GLO CDBG MIT-MOD Kaanapali Lane Drainage Improvements
| Agency: | State Government of Texas |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 1, 2026 |
| Due Date: | Oct 27, 2026 |
| Solicitation No: | RFB26BCP08A |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
RFB26BCP08A
Posted
Leon Scaife
(512) 581-7110
leon.scaife@co.bastrop.tx.us
10/27/2026
2:00 PM
C0110
21+ Days for Solicitation Notice
Exempt (Attorney or Texas SmartBuy Member)
10/1/2026
10/1/2026 12:01 am
91300-Construction Services, Heavy (Incl. Maintenance And Repair Services);
91400-Construction Services, Trade (New Construction);
91313-Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation);
91327-Construction, Highway And Road;
91339-Construction, Pipe Culvert;
91345-Construction, Sewer And Storm Drain;
91350-Construction, Street (Major And Residential)(Includes Reconstruction);
91362-Construction, Concrete, Pour-In-Place, Form, Place, Finish;
91430-Concrete;
District 1,
District 2,
District 3,
District 4,
District 5,
District 6,
District 7,
District 8,
District 9,
District 10,
District 11,
District 12,
District 13,
District 14,
District 15,
District 16,
District 17,
District 18,
District 19,
District 20,
District 21,
District 22,
District 23,
District 24,
District 25
Bastrop County is requesting bids for a drainage improvement project on Kaanapali Lane over Copperas Creek within the 300 Block of Kaanapali Lane (30°05'18.7"N - 97°16'38.9"W). This project area provides critical habitat for the federally endangered Houston Toad. Bastrop County will provide and deploy a permitted Houston Toad monitor for the duration of construction activities, and all contracted personnel will be trained by a Houston Toad Biologist prior to commencing work. All avoidance and minimization measures are listed in the “Biological Resource Notes” in the General Notes page 2 of the plans and specifications. The submitted bid price should be based on the installation of erosion control measures, implementation of traffic control, demolition of the two (2) existing 60” corrugated metal pipe culverts and roadway, grading, construction of four 10’ x 5’ Rigid Concrete Box culverts with 9ft wingwalls and pavement repair, and stabilization of the project site. Contractor shall maintain one lane of traffic through the project limits at all times during Phase 1 and Phase 2 construction using flaggers, traffic control devices, and temporary pavement as shown in the Traffic Control Plans.
See Also
CSP 27.03 - West Brook High School Roofing Project CSP 27.03 - West
Beaumont Independent School District
Due by 11/20/2026
Paint and Trim - Coffield Follow Solicitation Solicitation ID: IW271915 Status: Posted Contact
State Government of Texas
Due by 12/01/2026
Follow Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS),
DEPT OF DEFENSE
Due by 11/20/2026
Follow USACE Enterprise Dredge Delivery Center Scope Dredge to Budget Contract Active Contract
DEPT OF DEFENSE
Due by 11/19/2026