| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 26, 2025 |
| Due Date: | Sep 9, 2025 |
| Solicitation No: | 943981.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | Gonda Center Deep Energy Project |
| Project Number | 943981.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:
This project will upgrade existing air handling units and lighting systems within the Gonda Center to reduce the building’s annual energy usage by approximately 45 percent. Most energy savings will be achieved by converting laboratory air handling units from constant-volume to variable-airflow systems. Other opportunities for energy efficiency include programming upgrades for system controls and new lighting. The Work shall include several measures. Basement-level vivarium air handling units shall be upgraded from pneumatic to direct digital control (DDC) and laboratory exhaust valves converted from constant volume to variable air volume (VAV). In laboratory spaces, occupancy sensors shall be installed to reduce air changes and exhaust controls would be modified on fume hoods. New system strategies shall reduce equipment use through control of scheduling, temperature, pumps, and start/stop optimization. Lights and lighting control improvements shall include replacing fluorescent lights with LEDs. Related scope shall include patch and paint of walls in areas impacted by the work. In locations where equipment is above the existing ceilings grids, work shall include ceiling removal and re-installation, or replacement, after work is complete. All work shall be performed in a fully operational and restricted building. Night and off-shift work will be required in sensitive areas as identified by University Representative. Contractor shall maintain building security at all times and will be responsible for furnishing access to workers and vendors for deliveries. Contractor shall include an initial air survey of as-built condition for all areas and equipment under the scope of work. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $6,958,000.00 |
| LS2501 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Project 6CA1181 - Seeking Competitive Lease Proposals - Administrative Office Space in
GENERAL SERVICES ADMINISTRATION
Bid Due: 9/07/2026
Basic Information Title WANTED TO LEASE BY THE STATE OF CALIFORNIA - Redding
State Government of California
Bid Due: 8/31/2026
Follow Request for Qualifications/Request for Proposals (RFQ/RFP) Pacific Coast Highway Area Reutilization Lease
DEPT OF DEFENSE
Bid Due: 9/30/2026
Follow United States Department of Agriculture Seeks to Lease Office Space in Yuba
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026