St. Louis District, Great Rivers Greenway, Brickline Greenway North Connector Phase 2 construct greenway trail, new sidewalk, street reconfiguration, signals, lighting, and landscaping along Spring Avenue between Page Avenue and Washington Avenue

Agency: Missouri Department of Transportation(MDOT)
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 238990 - All Other Specialty Trade Contractors
  • 561730 - Landscaping Services
Posted Date: Sep 21, 2026
Due Date: Sep 24, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Attachment Preview

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 2
NOTICE TO CONTRACTORS
Sealed bids for Brickline Greenway North Connector Phase 2 TAP -9901(688) will be received
by Great Rivers Greenway at 3745 Foundry Way, Suite 253, St. Louis, MO 63110 until 2:00
o'clock P.M. (Prevailing Local Time) on September 24, 2026 , and at that time will be publicly
opened and read. The suggested method of submitting bids is electronically. Bids may be
submitted electronically via the Bid Express website at www.bidexpress.com .
Construction of the Brickline Greenway North Connector Phase 2 (Page Boulevard to
Washington Avenue) includes the greenway trail and new sidewalk, curbs, seatwalls, unit
pavers, street reconfiguration, signals, street and pedestrian lighting, utilities, tr ees,
landscaping, irrigation, trail signage and wayfinding, and site furniture. The work consists of
furnishing all material, labor, tools, equipment, and supervision necessary .
Hard copies of the Bid Documents can be obtained from Cross Rhodes Reprographics, 2731 S
Jefferson Ave, St. Louis, MO 63118, (314) 678 -0087. The Contractor is responsible for the
drawing costs.
A Pre -Bid Conference will be held on September 3 , 2026, at 10:30 A.M. prevailing Central time
at Great Rivers Greenway office at 3745 Foundry Way, Suite 253, St. Louis, Missouri 63110.
The pre -bid conference will also be held virtually via Zoom. Login Information is listed here:
https://us02web.zoom.us/j/85793124835?from=addon
Meeting ID: 857 9312 4835
Questions should be directed via the solicitation on Bid Express. All requests for clarification
on these bidding documents must be received in writing by September 8, 2026, at 2:00 P.M.
prevailing Central time .
All labor used in the construction of this public improvement shall be paid a wage no less
than the prevailing hourly rate of wages of work of a similar character in this locality as
established by the Department of Labor and Industrial Relations (Federal Wage Rate), or
state wage rate, whichever is higher.
Great Rivers Greenway hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, businesses owned and controlled by
socially and economically disadvantaged individuals will be afforded full opportunity to
sub mit bids in response to this invitation and will not be discriminated against on the grounds
of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an
award."
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 from the current
version of the Missouri Standard Specifications for Highway Construction, including all
revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub -contractors who sign a contract to work on public works projects
provide a 10 -Hour OSHA construction safety program, or similar program approved by the
Department of Labor and Industrial Relations, to be completed by their on -site employees
within sixty (60) days of beginning work on the construction project.

A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each
proposal.
Great Rivers Greenway reserves the right to reject any or all bids.
The Disadvantaged Business Enterprise ( DBE ) Goal for this project has been established by
the Missouri Department of Transportation and is zero (0%).

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY

DEPT OF DEFENSE

Due by 11/16/2026

Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY

DEPT OF DEFENSE

Due by 11/16/2026

Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY

DEPT OF DEFENSE

Due by 11/16/2026

Status Bid Advertisement Post Date Revision Date Letting Date NEW STL District, City

Missouri Department of Transportation(MDOT)

Due by 10/06/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.