FY26 G3 Aviation Solar Generator
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 31, 2026 |
| Due Date: | Apr 13, 2026 |
| Solicitation No: | W9124B26QA004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Mar 31, 2026 10:43 am PDT
- Original Published Date: Mar 27, 2026 01:14 pm PDT
- Updated Date Offers Due: Apr 13, 2026 01:00 pm PDT
- Original Date Offers Due: Apr 13, 2026 02:00 pm PDT
- Inactive Policy: Manual
- Updated Inactive Date: Mar 27, 2027
- Original Inactive Date: Mar 27, 2027
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: W061 - LEASE OR RENTAL OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
-
NAICS Code:
- 532490 - Other Commercial and Industrial Machinery and Equipment Rental and Leasing
-
Place of Performance:
Bicycle Lake Army Airfield (BLAAF), Building 6212 92310
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.
1. Can offerors supply a gas or diesel generator as a back up to the solar portion, instead of the propane generator?
While other generator types may be technically feasible, propane is the preferred solution for this application. It is highly reliable for remote sites due to its indefinite fuel shelf life and minimal maintenance requirements. Propane's clean-burning nature and closed-system refueling process also eliminate the risks of fuel system degradation and environmental spills, which are concerns with gasoline and diesel.
2. How often does the current propane generator have to turn on and run as a back up?
According to the system's performance report for 2023, the backup generator recorded zero hours of runtime. The solar array and battery bank were sufficient to handle 100% of the load, even during periods of overcast weather. Generator use is exceedingly rare and would only be anticipated during prolonged periods (e.g., 3+ days) of extreme weather with no sun.
3. What is the running wattage of the load?
Our field observations show a consistent baseline load of approximately 120 Watts (1A at 120V). This does not include ancillary equipment like the heater or fan, which cycle on periodically.
4. What is the peak wattage of the load?
The peak wattage occurs when the unit's internal heater or lens-clearing fan activates.
- KO DIRECTORATE OF CONTRACTIN 503 LANGFORD LAKE ROAD
- FORT IRWIN , CA 92310-5095
- USA
- Franklin Brown
- franklin.w.brown4.civ@army.mil
- Phone Number 7603804450
- Mar 31, 2026 10:43 am PDTCombined Synopsis/Solicitation (Updated)
- Mar 27, 2026 01:23 pm PDT Combined Synopsis/Solicitation (Updated)
- Mar 27, 2026 01:14 pm PDT Combined Synopsis/Solicitation (Original)
Related Document
| Mar 27, 2026 | [Combined Synopsis/Solicitation (Updated)] FY26 G3 Aviation Solar Generator |
| Apr 1, 2026 | [Combined Synopsis/Solicitation (Updated)] FY26 G3 Aviation Solar Generator |
See Also
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
San Antonio Water System
Due by 9/23/2026
Follow W--DUMPSTERS NEEDED FOR FWS BOMBAY HOOK NWR Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow 413th CSB Theater-wide Blanket Purchase Agreement (INDO-PACIFIC) Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 12/31/2027
Follow 413th CSB Theater-wide Blanket Purchase Agreement (INDO-PACIFIC) Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 12/31/2027