Glades Wastewater Treatment Facility Deep Injection Well No. 2
| Agency: | City of Port St. Lucie |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 12, 2025 |
| Due Date: | Dec 22, 2025 |
| Solicitation No: | 20260079 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 20260079
Title: Glades Wastewater Treatment Facility Deep Injection Well No. 2
Addenda: 0
Release Date: 11/12/2025
Due Date: 12/22/2025
Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic IFB is being issued to establish a contract with a qualified proposer who will provide Glades Wastewater Treatment Facility Deep Injection Well No. 2 to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB .
The City of Port St. Lucie Utility Systems Department (USD) currently operates a Class I deep injection well system at the Glades Wastewater Treatment Facility (WWTF). The WWTF is located at 10700 Glades Cutoff Road, Port St. Lucie, Florida. The WWTF’s current treatment capacity is 12 million gallons per day (mgd) and will ultimately be expanded to a treatment capacity of 24 mgd.
The current WWTF injection well system consists of one Class I Industrial deep injection well (IW-1) and an associated dual-zone monitor well (MW-1). The injection well system is used for disposal of treated wastewater and also serves as a backup disposal option for reverse-osmosis concentrate from the James E. Anderson Water Treatment Plant (JEAWTP). Effluent is treated to high-level disinfection standards prior to disposal via the Glades WWTF deep injection well system
Deep injection well IW-1 was completed with a 26-inch diameter steel casing installed to a depth of 2,604 feet below pad level (bpl) and a total depth of 3,200 feet bpl. A nominal 20-inch diameter fiberglass reinforced plastic (FRP) injection tubing was installed inside the final casing to a depth of 2,594 feet bpl. The well has a fluid filled annulus between the final casing and injection tubing. Injection well IW-1 has a permitted disposal capacity of 7,913 gallons per minute (gpm) and a daily maximum injection volume of 11.4 mgd. Dual-zone monitor well MW-1 was constructed with an upper monitor zone of 1,480 to 1,518 feet bpl and a lower monitor zone of 1,751 to 1,810 feet bpl
The USD plans to construct an additional Class I deep injection well (IW-2) at the WWTF to meet future demands.
10700 NW Glades Cutoff Road, Port St. Lucie, FL 34987
Conference Room
Attendance is highly suggested
See Also
The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing for a
State Government of Florida
Due by 9/21/2026
Advertisement Detail Department of Transportation Informational Notice Janitorial Services for Florida's Turnpike Headquarters
State Government of Florida
Due by 11/12/2080
Notice: 31272235 Notice of Bid/Request for Proposal Department: FISH AND WILDLIFE CONSERVATION COMMISSION
Florida Department of State
Due by 9/22/2026
The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing for running
State Government of Florida
Due by 9/11/2026