FY26 750kVA 3-Phase Transformer
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Illinois |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jun 4, 2026 |
| Due Date: | Jun 12, 2026 |
| Solicitation No: | FA440726Q1000 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jun 04, 2026 12:25 pm CDT
- Original Published Date: May 26, 2026 02:32 pm CDT
- Updated Date Offers Due: Jun 12, 2026 12:00 pm CDT
- Original Date Offers Due: Jun 05, 2026 10:00 am CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jun 27, 2026
- Original Inactive Date: Jun 20, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 6120 - TRANSFORMERS: DISTRIBUTION AND POWER STATION
-
NAICS Code:
- 335311 - Power, Distribution, and Specialty Transformer Manufacturing
-
Place of Performance:
Scott Air Force Base , IL 62225USA
Request the purchase of the product listed below. This acquisition is being procured utilizing NAICS Code 335311 Power, Distribution, and Specialty Transformer Manufacturing: Ballasts Lamp holders, and Starters Size Standard 600 Employees and PSC Code 6120, Transformers: Distribution and Power Station. This requirement will be a Small-Business Set-Aside. Using RFO Part 12 procedures, 375th CONS intends to evaluate submitted quotes using Lowest Price Technically Acceptable (LPTA) criteria, and a single award will be made.
To be considered for award, offerors must have an active registration in SAM. Please provide an offer for the product listed below by: 10:00 A.M. CST 5 June 2026. (All RFQ info and Transformer Specs are attached)
Copper Windings Required - Updated 4Jun26
kVA - 750 kVA 3 Phase Pad-Mount Transformer
Insulating fluid - Envirotemp FR3
Efficiency Standard - DOE 2016
High Voltage - 12470GY/7200 Volts
High Voltage kV Class - 15 kV Class
High Voltage kV BIL - 95 kV BIL
Primary Termination Style - Dead Front
Primary Feed Type - Loop Feed
Taps - 2 - 2.5% taps above and 2 - 2.5% taps below nominal
Tap Changer - 5-position tap changer
Tap Changer Switch Location - Frontplate HV Compartment
High Voltage Bushings - 200 amp Cooper bushing wells with removable studs (Quantity: 6)
Primary Ground Bushing Selection - Combined H0X0 Bushing
High Voltage Inserts - 15 kV, 95 kV BIL load-break inserts (Quantity: 6)
Loadbreak Switch(es) - 15-38 kV, 300A 2-Position (Quantity: 3)
Loadbreak Switch Location - Frontplate HV Compartment
High Voltage Arresters - Varistar elbow arresters, 15 kV class, distribution class 15 kV (Quantity: 3)
Overcurrent Protection Bayonet Fuses in series with Partial-Range Current-Limiting Fuses (Quantity: 3)
Expulsion fuses Bayonet fuses - (Quantity: 3)
Bayonet Holder - Copper Bayonet Fuse Holder (Quantity: 3)
Low Voltage - 480Y/277 Volts
Low Voltage kV Class - 1.2 kV Class
Low Voltage kV BIL - 30 kV BIL
Secondary Termination Style - Live Front
Secondary Feed Type - Radial Feed
Low Voltage Bushing Location - LV Frontplate (seg 1)
Low Voltage Bushings - Integral aluminum 12-hole spade bushing(s) (Quantity: 4)
Bushing Supports - Standard LV Bushing Support Assembly
Cabinet hardware - Penta-head cabinet door bolts
Cabinet Types - IEEE/ANSI Infrared Viewing Windows - No Window Required Bushing Layout - K 4.5 Loop feed per IEEE C57.12.34-2022 Figure 11 minimum dimensions (without bails) Special Paint - Federal Spec Number Sherwin Williams 6006, Black Bean Brown Cabinet Sill Construction - 304L Stainless steel cabinet sill Cabinet Sides Construction - 304L Stainless steel cabinet sides Tank Base Construction - 304L Stainless steel tank base FM / UL Certifications - UL Listed Liquid Level Gauge - Magnetic liquid level gauge Pressure Vacuum Gauges - Pressure/vacuum gauge Thermometer - Thermometer, dial-type Other Fittings - Schrader valve Drain Valve - Drain valve with sampler in LV Compartment (1") Fill Valve - Fill plug in LV Compartment Pressure Relief Device - Pressure relief device, 50 SCFM Ground Pads - Two-hole ground pads (Quantity: 3) Nitrogen Blanket - Yes
Cover Bolted cover
Gauges Location Inside Main Cabinet on Front Plate
- ADMINISTRATIVE ONLY NO REQUISITIONS 201 E WINTERS ST
- SCOTT AFB , IL 62225-5015
- USA
- Margret West
- margret.west@us.af.mil
- Phone Number 6182569252
- Christopher Greene
- christopher.greene.33@us.af.mil
- Phone Number 6182569261
- Jun 04, 2026 12:25 pm CDTCombined Synopsis/Solicitation (Updated)
- Jun 03, 2026 04:11 pm CDT Combined Synopsis/Solicitation (Updated)
- May 29, 2026 02:07 pm CDT Combined Synopsis/Solicitation (Updated)
- May 27, 2026 09:42 am CDT Combined Synopsis/Solicitation (Updated)
- May 26, 2026 02:32 pm CDT Combined Synopsis/Solicitation (Original)
Related Document
| May 26, 2026 | [Combined Synopsis/Solicitation (Original)] FY26 750kVA 3-Phase Transformer |
| May 27, 2026 | [Combined Synopsis/Solicitation (Updated)] FY26 750kVA 3-Phase Transformer |
| May 29, 2026 | [Combined Synopsis/Solicitation (Updated)] FY26 750kVA 3-Phase Transformer |
| Jun 3, 2026 | [Combined Synopsis/Solicitation (Updated)] FY26 750kVA 3-Phase Transformer |
See Also
Number Name Posted Date Opening Date View UE27-08-37 Unit 4 Station Services Batteries
City of Springfield
Due by 9/17/2026
Project: C26FI103254072- Request for Proposals (RFP) Manufacture and Delivery of a Base Order
Chicago Transit Authority
Due by 9/18/2026
Follow High Voltage Power Supplies (HVPS) for the Chicago Sanitary and Ship Canal
DEPT OF DEFENSE
Due by 9/24/2026
Follow High Voltage Power Supplies (HVPS) for the Chicago Sanitary and Ship Canal
DEPT OF DEFENSE
Due by 9/21/2026