Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Apr 29, 2026 12:59 pm EDT
- Original Response Date:
- Inactive Policy: Manual
- Original Inactive Date: Dec 31, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z1AZ - MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
-
NAICS Code:
- 238190 - Other Foundation, Structure, and Building Exterior Contractors
-
Place of Performance:
DC 20401USA
This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes:
The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages.
The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting.
The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair:
Pre-Construction Tasks
- Obtain all required permits and approvals.
- Submit project schedule, safety plan, and traffic control plan.
- Coordinate with GPO project management and stakeholders.
- Conduct pre-construction meetings and site walkthrough.
Site Preparation & Demolition
- Install temporary barriers, signage, and traffic control measures.
- Set up designated staging and material storage areas.
- Perform selective demolition of existing structures as required.
- Ensure safe removal and disposal of construction debris.
Material Delivery & Logistics
- Coordinate material deliveries in compliance with schedule.
- Inspect and verify all materials upon arrival.
- Store materials in designated secure areas.
Construction & Installation
- Perform site grading and preparation, if applicable.
- Install structural components, framing, and support systems.
- Complete mechanical, electrical, and plumbing (MEP) installations.
- Install architectural finishes, including flooring, ceilings, and walls.
- Implement weatherproofing and insulation systems as required.
- Conduct equipment and systems testing to ensure functionality.
Safety & Compliance
- Maintain compliance with OSHA and other regulatory standards.
- Implement and monitor safety protocols for workers and pedestrians.
- Address any environmental concerns, including hazardous material handling.
Quality Control & Inspections
- Conduct periodic quality control checks.
- Submit required inspection and testing reports.
- Address any deficiencies noted in inspections.
Project Closeout
- Complete all final construction activities and finishing work.
- Conduct a final walkthrough with the GPO project team.
- Prepare and submit as-built drawings and O&M manuals.
- Resolve punch list items and obtain final acceptance.
- Restore site and remove temporary facilities.
- Submit final project documentation, including warranties and certifications
Period of Performace is eighteen (18) months from Notice to Proceed.
A site visit will be scheduled and listed in the solicitation.
- 732 N. Capitol Street NW
- Washington , DC 20401
- USA
- Troy D. White
- twhite@gpo.gov
- Gary Stevens
- gstevens@gpo.gov
- Apr 29, 2026 12:59 pm EDTPresolicitation (Original)
Related Document
| May 13, 2026 | [Solicitation (Original)] GPO G-Street Sidewalk Repair |
See Also
Follow Exterior Porches, Roofs and Stairs (3) Replacement Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/21/2026
Follow Exterior Porches, Roofs and Stairs (3) Replacement Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/21/2026
Follow Main Treasury Soffit Painting Active Contract Opportunity Notice ID 2032H326Q00067 Related Notice
TREASURY, DEPARTMENT OF THE
Due by 9/16/2026
Follow 33330226RF0010010 Indefinite Delivery Indefinite Quantity (IDIQ) for Construction Services in Washington DC
SMITHSONIAN INSTITUTION
Due by 10/06/2026