Groundwater Facility, Re-Pump Station, HVAC, and Ventilation System Improvements

Agency: City of Houston
State: Texas
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Feb 13, 2026
Due Date: Mar 19, 2026
Solicitation No: CB-2026-0006
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Reference Number: CB-2026-0006
Title: Groundwater Facility, Re-Pump Station, HVAC, and Ventilation System Improvements
E-BID
Due Date: 3/19/2026

Groundwater Facility, Re-Pump Station, HVAC, and Ventilation System Improvements
City of Houston, Texas
Get on Interest List
Details
Documents
Interest List
Q&A
E-Bid
Changes
Open
Reference No.
CB-2026-0006
Due Date
March 19, 2026 at 10:0:0 AM CDT
Questions Due
3/9/2026
Conference Date
2/24/2026
Time Remaining
33 Days
Basic Info
Release Date
2/13/2026
Type
Competitive Bidding Method
Department(s)
Houston Public Works
Categories
HVAC Systems, Power Plant, Maintenance and Repair
Air Conditioning, Heating, and Ventilating Equipment (HVAC) Manufacturing Services
Pumps and Pump Accessories Maintenance and Repair
Contaminated Groundwater Treatment Equipment
Contaminated Groundwater Services, Including Discharge Pipe Installation
+ 2 more
Contact Info
Contact Name
Patty Guerrero
Email Address
patricia.guerrero@houstontx.gov
Download Package
Attachments
Name
Draft Solicitation - CB-2026-0006 - GW Facility - Final.pdf
Detail
Solicitation
Type
PDF
Size
313KB
Age
4 days
Name
Exhibit_J_-_Site_Visit_and_Background_Check.docx
Detail
Other
Type
Word
Size
121KB
Age
4 days
Name
Asbestos_and_Lead_Reports_S-001000-0054-4.pdf
Detail
Reports
Type
PDF
Size
17.4MB
Age
14 days
Name
Drawings-WBS_No._S-001000-0054-4-final.pdf
Detail
Drawings
Type
PDF
Size
129.7MB
Age
14 days
Name
Geotechnical_Report_S-001000-0054-4.pdf
Detail
Reports
Type
PDF
Size
1.6MB
Age
14 days
Name
Project_Manual-WBS_No._S-001000-0054-4-Final.pdf
Detail
Other
Type
PDF
Size
30.1MB
Age
14 days
Name
Detail
Type
Size
Age
Draft Solicitation - CB-2026-0006 - GW Facility - Final.pdf
Solicitation
PDF
313KB
4 days
Exhibit_J_-_Site_Visit_and_Background_Check.docx
Other
Word
121KB
4 days
Asbestos_and_Lead_Reports_S-001000-0054-4.pdf
Reports
PDF
17.4MB
14 days
Drawings-WBS_No._S-001000-0054-4-final.pdf
Drawings
PDF
129.7MB
14 days
Geotechnical_Report_S-001000-0054-4.pdf
Reports
PDF
1.6MB
14 days
Project_Manual-WBS_No._S-001000-0054-4-Final.pdf
Other
PDF
30.1MB
14 days
1
E-Bid Attachments
Name
Attachment_J_-_Site_Visit_and_Background_Check.docx
Detail
E-Form Attachment
Type
Word
Size
127KB
Age
14 days
Name
00472_-_Goal_Deviation_Request_(1).pdf
Detail
E-Form Attachment
Type
PDF
Size
205KB
Age
14 days
Name
00471_-_Pre-Bid_Good_Faith_Efforts_(1).pdf
Detail
E-Form Attachment
Type
PDF
Size
281KB
Age
14 days
Name
pop1.pdf
Detail
E-Form Attachment
Type
PDF
Size
100KB
Age
14 days
Name
Exhibit_V_-_Conflict_of_Interst_Quest.docx
Detail
E-Form Attachment
Type
Word
Size
887KB
Age
14 days
Name
Exhibit_IV_-_Anti-Collusion_Statement_(CB).docx
Detail
E-Form Attachment
Type
Word
Size
21KB
Age
14 days
Name
Exhibit_III_-_Ownership_Information_Form.docx
Detail
E-Form Attachment
Type
Word
Size
56KB
Age
14 days
Name
Exhibit_II_-_Hire_Houston_First.docx
Detail
E-Form Attachment
Type
Word
Size
25KB
Age
14 days
Name
Exhibit_I_-_Official_Signature_Page,_References_(CB).docx
Detail
E-Form Attachment
Type
Word
Size
29KB
Age
14 days
Name
00470 - Bidder's MWSBE Participation Plan.pdf
Detail
E-Form Attachment
Type
PDF
Size
272KB
Age
155 days
Name
00430 - Bidders Bond.pdf
Detail
E-Form Attachment
Type
PDF
Size
115KB
Age
155 days
Name
Detail
Type
Size
Age
Attachment_J_-_Site_Visit_and_Background_Check.docx
E-Form Attachment
Word
127KB
14 days
00472_-_Goal_Deviation_Request_(1).pdf
E-Form Attachment
PDF
205KB
14 days
00471_-_Pre-Bid_Good_Faith_Efforts_(1).pdf
E-Form Attachment
PDF
281KB
14 days
pop1.pdf
E-Form Attachment
PDF
100KB
14 days
Exhibit_V_-_Conflict_of_Interst_Quest.docx
E-Form Attachment
Word
887KB
14 days
Exhibit_IV_-_Anti-Collusion_Statement_(CB).docx
E-Form Attachment
Word
21KB
14 days
Exhibit_III_-_Ownership_Information_Form.docx
E-Form Attachment
Word
56KB
14 days
Exhibit_II_-_Hire_Houston_First.docx
E-Form Attachment
Word
25KB
14 days
Exhibit_I_-_Official_Signature_Page,_References_(CB).docx
E-Form Attachment
Word
29KB
14 days
00470 - Bidder's MWSBE Participation Plan.pdf
E-Form Attachment
PDF
272KB
155 days
00430 - Bidders Bond.pdf
E-Form Attachment
PDF
115KB
155 days
1
Description

