Etc. Any CONTRACT or CONTRACTS awarded under this Invitation for BIDS are expected to be funded by a grant from the U.S. Environmental Protection Agency. Neither the United States nor any of its departments, agencies or employees is or will be a part to the Invitation for BIDS or any resulting contract. This procurement will be subject to regulations contained in 40 CFR, Part 31. A Performance BOND and a Payment BOND each in an amount equal to one hundred percent (100%) of the contract price will be required. (40 CFR §31.36(h)). “AIS (American Iron and Steel)” provisions of P.L. 113-76, Consolidated Appropriations Act of 2014, and all subsequent revisions and/or amendments including but not limited to the Water Resources Reform and Development Act (Clean Water Act §608), P.L. 113-25, Consolidated and Further Continuing Appropriations Act 2015, and P.L. 114-113, Consolidated Appropriations Act 2016 APPLY to this Contract. Bidders should refer to the Information for Bidders and the Supplemental General Conditions for these specific requirements. Federal Wage Rates under the Davis-Bacon Act (40 CFR §31.36(i)(5)) DO APPLY to this contract. Bidders should refer to the Information for Bidders and the Supplemental General Conditions for these specific requirements. “AIS (American Iron and Steel)” provisions DO APPLY. Current DBE Fair Share Objective/Goal: The United States Environmental Protection Agency (EPA) Region 1 and State of Vermont Department of Environmental Conservation (VTDEC) have negotiated and agreed that the blend fair share objectives/goal for construction, services, equipment, and supplies would be 1.18% Minority Business Enterprises (MBE) and 3.66% Woman Business Enterprises (WBE). Bidders must demonstrate an Affirmative Procurement Procedure for obtaining DBE participation. March 13, 2020 Brandon Godfrey Town Manager Town of Hartford
Special Instructions:
Contact Information:
Jason Booth
Phone: 8797733
Fax:
Email: jbooth@aeengineers.com
For additional information:
Bid Attachments:
Site Visit: Date:

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Title: Municipal Pool Project Category: Parks & Recreation Status: Open Description: BACKGROUND

Town of Hartford

Bid Due: 7/22/2020

Invitation to Bid for Construction of Slate Quarry Park Request Date: 4/16/2020 10:04:01

State Government of Vermont

Bid Due: 6/08/2020

Cross Vermont Trail Association STP CVRT(2) - Winooski River bridge and bike path

State Government of Vermont

Bid Due: 6/02/2020

Disinfection Improvements Project Request Date: 5/7/2020 2:21:26 PM Open Date: Closing Date: 6/4/2020

State Government of Vermont

Bid Due: 6/04/2020