Frenchboro, ME – High Road Culvert Replacement
| Agency: | Wright-Pierce |
|---|---|
| State: | Massachusetts |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 24, 2026 |
| Due Date: | Oct 15, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The replacement of an existing 36″ CMP culvert with a 48″ HDPE culvert on High Road in Frenchboro, ME. The proposed design includes demolishing the existing culvert, new 48” HDPE culvert 45 feet in length, new concrete flow control structure, concrete headwalls, associated fill, and installation of riprap at the inlet and outlet of the proposed culvert. Roadway reconstruction work will include raising the existing roadway by approximately 1-foot, and installation of new subbase and base gravels, pavement, and guardrail.
- Follow the hyperlink to the project provided at the end of the project information.
-
First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
See Also
Header Information Bid Number: BD-26-1202-COCC1-COCC1-134910 Description: IFB 2026-23 NORTH COMMON VILLAGE ROOF REPLACEMENT
Commonwealth of Massachusetts
Due by 12/07/2026
FLAGSHIP WHARF BULKHEAD REPAIRS CONSTRUCTION Posted: 11/02/2026 - 9:00am Due: 12/10/2026 - 12:00pm
City of Boston
Due by 12/10/2026
RFP/IFB # Project Date Available Date Closes / Bids Due Submission Type Site
City of New Bedford
Due by 11/18/2026
Bid Number: 2027-011 Bid Title: Keyes Road Over Wilder Brook Culvert Replacement Category:
City of Gardner
Due by 11/12/2026