Project Summary : The City of Houston (“City”) is soliciting bids from qualified vendors to provide construction services for various improvements at multiple groundwater facilities and re-pump stations. The work includes renovations; pump and motor replacement and rehabilitation; replacement and rehabilitation of electrical switch gear, generators, motor control components, valves, piping; and HVAC and ventilation systems. All work shall be performed in accordance with the specifications and scope of work established by Houston Public Works (HPW).


Estimated Construction Budget: $16,845,000.00

NIGP Code : 941-55, 967-02, 936-62, 890-17, 926-29, 910-36, 031-95

MBE Goal : 13%

WBE Goal : 7%


For information related to bid opening, please visit the following link: Strategic Procurement Division's Bid Opening

Conference Date

Date: February 24, 2026 at 10:00 AM CST

Attendance is not mandatory, but it is strongly encouraged to ensure a full understanding of the project scope and requirements.

Microsoft Teams Meeting

Join on your computer or mobile app via:

https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting

Meeting ID: 219 424 480 543 23

Passcode: 6uB2mX6W

Or call in (audio only)

Conference Number: 1+936-755-1521

Conference ID: 772 066 48#

(Please mute your phone for the duration of the call)

Fixed Price - Intercontinental-1 (IAH-1) Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
LS
$79,021
Line Items - Construction - Intercontinental-1 (IAH-1) Groundwater Facility
#
Description
Spec Ref.
Quantity
UoM
1
2
3
4
5
6
7
8
Perform civil and site work including but not limited to demolition; removal and disposal of existing mechanical equipment, electrical equipment, structural debris, miscellaneous piping and valves, and replacement of isolation valves, complete in place per the drawings and specifications.
01270S 01520 01560 01562 01576 01578 01725 01731 01770 02085 02086 02136 02221 02522 16060
1
LS
Replace valves, piping, fittings and all appurtenances, including but not limited to check valves, gate valves, butterfly valves, thrust coupling harnesses, recoat all interior piping, fittings, supports, and accessories complete in place per the drawings and specifications. Replace valves, piping, fittings and all appurtenances, including but not limited to check valves, gate valves, butterfly valves, thrust coupling harnesses, recoat all interior piping, fittings, supports, and accessories complete in place per the drawings and specifications.
01270S 02501 02511 02514 02515 02521 02522 02523 02524 02525 02526 09901 09912 15151
1
LS
Furnish and install 1,050 GPM horizontal split case pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
2
EA
Paint all doors, and interior and exterior walls of the pump building, replace roof drain piping, and fixtures, including but not limited to pipe supports, sealants, joints, pipe penetrations through walls, complete in place per the drawings and specifications.
01270S 07620 07841 07900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
LS
Improvements to HVAC systems in Pump Building, Chemical Room including but not limited to HVAC units, louvers, fans, controls, sealant, and other mechanical, structural and electrical items, and spare parts, required for complete installation per the drawings and specifications.
01270S 07620 07841 07900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
LS
Complete improvements to electrical, instrumentation and control (SCADA) systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, security, spare parts, and lighting complete in place per the drawings and specifications.
01270S,1650,13410,13413,13417,13420,13422,13430,13440,13445,13446,13471,16010,16045,16050,16051,16060,16105,16111,16126,16140, 16161,16165,16170,16171,16195,16290,16402,16480,16410,16662,16663,
1
LS
Provide power system study
01270S 16105
1
LS
Provide City of Houston Construction Project Sign
'01582
1
EA
Fixed Price - Kingwood - 1 (A) Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
$112,899
Line Items - Construction - Kingwood - 1 (A) Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
1
2
3
4
5
6
7
8
9
10
11
