GREENEVILLE SANITARY SEWER REHABILITATION
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 27, 2026 |
| Due Date: | Apr 30, 2026 |
| Solicitation No: | 26-54 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
GREENEVILLE SANITARY SEWER REHABILITATION
The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: • The Work includes cleaning and investigative closed-circuit television (CCTV) inspection of approximately 540 linear feet of 24-inch brick pipeline and 230 linear feet of 27-inch brick pipeline not previously inspected. • The Work includes approximately 11,393 linear feet of cured-in-place pipe (CIPP) lined sanitary sewers ranging in diameter from 8- to 36-inch. The following CIPP liner insertion and curing methods shall be allowed for the pipeline diameter ranges included below: Diameter (Inches) Allowable Insertion/Curing Method 8 through 16 Air/Steam Greater than 16 Hydrostatic/Water • The Work includes the application of geopolymer lining in 49 sanitary manholes, totaling approximately 404 vertical feet.
Contact Information
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3706 Fax: rcastronova@cityofnorwich.org
See Also
Prequalification: E Building Heat Pipe Replacement UConn Health (UCH) will be replacing existing
State Government of Connecticut
Due by 11/17/2026
Invitation to Bid for Construction Services Rowland Government Center - Energy Audit Implementation
State Government of Connecticut
Due by 12/15/2026
Project ID: 26/27-17 Title: FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3
Town of Manchester
Due by 11/17/2026
Window Replacement Services Addendum #1 Addendum #2
Town of Plainfield
Due by 11/10/2026