Generator Purchase, Removal and Installation
| Agency: | State Government of Nebraska |
|---|---|
| State: | Nebraska |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 10, 2026 |
| Due Date: | Jul 8, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
ITB 122828 ORAGENCY:
State Purchasing Bureau
PROCUREMENT CONTRACTS OFFICER(S):Brenda Sensibaugh, Kelly Rowlands
Phone: 402-471-6500 Email: as.materielpurchasing@nebraska.gov
OPENING DATE:July 8, 2026 at 2:00 PM CST
The bid opening will occur in accordance with the Schedule of Events detailed in the solicitation linked below.
PROJECT DESCRIPTION:The State of Nebraska (State), Department of Administrative Services (DAS), Materiel Division, State Purchasing Bureau (SPB), is issuing this solicitation for the purpose of selecting a qualified Bidder to provide Generator Purchase, Removal and Installation.
Written Questions regarding the project are due no later than June 22, 2026.
| Project Documents | Date Posted | Document Format(s) |
| Invitation to Bid: | 06/10/26 | Word |
| Cost Sheet: | 06/10/26 | Excel |
| Attachment A: | 06/10/26 | |
| Attachment B: | 06/10/26 | Excel |
Attachment Preview
| Inspection Point | Pass | Fail | Notes/Comments |
|---|---|---|---|
| Coolant Level/Concentration | |||
| Oil Level/Quality | |||
| Fuel Level (100% Full) | |||
| Battery Voltage (>12.6V) | |||
| Belts & Hoses Tension/Wear | |||
| Block Heater Functioning | |||
| Battery Heater Functioning | |||
| Remote Monitoring Functioning |
| Time | Voltage (L-L) | Frequency (Hz) | Load (%) | Oil PSI | Water Temp |
|---|---|---|---|---|---|
| Start | |||||
| 15 Min | |||||
| 30 Min | |||||
| 45 Min | |||||
| 60 Min |
122828 OR ATTACHMENT A
GENERATOR ACCEPTANCE TEST FORM DOCUMENT
Section 1: Site Demographics
* Site Location/Name: __________________________
* Purchase Order: __________________________
* Date of Test: __________________________
Removed Asset
* Property of State of Nebraska Tag Number: __________________________
* Manufacturer: __________________________
* Model: __________________________
* Serial Number: __________________________
Installed Asset
* Property of State of Nebraska Tag Number: __________________________
* Manufacturer: __________________________
* Model: __________________________
* Serial Number: __________________________
Section 2: Pre-Start Inspection Checklist
Check all that apply. If "Fail," provide a remediation note.
Inspection Point Pass Fail Notes/Comments
Coolant Level/Concentration
Oil Level/Quality
Fuel Level (100% Full)
Battery Voltage (>12.6V)
Belts & Hoses Tension/Wear
Block Heater Functioning
Battery Heater Functioning
Remote Monitoring
Functioning
Section 3: Load Test Data (60-Minute Run)
Time Voltage (L-L) Frequency (Hz) Load (%) Oil PSI Water Temp
Start
15 Min
30 Min
45 Min
60 Min
Section 4: Control System & Safety Verification
Verify the following safety parameters trigger correctly:
* [ ] Emergency Stop: Unit shuts down immediately when pushed.
* [ ] Remote Start: Unit engages via ATS signal.
* [ ] Fault Reset: Alarms clear properly on the control panel.
* [ ] Automatic Mode: Controller left in "AUTO" position after test.
Section 5: Final Sign-Off
Technician Certification:
I certify the above tests were performed according to manufacturer specifications.
* Signature: __________________________ Date: __________
Submit the completed "Generator Acceptance Test Form Document" to the Public Safety
Communications Department manager.
See Also
Number Request for Bid (RFB) No. 26083 Title Tree Trimming and Vegetation Control
Nebraska Public Power District
Due by 11/20/2026
Follow Snow Removal + Hauling BPA Active Contract Opportunity Notice ID FA460027Q0001 Related
DEPT OF DEFENSE
Due by 11/05/2026
Bid Title: Waste Transfer Station RFP Category: Bid Opportunities Status: Open Description: REQUEST
City of Fremont
Due by 11/06/2026
Duct Cleaning - Mahoney Manor Apartments
Lincoln Housing Authority
Due by 11/19/2026