Furnish, install, maintain, and remove storm water pollution prevention control measures including but not limited to filter fabric fence, inlet protection barrier, and stabilized construction exit for complete installation per the drawings and specifications.
01270S, 01570, 01575
1
LS
Perform civil and site work including but not limited to demolition; removal and disposal of existing mechanical equipment, electrical equipment, structural debris, asphalt driveway, miscellaneous piping and valves; installation of piping and isolation valves, installation of concrete slab, improvements to site grading, asphalt driveway improvements, detention calculations and requirements, pavement repair for electrical work and site restoration complete in place per the drawings and specifications.
01270S,01520,01560,01562,01576,01578,01725,01731,01770,02085,02086,02136,02221,02316,02317,02320,02521,02522,02526,02751,02752,02752S,03315,16060
1
LS
Improvements to pump suction and discharge piping, including pipe, fittings, valves, flow meters, backflow preventers, accessories, pipe supports, coating, disinfection and testing complete in place per the drawings and specifications.
01270S 02501 02511 02514 02515 02521 02522 02525 02526 15151
1
LS
Furnish and install 2,000 GPM vertical turbine pump and motor complete in place per the drawings and specifications.
01270S 11211 16140 16171 16410 16480 16481 16662 16663
2
EA
Furnish and install 1,500 GPM vertical turbine pump and motor complete in place per the drawings and specifications.
01270S 11211 16140 16171 16410 16480 16481 16662 16663
2
EA
Complete improvements to chemical room, phosphate delivery area, including but not limited to furnishing, installing, and testing chemical feed system components, backflow preventers for a complete installation per the drawings and specifications.
01270S 11242 11260 11261 11270
1
LS
Improvements to HVAC systems in Pump Building, Chemical Room including but not limited to HVAC units, louvers, fans, controls, sealant, and other mechanical, structural and electrical items, and spare parts, required for complete installation per the drawings and specifications.
01270S 07620 07841 07900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
LS
Improvements to control room roof; paint all interior and exterior walls, and doors of electrical and chlorinator rooms; paint all electrical conduits and walls blue in chemical room; paint interior of chlorine and control rooms; and replace exterior panel of chlorine storage shed per the drawings and specifications. Asbestos removal required.
01270S 07900 09901 09912
1
LS
Complete modifications to electrical, instrumentation and control (SCADA) systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, security, spare parts, and lighting complete in place per the drawings and specifications.
01270S 1650 13410 13413 13417 13420 13422 13440 13445 13446 13471 16010 16045 16050 16051 16060 16105 16111 16120 16123 16126 16131 16140 16161 16165 16170 16171 16195 16290 16380 16410 16480 16481
16482 16484 16662 16663 16709 16910 16950 16990
1
LS
Provide power system study
01270S 16105
1
LS
Provide City of Houston Construction Project Sign
01582
1
EA
Fixed Price - Kingwood - 2 (B) Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
LS
$9,955
Line Items - Construction - Kingwood - 2 (B) Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
1
2
3
4
5
6
Furnish, install, maintain, and remove storm water pollution prevention control measures including but not limited to filter fabric fence, inlet protection barrier, and stabilized construction exit for complete installation per the drawings and specifications.
01270S, 01570
1
LS
Demolish existing double swing gate; Furnish and install sliding gate with gate operator equipment and security access including electrical and instrumentation equipment complete in place per the drawings and specifications.
01270S 11120 11121 16010 16111 16126 16140 16195 16402
1
LS
Paint all interior and exterior walls of the pump building, chemical building, and chlorine storage building per the drawings and specifications.
01270S 07900 09901 09912
1
LS
