Generator, Direct CU
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Apr 19, 2026 |
| Due Date: | May 2, 2026 |
| Solicitation No: | 2026-KM0006 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Apr 17, 2026 03:50 pm EDT
- Original Response Date: May 02, 2026 03:00 am EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: May 17, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 6115 - GENERATORS AND GENERATOR SETS, ELECTRICAL
- NAICS Code:
-
Place of Performance:
Item Name: Generator, Direct CU
NSN: 6115-01-545-5921
Part Number: 12462682-1
Minimum Quantity: 89 each
Maximum Quantity: 341 each
End Item: Bradley
Description: This Generator, Direct CU is used on the Bradley Family of Vehicles. The carrier electrical system has four batteries and charging, regulating and monitoring equipment. The batteries rovide power to start the engine and operate the electrical system when the engine is not running. Subsystems include the carrier lights, instruments and indicators, chemical air filtration, heater, and fire detection system. Two 300 ampere DC generators are driven by the power pack. The first generator is driven by a power-takeoff on the transmission and provides power for the carrier and charges the carrier batteries. The second generator is engine-mounted and is driven by a belt/pulley set up off the crankshaft. The second generator supplies the launcher with power during firing and charges the launcher batteries after firing. If the second generator cannot supply enough power to the launcher, the first generator can supply additional power, as needed, via the power relay box and wiring harness 1W11. The PTO generator (gear driven) is the primary generator, and the engine (belt driven) is the secondary generator.
Technical Data is not available for this procurement. Procurement is source controlled to C.E. Niehoff (CAGE: 76761).
Note that this is not a request for proposal.
- ZGA 6501 EAST ELEVEN MILE ROAD
- WARREN , MI 48397
- USA
- Kay Lynn Machacek
- kay.machacek@dla.mil
- Apr 17, 2026 03:50 pm EDTSources Sought (Original)
See Also
Follow 61--CABLE ASSEMBLY,SPEC Active Contract Opportunity Notice ID SPE4A626Q0463 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 2/03/2027
Follow 61--MOTOR,DIRECT CURREN, IN REPAIR/MODIFICATION OF Active Contract Opportunity Notice ID N0038325QTQ09 Related
DEPT OF DEFENSE
Due by 10/15/2026
Follow 61--CHARGER,BATTERY Active Contract Opportunity Notice ID SPE7L126U0676 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 9/15/2026
Follow 61--CABLE,RADIO FREQUEN Active Contract Opportunity Notice ID N0010426QYAHT Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Due by 10/19/2026