Geothermal Permeable Pavement Construction, Wilson, NC
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 29, 2025 |
| Due Date: | Aug 20, 2025 |
| Solicitation No: | 63-KGS1113518 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 63-KGS1113518 |
| Project Title: | Geothermal Permeable Pavement Construction, Wilson, NC |
| Description: | NC State Department of Biological and Agricultural Engineering (hereafter referred to as NC State or University) seeks proposals from qualified contractors (hereafter referred to as contractor or supplier) to perform the construction of a geothermal permeable pavement system in a parking lot at 114 Douglas St S, Wilson, North Carolina, 27893 (35°43' 25.6'' N, 77°54' 36.9'' W). The purpose of the proposed project is to improve stormwater runoff from an existing impervious parking lot by retrofitting a portion of the parking stalls with permeable pavement. Additionally, geothermal coils will be installed at the base of the permeable pavement to generate energy, which will be used to regulate temperature in an adjacent greenhouse. The construction is part of an innovative stormwater project funded by the North Carolina Land and Water Fund (NCL&WF) and will be used in research trials. |
| Opening Date: | 8/20/2025 2:00 PM |
| Posted Date: | 7/29/2025 |
| Status: | Open |
| Department: | NORTH CAROLINA STATE UNIVERSITY |
|
Solicitation Number
*
63-KGS1113518
|
Department
NORTH CAROLINA STATE UNIVERSITY
|
Status Reason
Open
|
|
|
Opening Date
2025-08-20T14:00:00.0000000
|
Posted Date
*
2025-07-29T13:03:12.0000000Z
|
Commodity Code
Water pollution
|
|
|
Mandatory Conference/Site Visit
2025-08-11T04:00:00.0000000Z
|
Special Instructions
Mandatory Site Visit: 08/11/2025, 10:00 AM; County, Wilson
|
||
|
Description
NC State Department of Biological and Agricultural Engineering (hereafter referred to as NC State or University) seeks proposals from qualified contractors (hereafter referred to as contractor or supplier) to perform the construction of a geothermal permeable pavement system in a parking lot at 114 Douglas St S, Wilson, North Carolina, 27893 (35°43' 25.6'' N, 77°54' 36.9'' W). The purpose of the proposed project is to improve stormwater runoff from an existing impervious parking lot by retrofitting a portion of the parking stalls with permeable pavement. Additionally, geothermal coils will be installed at the base of the permeable pavement to generate energy, which will be used to regulate temperature in an adjacent greenhouse. The construction is part of an innovative stormwater project funded by the North Carolina Land and Water Fund (NCL&WF) and will be used in research trials.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
DE00435 POC Resurfacing - RR Crossings DE00435 - Combined Plan Set.pdf Doc. Type:
Division of Highways
Due by 10/14/2026
ADVERTISEMENT FOR BIDS- Lufkin Road Middle School Fire Alarm Replacement ADVERTISEMENT FOR BIDS-
Wake County Public School System
Due by 10/13/2026
DM00529; WBS 50942.3.3; TIP BO-2413A POC DM00529 Pedestrian Improvements, Curb Ramps, and Driveway
Division of Highways
Due by 10/21/2026
NOTICE TO TRADE SUBCONTRACTORS - ADVERTISEMENT FOR BID- Athens Drive High School Additions
Wake County Public School System
Due by 11/10/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.