Complete modifications to electrical, instrumentation and control (SCADA) and security systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, conduits, spare parts, and exterior yard lighting improvements for a complete installation per the drawings and specifications.
01270S 01650 13410 13413 13417 13420 13422 13430 13440 13445 13446 13471 16010 16045 16050 16051 16060 16105 16111 16126 16140 16161 16165 16170 16171 16195 16290 16402 16480 16410 16662 16663 16710
16737 16910 16950 16990
1
LS
Provide power system study
01270S 16105
1
LS
Provide City of Houston Construction Project Sign
1
each
Fixed Price - District 21 (Westlake Park) Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$60,755
Line Items - Construction - District 21 (Westlake Park) Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
1
2
3
4
5
6
7
8
9
10
Furnish, install, maintain, and remove storm water pollution prevention control measures including but not limited to filter fabric fence, inlet protection barrier, and stabilized construction exit for complete installation per the drawings and specifications.
01270S 01570 01575
1
lump sum
Perform civil and site work including but not limited to demolition; removal and disposal of existing mechanical equipment, electrical equipment, structural debris, concrete slab, miscellaneous piping and valves; installation of piping and isolation valves, installation of concrete slab, installation of asphalt pavement, installation of sliding gate, improvements to site grading, pavement repair for electrical work and site restoration complete in place per the drawings and specifications.
01270S 01520 01560 01562 01576 01578 01725 01731 01770 02085 02086 02136 02221 02316 02317 02320 02521 02522 02526 02751 02752 02752S 03315 16060
1
lump sum
Improvements to pump suction and discharge piping, including pipe, fittings, valves, flow meters, accessories, pipe supports, coating, disinfection and testing for complete installation per the drawings and specifications.
02501 02506 02511 02514 02515 02516 02521 02522 02523 02524 02525 02526 02527 02533 03315 07900 15151
1
lump sum
Furnish and install 750 GPM horizontal split case (HSC) pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
1
each
Furnish and install 1,000 GPM horizontal split case (HSC) pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
1
each
Remove and replace roofs on Electrical/Control and Chemical building complete in place; and paint all exterior walls of the control and chemical building per the drawings and specifications. Asbestos removal required.
01270S 7210 7520 7620 7841 7900
1
lump sum
Improvements to HVAC systems in Electrical /control Building and Chemical Room including but not limited to HVAC units, louvers, fans, controls, sealant, and other mechanical, structural and electrical items, and spare parts, required for complete installation per the drawings and specifications
01270S 07620 07841 07900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
lump sum
Complete modifications to electrical, instrumentation and control (SCADA) systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, security, spare parts, and lighting complete in place per the drawings and specifications.
01270S 01650 13410 13413 13417 13420 13422 13430 13440 13445 13446 13471 16010 16045 16050 16051 16105 16126 16140 16165 16170 16171 16195 16290 16380 16410 16480 16481 16482 16510 16662 16663 16670
16171 16195 16290 16380 16410 16480 16481 16482 16510 16662 16663 16670 16709 16710 16737 16740 16910 16950 16990
1
lump sum
Provide power system study
01270S 16105
1
lump sum
Provide City of Houston Construction Project Sign
01582
1
each
Fixed Price - White Oak Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$111,911
Line Items - Construction - White Oak Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Furnish, install, maintain, and remove storm water pollution prevention control measures including but not limited to filter fabric fence, inlet protection barrier, and stabilized construction exit for complete installation per the drawings and specifications.
01270S 01570 01575
1
lump sum
