GYM FLOORING REPLACEMENT AT KING PHILIP MIDDLE SCHOOL
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 10, 2024 |
| Due Date: | Jan 7, 2025 |
| Solicitation No: | 250014 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The Town of West Hartford is seeking a contractor to supply all labor, materials, equipment, services, insurance (with specific coverage for work on PCB), and incidentals which are necessary or required to perform the work in accordance with applicable governmental regulations and these specifications for the removal and disposal of existing presumed PCB containing slab vapor barrier materials associated with the Gym floor slab in King Phillip Middle School - see Drawing F-1 for material types and locations. Disposal of removed floor sleepers and slab vapor barrier as presumed PCB-containing bulk product waste. Dispose of removed Gym wood flooring as construction debris. Supply and install sheet wood athletic flooring in the Gym of King Phillip Middle School as shown on Drawing F1.
Tammy Bradley 50 South Main Street West Hartford CT, 06107 United States Tel: 860-561-7472 Fax: tammyb@westhartfordct.gov
See Also
Wauregan Playground Equipment & Installation
Town of Plainfield
Due by 11/19/2026
Project ID: Title: Replacement of Gym Floor at Elizabeth Shelton School Addenda: 0
City of Shelton
Due by 12/04/2026
Follow Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Active Contract
DEPT OF DEFENSE
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
City of Stamford
Due by 12/10/2026