St. Louis District, Great Rivers Greenway, Brickline Greenway North Connector Phase 3 construct greenway trail, new sidewalk, street reconfiguration, signals, lighting, and landscaping along Spring Avenue between Washington Avenue and Lindell Boulevard
| Agency: | Missouri Department of Transportation(MDOT) |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 21, 2026 |
| Due Date: | Sep 24, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Attachment Preview
BRICKLINE GREENWAY NORTH CONNECTOR PHASE 3
NOTICE TO CONTRACTORS
Sealed bids for Brickline Greenway North Connector Phase 3 TAP -5401(721) will be received
by Great Rivers Greenway at 3745 Foundry Way, Suite 253, St. Louis, MO 63110 until 2:00
o'clock P.M. (Prevailing Local Time) on September 24, 2026 , and at that time will be publicly
opened and read. The suggested method of submitting bids is electronically. Bids may be
submitted electronically via the Bid Express website at www.bidexpress.com .
Construction of the Brickline Greenway North Connector Phase 3 (Washington Avenue to
Lindell Boulevard) includes the greenway trail and new sidewalk, curbs, unit pavers, street
reconfiguration, signals, street and pedestrian lighting, utilities, trees, lan dscaping, irrigation,
trail signage and wayfinding, and site furniture. The work consists of furnishing all material,
labor, tools, equipment, and supervision necessary .
Hard copies of the Bid Documents can be obtained from Cross Rhodes Reprographics, 2731 S
Jefferson Ave, St. Louis, MO 63118, (314) 678 -0087. The Contractor is responsible for the
drawing costs.
A Pre -Bid Conference will be held on September 3 , 2026, at 10:30 A.M. prevailing Central time
at Great Rivers Greenway office at 3745 Foundry Way, Suite 253, St. Louis, Missouri 63110.
The pre -bid conference will also be held virtually via Zoom. Login Information is listed here:
https://us02web.zoom.us/j/85793124835?from=addon
Meeting ID: 857 9312 4835
Questions should be directed via the solicitation on Bid Express. All requests for clarification
on these bidding documents must be received in writing by September 8, 2026, at 2:00 P.M.
prevailing Central time .
All labor used in the construction of this public improvement shall be paid a wage no less
than the prevailing hourly rate of wages of work of a similar character in this locality as
established by the Department of Labor and Industrial Relations (Federal Wage Rate), or
state wage rate, whichever is higher.
Great Rivers Greenway hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, businesses owned and controlled by
socially and economically disadvantaged individuals will be afforded full opportunity to
sub mit bids in response to this invitation and will not be discriminated against on the grounds
of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an
award."
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 from the current
version of the Missouri Standard Specifications for Highway Construction, including all
revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub -contractors who sign a contract to work on public works projects
provide a 10 -Hour OSHA construction safety program, or similar program approved by the
Department of Labor and Industrial Relations, to be completed by their on -site employees
within sixty (60) days of beginning work on the construction project.
A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each
proposal.
Great Rivers Greenway reserves the right to reject any or all bids.
The Disadvantaged Business Enterprise ( DBE ) Goal for this project has been established by
the Missouri Department of Transportation and is zero (0%).
See Also
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026
Status Bid Advertisement Post Date Revision Date Letting Date NEW STL District, City
Missouri Department of Transportation(MDOT)
Due by 10/06/2026