Perform civil and site work including but not limited to demolition; removal and disposal of existing mechanical equipment, electrical equipment, structural debris, miscellaneous piping and isolation valves; site grading, pavement repair for electrical work, detention calculations and requirements, installation of pavement, existing pavement repair for electrical work and site restoration complete in place per the drawings and specifications.
01270S 01520 01560 01562 01576 01578 01725 01731 01770 02085 02086 02136 02221 02317 02320 02521 02522 02526 03315 11120 16010 16060 16111 16126 16140 16195 16402
1
lump sum
Furnish and install equipment foundations, concrete sidewalk, concrete pavement, vapor barrier, select fill, and all other required materials to complete concrete work per the drawings and specifications.
01270S 02136 02201 02221 02316 02581 03100 03211 03250 03310 03315 07620 07841 07900
1
lump sum
Furnish and Install new pump building, electrical building, chlorine room and LAS room including foundation and all required materials and spare parts for a complete installation per the drawings and specifications.
01270S 04061 04200 04210 07210 07260 07841 07900 08111 08333 08710 09221 09672 09901 09912 10200 10441 13410 13413 13420 13422 13430 13440 13445 13446 13471 15040 15050 15057 15076 15090 15640 15738
15815 15838 16010 16045 16111 16120 16121 16122 16123 16126 16131 16140 16161 16165 16170 16380 16410 16480 16481 16482 16484 16510 16663 16670 16910 16950 16990
1
lump sum
Furnish and install pipe, fittings, valves, flow meters, pipe supports, coating, appurtenances, and trolley hoist in the pump room complete in place per the drawings and specifications.
01270S 02221 02501 02506 02511 02514 02515 02516 02521 02522 02523 02524 02525 02526 02527 02533 03315 07900 14320 15151
1
lump sum
Furnish and install 500 GPM HSC pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
1
each
Furnish and install 750 GPM HSC pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
1
each
Furnish and install 1000 GPM HSC pump and motor complete in place per the drawings and specifications.
01270S 11419 16140 16171 16410 16480 16481 16662 16663
1
each
Furnish and install complete chlorination system complete in place per the drawings and specifications.
01270S 11260
1
lump sum
Furnish and install complete LAS (Liquid Ammonium Sulfate) system including but not limited to chemical feed pumps, piping, valves, spare parts, and appurtenances complete in place as per the drawings and specifications.
01270S 11280 11270
1
lump sum
Installation of ventilation systems in pump building, electrical building, chlorine room and LAS room including but not limited to structural modifications, HVAC units, louvers, fans, motorized dampers, controls, sealant, and other mechanical and electrical items, and spare parts, required for complete installation per the drawings and specifications.
01270S 07620 07841 07900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
lump sum
Complete modifications to electrical, instrumentation and control (SCADA) systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, security, spare parts, and lighting per the drawings and specifications.
01270S 01650 13410 13413 13417 13420 13422 13430 13440 13445 13446 13471 16010 16045 16050 16051 16105 16126 16140 16165 16170 16171 16195 16290 16380 16410 16480 16481 16482 16510 16662 16663 16670
16709 16710 16737 16740 16910 16950 16990
1
lump sum
Provide power system study
01270S 16105
1
lump sum
Provide City of Houston Construction Project Sign
01582
1
each
Fixed Price - Forest Cove - 2 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$68,179
Line Items - Construction - Forest Cove - 2 Groundwater Facility
#
Description
Spec No.
Details
Quantity
UoM
1
2
3
4
5
6
7
8
9
10
Furnish, install, maintain, and remove storm water pollution prevention control measures including but not limited to filter fabric fence, inlet protection barrier, and stabilized construction exit for complete installation per the drawings and specifications.
01270S 01570 01575
1
lump sum
Perform civil and site work including but not limited to demolition; removal and disposal of existing mechanical equipment, electrical equipment, structural debris, miscellaneous piping and isolation valves; site grading, pavement repair for electrical work, and site restoration complete in place per the drawings and specifications.
