| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Dec 18, 2024 |
| Due Date: | Dec 19, 2024 |
| Solicitation No: | 908052.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | Gayley Towers Redevelopment (BP08 - Concrete) |
| Project Number | 908052.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump-sum contract are invited from prequalified Concrete subcontractors (hereinafter “Subcontractors”) for the following work:
1. Overall Project Description: The proposed Project involves the demolition of an existing University-owned six-level, approximately 57,075 gross square foot (GSF) apartment building on the approximately 20,831 square foot (sf) (0.48 gross acre) project site, and construction of an eight-story, approximately 112,000-gsf co-living style of housing with communal living and study spaces on each floor. Coliving housing is a hybrid of dorm-style housing with community bathrooms and shared spaces for students to cook, eat, study, and socialize. The proposed Project would provide 187 bedrooms and up to 545 beds in triple-occupancy rooms, of which at least 65 percent (358 beds) would be offered as affordable beds. When compared to the existing building, the proposed Project would result in a net increase of 445 beds (residents), and a net increase of approximately 54,925 GSF of development. 2. Bid Package 08-Concrete Description: Provide approximately 112,000 GSF of elevated deck and slab on grade. Work includes the provision of all cast in place shear walls, cast in place columns and architectural columns, all structural excavation, formwork and cast in place scope complete. Work also includes the provision and management of one (1) tower cranes, including erection and dismantle; and provision and management of two (2), two-car man lifts including loading and exit platforms and speaker systems. Provision of all power for the cranes and man lifts and management and maintenance of loading and unloading zones is also included as part of this bid package. Provision of reinforcing steel (Rebar) is not included in this Bid Package and will be bid as a separate Bid Package. The successful bidder’s subcontract will be with PCL Construction Services, Inc., the CM/Contractor on this project. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $13,516,000.00 |
| 90873.01 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
146050 - 146050 METAL BUILDING, COLD FORMED Status Stage Open Posted 6/11/2026 Bid
City of Los Angeles
Bid Due: 6/25/2026
LACDA26-058 - Fencing Services - Closing: 6/22/2026 1:00 PM Status Stage Open Posted
City of Los Angeles
Bid Due: 6/22/2026
Project: St. Vincent's Reinforced Concrete Box Culvert (RBC) Reinforced Fill (ML MP 22.18
Sonoma-Marin Area Rail Transit
Bid Due: 7/16/2026
Solicitation Number: LACDA26-058 Title: Fencing Services Department: LA County Development Authority Bid Type:
Los Angeles County
Bid Due: 6/22/2026