01270S 01520 01560 01562 01576 01578 01582 01725 01731 01770 02085 02086 02136 02221 02317 02320 02521 02522 02526 03315 11120 16010 16060 16111 16126 16140 16195 16402
1
lump sum
Improvements to pump suction and discharge piping, including pipe, fittings, valves, flow meters, isolation valve replacement, accessories, pipe supports, coating, disinfection and testing for complete installation per the drawings and specifications.
01270S 02221 02501 02506 02511 02514 02515 02516 02521 02522 02523 02524 02525 02526 02527 02533 03315 07900 15151
1
lump sum
Furnish and install 500 GPM vertical turbine pump and motor and appurtenances for a complete installation per the drawings and specifications.
01270S 11211 16140 16171 16410 16480 16481 16662 16663
2
each
Furnish and Install new chemical building including foundation and all required materials and spare parts for a complete installation per the drawings and specifications.
01270S 04061 04200 04210 07210 07260 07841 07900 08111 08333 08710 09221 09672 09901 09912 10200 10441 13410 13413 13420 13422 13430 13440 13445 13446 13471 15040 15050 15057 15076 15090 15640 15738
15815 15838 16010 16045 16111 16120 16121 16122 16123 16126 16131 16140 16161 16165 16170 16380 16410 16480 16481 16482 16484 16510 16663 16670 16910 16950 16990
1
lump sum
Furnish and install complete chlorination system complete in place per the drawings and specifications.
01270S 11260
1
lump sum
Improvements to ventilation systems in electrical building including but not limited to HVAC units, louvers, fans, motorized dampers, controls, sealant, and other mechanical and electrical items, and spare parts, required complete in place per the drawings and specifications
01270S 4200 7620 7841 7900 10200 15040 15046 15050 15057 15076 15090 15640 15738 15815 15838 15950 16010 16045 16111 16131 16165 16170 16171 16195 16290 16402 16990
1
lump sum
Complete modifications to electrical, instrumentation and control (SCADA) systems for the site including but not limited to electrical and instrumentation equipment, programming and process control system integration, security, spare parts, and lighting per the drawings and specifications.
01270S 01650 13410 13413 13417 13420 13422 13430 13440 13445 13446 13471 16010 16045 16050 16051 16105 16126 16140 16165 16170 16171 16195 16290 16380 16410 16480 16481 16482 16510 16662 16663 16670
16171 16195 16290 16380 16410 16480 16481
1
lump sum
Provide power system study
01270S 16105
1
lump sum
Provide City of Houston Construction Project Sign
'01582
1
each
Fixed Price - District 71 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$2,848
Line Items - Construction - District 71 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
1
2
Remove and replace roofs on control building and generator building complete in place; paint all interior and exterior walls of the control building; and replace all doors of the control building per the drawings and specifications. Asbestos removal required.
01270S 07210 07520 07620 07841 07900
1
lump sum
Provide City of Houston Construction Project Sign
01582
1
each
Fixed Price - District 71 Well No. 2
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$3,285
Line Items - Construction - District 71 Well No. 2
#
Description
Spec No.
Quantity
UoM
1
2
Remove and replace roofs on control building complete in place per the drawings and specifications. Asbestos removal required.
01270S 07210 07520 07620 07841 07900
1
lump sum
Provide City of Houston Construction Project Sign
01582
1
each
Fixed Price - District 51 - No. 2 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
Fixed Price
1
Mobilization
01502
1
lump sum
$1,147
Line Items - Construction - District 51 - No. 2 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
1
2
Remove and replace roofs on chlorine and control building complete in place per the drawings and specifications.
01270S 07210 07520 07620 07841 07900
1
lump sum
Provide City of Houston Construction Project Sign
01582
1
each
Line Items - Construction - Total District 51 - No. 2 Groundwater Facility
#
Description
Spec No.
Quantity
UoM
1
Provide for all sites Technical Asset Data forms using electronic Microsoft Excel format template provided by City
01650
1
lump sum
C. Extra Unit Pricing Table
#
Description
Spec. Ref.
Quantity
UoM
Min Value
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
EXTRA HAND EXCAVATION
02317, 02318
100
CY
$25
EXTRA MACHINE EXCAVATION
02317, 02318
100
CY
$20
EXTRA PLACEMENT OF SELECT BACKFILL MATERIAL
02316, 02318
100
CY
$10
EXTRA CEMENT STABILIZED SAND, COMPLETE IN PLACE
02321S
100
CY
$80
EXTRA 6" REINFORCED CONCRETE PAVEMENT
02751
100
SY
$150
EXTRA 3" ASPHALT PAVEMENT WITH 8" CEMENT TREATED BASE
02741
200
SY
$98
EXTRA CONCRETE PIPE SUPPORT
03310
5
each
$1,200
EXTRA CONCRETE GROUT IN PLACE
03600
20
CY
$32
EXTRA 12" BUTTERFLY VALVES
02522
2
each
$6,000
EXTRA 16" BUTTERFLY VALVES
02522
2
each
$7,000
EXTRA 24" BUTTERFLY VALVES
01270S, 02522
2
each
$13,000
EXTRA 36" BUTTERFLY VALVES
02522
1
each
$18,000
EXTRA 12" GATE VALVES
02521S
2
each
$11,000
EXTRA CONCRETE DECK REPAIR
03740
100
SY
$500
EXTRA 1" - 3" CONDUITS
16111
1,000
linear foot
$8.5
EXTRA 16" STEEL PIPE
02502, 02511
50
linear foot
$370
EXTRA 12" STEEL PIPE
02502, 02511
50
linear foot
$310
EXTRA 8" STEEL PIPE
02502,02511
50
linear foot
$250
Cash Allowance Table:
#
Description
Spec No.
Quantity
UoM
Cash Allowance
1
2
3
4
5
6
7
Centerpoint Energy allowance – White Oak
00700
1
lump sum
$50,000
Centerpoint Energy allowance – Forest Cove-2
00700
1
$65,000
Centerpoint Energy allowance – District 21
00700
1
$90,000
Electrical Permits – For All Sites
00700
1
$40,000
Building Permits
00700
1
$25,000
Floodplain Permits - White Oak, Kingwood-A and Kingwood-B
00700
1
$15,000
TDLR Permits
00700
1
$25,000
Open
Reference No.
CB-2026-0006
Due Date
March 19, 2026 at 10:0:0 AM CDT
Questions Due
3/9/2026
Conference Date
2/24/2026
Time Remaining
33 Days
This solicitation is an E-Bid. Please register and fill out the form.
You will receive an email with a secure link to submit your response.
Register for E-Bid Submission
Contact Information
1
Submission Requirements
2
Fixed Price - Intercontinental-1 (IAH-1) Groundwater Facility
3
Line Items - Construction - Intercontinental-1 (IAH-1) Groundwater Facility
4
Fixed Price - Kingwood - 1 (A) Groundwater Facility
5
Line Items - Construction - Kingwood - 1 (A) Groundwater Facility
6
Fixed Price - Kingwood - 2 (B) Groundwater Facility
7
Line Items - Construction - Kingwood - 2 (B) Groundwater Facility
8
Fixed Price - District 21 (Westlake Park) Groundwater Facility
9
Line Items - Construction - District 21 (Westlake Park) Groundwater Facility
10
Fixed Price - White Oak Groundwater Facility
11
Line Items - Construction - White Oak Groundwater Facility
12
Fixed Price - Forest Cove - 2 Groundwater Facility
13
Line Items - Construction - Forest Cove - 2 Groundwater Facility
14
Fixed Price - District 71 Groundwater Facility
15
Line Items - Construction - District 71 Groundwater Facility
16
Fixed Price - District 71 Well No. 2
17
Line Items - Construction - District 71 Well No. 2
18
Fixed Price - District 51 - No. 2 Groundwater Facility
19
Line Items - Construction - District 51 - No. 2 Groundwater Facility
20
Line Items - Construction - Total District 51 - No. 2 Groundwater Facility
21
C. Extra Unit Pricing Table
22
Cash Allowance Table:
Contact Information
Company
Company Name
Company Address
City
State
Select a state
Postal Code
Special Designation
Select business designations
Contact
Contact Name
Contact Phone
Contact Email
Contact Position
Next
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project: 2026-008 RFB for Fuel Station Ref. #: 2026-008 Department: Purchasing Type: RFB

Port of Galveston

Bid Due: 7/08/2026

STATE LET CONSTRUCTION CONTRACT, EASTLAND CO, REPAIR ROADWAY Solicitation ID: 0007-06-268_0726 Due Date:

State Government of Texas

Bid Due: 7/01/2026

LOCAL LET MAINTENANCE CONTRACT, GUADALUPE CO, EROSION REPAIR Solicitation ID: 6497-32-001_0726 Due Date:

State Government of Texas

Bid Due: 7/22/2026

Frisco Campus Chilled and Heating Water Loop Extension Solicitation ID: FY2026-CSP-059 Due Date:

State Government of Texas

Bid Due: 7/28/2026